Deck 10: Capacity Management

ملء الشاشة (f)
exit full mode
سؤال
The traditional operations management definition of throughput is:

A) the average number of goods or services completed per time period by a process.
B) anything in an organization that limits it from moving toward its goal.
C) associated with the capacity of a resource such as a machine, employee, or workstation.
D) a physical activity in which idle capacity exists.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Magnira Hotels is a leading chain of hotels. Its managers reserve 30% of the rooms available only to the members of its club. They also provide the rooms at subsidized prices to these members. In this scenario, which of the following components of revenue management system is most likely used by Magnira Hotels

A) Investment
B) Allocation
C) Capacity expansion
D) Capacity sharing
سؤال
The Theory of Constraints focuses on eliminating all bottleneck activities in a process.
سؤال
In the context of strategies for expanding capacity, which of the following statements is true of one large capacity increase

A) This strategy aims to match capacity additions with demand as closely as possible.
B) An advantage of using this strategy is that the fixed costs of construction and operating system setup need to be incurred only once.
C) This strategy waits until demand has increased to a point where additional capacity is necessary.
D) When this strategy is used, there is always excess capacity and safety capacity to meet unexpected demand from large orders is provided.
سؤال
Offering complementary goods or services is an example of a short-term capacity strategy.
سؤال
Unlike a focused factory, an unfocused factory is characterized by:

A) a few key products.
B) particular market segments.
C) identical people skills.
D) dissimilar product lines.
سؤال
Diseconomies of scale are known as the capacity cushion.
سؤال
In the Theory of Constraints, constraints determine the throughput of a facility.
سؤال
A doctor's office charges no-show patients $30 if they do not cancel their appointment 24 hours prior to the appointment. In this scenario, which of the following can be used by the doctor's office to handle the risk of idle service capacity

A) A capacity straddle strategy
B) A capacity lag strategy
C) A revenue management system
D) A pull system
سؤال
_____ occur when the average unit cost of a good or service begins to increase as the capacity and/or volume of throughput increases.

A) Economies of scale
B) Diseconomies of scale
C) Demand lags
D) Nonphysical constraints
سؤال
Scorla Corp. is an apparel manufacturing factory. Its average resource utilization per year is calculated as 70%. The average safety capacity of Scorla Corp. is _____.

A) 20%
B) 30%
C) 40%
D) 50%
سؤال
In a revenue management system, forecasting, allocation, overbooking, and pricing must work in unison if the objective is to:

A) manage a nonperishable asset.
B) meet the future demand of goods and services.
C) determine the single price that needs to be charged to all customers.
D) maximize the revenue generated by a perishable asset.
سؤال
Average safety capacity (%) is computed using the formula:

A) Average resource utilization (%) -100%.
B) 100% - Average resource utilization (%).
C) [Maximum safety capacity (%) + Minimum safety capacity (%)]/2.
D) 100% - Maximum resource utilization (%).
سؤال
Avexim Pharmaceutical Laboratories is an international group of companies that manufactures an antiepileptic prescription drug in huge volumes. The setup time for manufacturing the drug is 75 minutes, the processing time is 8 minutes, and the order size is 700 units. In this case, which of the following is the total time required to meet the given production volume

A) 968 minutes
B) 1300 minutes
C) 4275 minutes
D) 5675 minutes
سؤال
The ideas and methods surrounding a revenue management system are often called yield management.
سؤال
Harlose Suits owns more equipment than required for manufacturing goods during periods of regular demand in order to tackle sudden demand surges. It also has a certain reserve of produced goods to tackle material shortages. In this case, the reserve of equipment and produced goods are examples of _____.

A) a physical constraint
B) the capacity cushion
C) overbooking
D) capacity straddle
سؤال
Long-term capacity decisions usually involve adjusting schedules or staffing levels.
سؤال
Which of the following is a way to manage capacity by shifting and stimulating demand

A) Adding peripheral goods and/or services
B) Adding or sharing equipment
C) Changing labor schedules
D) Changing labor skill mix
سؤال
Greyon Spinning Mills Inc. owns 600 spinning machines. Out of these, only 500 are used in a given year. Given this information, the utilization of spinning machines at Greyon Spinning Mills Inc. is _____.

