Deck 12: Storm Sewer Design

ملء الشاشة (f)
exit full mode
سؤال
A useful topographic map can be prepared by a combination of aerial and ground surveys.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
The three principal components of a storm sewer system are the ____________________, the pipe, and the outflow headwall.
سؤال
The headwall conveys stormwater toward a receiving stream.
سؤال
Inlets or manholes must be placed at each point where the ____________________ or size of the pipe changes.
سؤال
What is the most fundamental element of a storm sewer design?

A)choosing a pipe with sufficient size and grade
B)calculating the velocity of flow
C)calculating slope
D)choosing metal pipe
سؤال
An energy dissipator can be used to ____.

A)collect water for temporary storage
B)increase water velocity exiting a sewer outfall
C)get the water directly from the outfall to the stream
D)control erosion at a storm sewer outfall
سؤال
____________________ is a lining of heavy rocks covering the vulnerable ground to protect the ground surface and slow the discharging velocity at the same time.
سؤال
Type of pipe material has no bearing on pipe capacity.
سؤال
The principal goal of hydraulic design is to determine ____.

A)pipe size
C)site layout
B)discharge
D)the design storm
سؤال
The purpose of a(n) ____________________ is to protect the soil around the discharge pipe from erosion and keep the slope in place.
سؤال
If a channel exists downstream of the outlet, the riprap width is dictated by the ____________________ of the channel.
سؤال
Which is the first step in a storm sewer design investigation?

A)project meeting
B)topographic map
C)site reconnaissance
D)local land development ordinance
سؤال
Discharge exiting from the outfall is in concentrated form and, therefore, potentially damaging to unprotected ground.
سؤال
Rectangular wire mesh baskets filled with rocks and placed on the ground as a protective lining are called ____.

A)riprap
C)erosion control mats
B)gabions
D)sod
سؤال
Inlets for a storm sewer system should be placed very far apart.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/15
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 12: Storm Sewer Design
1
A useful topographic map can be prepared by a combination of aerial and ground surveys.
True
2
The three principal components of a storm sewer system are the ____________________, the pipe, and the outflow headwall.
inlet
3
The headwall conveys stormwater toward a receiving stream.
False
4
Inlets or manholes must be placed at each point where the ____________________ or size of the pipe changes.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
5
What is the most fundamental element of a storm sewer design?

A)choosing a pipe with sufficient size and grade
B)calculating the velocity of flow
C)calculating slope
D)choosing metal pipe
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
6
An energy dissipator can be used to ____.

A)collect water for temporary storage
B)increase water velocity exiting a sewer outfall
C)get the water directly from the outfall to the stream
D)control erosion at a storm sewer outfall
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
7
____________________ is a lining of heavy rocks covering the vulnerable ground to protect the ground surface and slow the discharging velocity at the same time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
8
Type of pipe material has no bearing on pipe capacity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
9
The principal goal of hydraulic design is to determine ____.

A)pipe size
C)site layout
B)discharge
D)the design storm
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
10
The purpose of a(n) ____________________ is to protect the soil around the discharge pipe from erosion and keep the slope in place.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
11
If a channel exists downstream of the outlet, the riprap width is dictated by the ____________________ of the channel.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
12
Which is the first step in a storm sewer design investigation?

A)project meeting
B)topographic map
C)site reconnaissance
D)local land development ordinance
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
13
Discharge exiting from the outfall is in concentrated form and, therefore, potentially damaging to unprotected ground.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
14
Rectangular wire mesh baskets filled with rocks and placed on the ground as a protective lining are called ____.

A)riprap
C)erosion control mats
B)gabions
D)sod
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
15
Inlets for a storm sewer system should be placed very far apart.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.