Deck 13: Culvert Design

ملء الشاشة (f)
exit full mode
سؤال
The principal goal of outcome design for a culvert is determination of the size and alignment of the culvert and provisions for erosion control.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
The number of barrels used in a culvert should be ___.

A)exactly 1
C)kept to a minimum
B)exactly 5
D)kept at maximum
سؤال
To design an inlet apron lining, compute velocity at the inlet of the culvert by using the ___________________ equation.
سؤال
Meetings are least important in the culvert design process.
سؤال
When designing an inlet apron lining, cross-sectional area is computed by using the ____________________ depth together with barrel dimensions.
سؤال
A site visit must be conducted during culvert design to verify the topography and note any features that are not clearly depicted on the maps.
سؤال
When computing the cross-sectional area of a culvert and the face of the culvert is skewed, use the dimensions ____ to the long axis of the barrel.

A)parallel
C)not associated with
B)perpendicular
D)skew
سؤال
An important environmental consideration when designing a culvert is the potential for ___________________ downstream from the culvert.
سؤال
Generally, the culvert should follow the streambed only in horizontal alignment.
سؤال
What is an advantage of designing a new culvert over replacing an old culvert?

A)fewer existing streams
C)only outlet control
B)fewer existing constraints
D)previously existing utilities
سؤال
____ is a key design parameter and constitutes the maximum height of headwater that will be allowed for the design storm.

A)Allowable headwater elevation
C)Design outcome
B)Embankment
D)Backwater
سؤال
The engineer's job in designing a culvert ____________________ often is made difficult by the physical constraints within which the design must be accomplished.
سؤال
An important environmental consideration to culvert design is ____.

A)type of soil
C)existing culverts
B)fish habitat
D)apron lining
سؤال
A typical constraint when replacing a culvert is the presence of established improvements and utilities adjacent to the existing culvert and stream.
سؤال
In many culvert replacements, the existing culvert is ____________________ inadequate because of various factors.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/15
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 13: Culvert Design
1
The principal goal of outcome design for a culvert is determination of the size and alignment of the culvert and provisions for erosion control.
True
2
The number of barrels used in a culvert should be ___.

A)exactly 1
C)kept to a minimum
B)exactly 5
D)kept at maximum
C
3
To design an inlet apron lining, compute velocity at the inlet of the culvert by using the ___________________ equation.
continuity
4
Meetings are least important in the culvert design process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
5
When designing an inlet apron lining, cross-sectional area is computed by using the ____________________ depth together with barrel dimensions.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
6
A site visit must be conducted during culvert design to verify the topography and note any features that are not clearly depicted on the maps.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
7
When computing the cross-sectional area of a culvert and the face of the culvert is skewed, use the dimensions ____ to the long axis of the barrel.

A)parallel
C)not associated with
B)perpendicular
D)skew
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
8
An important environmental consideration when designing a culvert is the potential for ___________________ downstream from the culvert.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
9
Generally, the culvert should follow the streambed only in horizontal alignment.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
10
What is an advantage of designing a new culvert over replacing an old culvert?

A)fewer existing streams
C)only outlet control
B)fewer existing constraints
D)previously existing utilities
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
11
____ is a key design parameter and constitutes the maximum height of headwater that will be allowed for the design storm.

A)Allowable headwater elevation
C)Design outcome
B)Embankment
D)Backwater
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
12
The engineer's job in designing a culvert ____________________ often is made difficult by the physical constraints within which the design must be accomplished.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
13
An important environmental consideration to culvert design is ____.

A)type of soil
C)existing culverts
B)fish habitat
D)apron lining
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
14
A typical constraint when replacing a culvert is the presence of established improvements and utilities adjacent to the existing culvert and stream.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
15
In many culvert replacements, the existing culvert is ____________________ inadequate because of various factors.