A) 0.75
B) 0.83
C) 1
D) 1.2
سؤال
A work order is a specification of work to be performed for a customer or a client.
سؤال
A__________consists of dynamic methods to forecast demand, allocate perishable assets across market segments, decide when to overbook and by how much, and determine what price to charge different customer classes.

A) focused factory
B) work order
C) revenue management system
D) nonbottleneck work activity
سؤال
A__________matches capacity additions with demand as closely as possible.

A) capacity lag strategy
B) capacity straddle strategy
C) capacity lead strategy
D) capacity reduction strategy
سؤال
Which of the following statements is true of a work order

A) It is also called the capacity cushion.
B) It includes processing requirements for a type of work.
C) It cannot be defined for services.
D) It does not include resources needed for a type of work.
سؤال
__________are achieved when the average unit cost of a good or service decreases as the capacity and/or volume of throughput increases.

A) Unfocused factories
B) Safety capacities
C) Diseconomies of scale
D) Economies of scale
سؤال
The earliest revenue management systems focused solely on__________.

A) forecasting
B) overbooking
C) allocation
D) pricing
سؤال
Which of the following is a way to manage capacity by adjusting short-term capacity levels

A) Varying the price of goods or services
B) Adding peripheral goods and/or services
C) Providing reservations
D) Shifting work to slack periods
سؤال
Blyrie Inc., a sports goods manufacturing company, follows a policy that involves manufacturing only when the demand exceeds the amount of goods already manufactured. Given this information, Blyrie Inc. most likely uses a _____ to expand its capacity.

A) capacity lead strategy
B) capacity reduction strategy
C) capacity straddle strategy
D) capacity lag strategy
سؤال
In service industries, capacity is often viewed as the _____.

A) minimum rate of output per unit time
B) units of resource availability
C) amount of setup time
D) amount of overtime scheduled
سؤال
A _____ is a strategy for expanding capacity that waits until demand has increased to a point where additional capacity is necessary.

A) capacity lag strategy
B) capacity lead strategy
C) capacity reduction strategy
D) capacity match strategy
سؤال
Nonbottleneck management principles differ from bottleneck management principles because according to nonbottleneck management principles, _____.

A) idle time is acceptable if there is no work to do
B) an hour lost at a nonbottleneck resource is an hour lost for the entire process or factory output
C) large order sizes should be used to minimize setup time and maximize resource utilization
D) the input should always exceed the capacity
سؤال
At Rues and West Bros., a spare parts manufacturing company, the most important competitive priority is quality. Only a few key spare parts are produced using similar process designs. In this scenario, Rues and West Bros. _____.

A) is a focused factory
B) has no throughput
C) is an unfocused factory
D) uses a mass customization strategy
سؤال
In the Theory of Constraints, a__________is one that effectively limits the capacity of the entire process.

A) nonbottleneck activity
B) bottleneck work activity
C) nonphysical activity
D) core process activity
سؤال
Lumeris Inc., an automobile manufacturer, has an inflexible work schedule and requires its workers to work nine hours a day and six days a week. Its laborers do not have adequate skills to perform their job efficiently. The inflexible work schedule and inadequate labor skills are examples of _____.

A) physical constraints
B) nonphysical constraints
C) bottleneck activities
D) work orders
سؤال
Which of the following statements is true of setup time

A) It is independent of order size for manufacturing work orders.
B) It varies with the volume of work orders.
C) It is the most insignificant part of total system capacity.
D) It is usually the same for manufacturing and service-providing applications.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/34
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 10: Capacity Management
1
The traditional operations management definition of throughput is:

A) the average number of goods or services completed per time period by a process.
B) anything in an organization that limits it from moving toward its goal.
C) associated with the capacity of a resource such as a machine, employee, or workstation.
D) a physical activity in which idle capacity exists.
the average number of goods or services completed per time period by a process.
2
Magnira Hotels is a leading chain of hotels. Its managers reserve 30% of the rooms available only to the members of its club. They also provide the rooms at subsidized prices to these members. In this scenario, which of the following components of revenue management system is most likely used by Magnira Hotels

A) Investment
B) Allocation
C) Capacity expansion
D) Capacity sharing
Allocation
3
The Theory of Constraints focuses on eliminating all bottleneck activities in a process.
False
4
In the context of strategies for expanding capacity, which of the following statements is true of one large capacity increase

A) This strategy aims to match capacity additions with demand as closely as possible.
B) An advantage of using this strategy is that the fixed costs of construction and operating system setup need to be incurred only once.
C) This strategy waits until demand has increased to a point where additional capacity is necessary.
D) When this strategy is used, there is always excess capacity and safety capacity to meet unexpected demand from large orders is provided.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 34 في هذه المجموعة.
فتح الحزمة
k this deck
5
Offering complementary goods or services is an example of a short-term capacity strategy.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 34 في هذه المجموعة.
فتح الحزمة
k this deck
6
Unlike a focused factory, an unfocused factory is characterized by:

A) a few key products.
B) particular market segments.
C) identical people skills.
D) dissimilar product lines.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 34 في هذه المجموعة.
فتح الحزمة
k this deck
7
Diseconomies of scale are known as the capacity cushion.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 34 في هذه المجموعة.
فتح الحزمة
k this deck
8
In the Theory of Constraints, constraints determine the throughput of a facility.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 34 في هذه المجموعة.
فتح الحزمة
k this deck
9
A doctor's office charges no-show patients $30 if they do not cancel their appointment 24 hours prior to the appointment. In this scenario, which of the following can be used by the doctor's office to handle the risk of idle service capacity

A) A capacity straddle strategy
B) A capacity lag strategy
C) A revenue management system
D) A pull system
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 34 في هذه المجموعة.
فتح الحزمة
k this deck
10
_____ occur when the average unit cost of a good or service begins to increase as the capacity and/or volume of throughput increases.

A) Economies of scale
B) Diseconomies of scale
C) Demand lags
D) Nonphysical constraints
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 34 في هذه المجموعة.
فتح الحزمة
k this deck
11
Scorla Corp. is an apparel manufacturing factory. Its average resource utilization per year is calculated as 70%. The average safety capacity of Scorla Corp. is _____.

A) 20%
B) 30%
C) 40%
D) 50%
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 34 في هذه المجموعة.
فتح الحزمة
k this deck
12
In a revenue management system, forecasting, allocation, overbooking, and pricing must work in unison if the objective is to:

A) manage a nonperishable asset.
B) meet the future demand of goods and services.
C) determine the single price that needs to be charged to all customers.
D) maximize the revenue generated by a perishable asset.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 34 في هذه المجموعة.
فتح الحزمة
k this deck
13
Average safety capacity (%) is computed using the formula:

A) Average resource utilization (%) -100%.
B) 100% - Average resource utilization (%).
C) [Maximum safety capacity (%) + Minimum safety capacity (%)]/2.
D) 100% - Maximum resource utilization (%).
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 34 في هذه المجموعة.
فتح الحزمة
k this deck
14
Avexim Pharmaceutical Laboratories is an international group of companies that manufactures an antiepileptic prescription drug in huge volumes. The setup time for manufacturing the drug is 75 minutes, the processing time is 8 minutes, and the order size is 700 units. In this case, which of the following is the total time required to meet the given production volume

A) 968 minutes
B) 1300 minutes
C) 4275 minutes
D) 5675 minutes
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 34 في هذه المجموعة.
فتح الحزمة
k this deck
15
The ideas and methods surrounding a revenue management system are often called yield management.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 34 في هذه المجموعة.
فتح الحزمة
k this deck
16
Harlose Suits owns more equipment than required for manufacturing goods during periods of regular demand in order to tackle sudden demand surges. It also has a certain reserve of produced goods to tackle material shortages. In this case, the reserve of equipment and produced goods are examples of _____.

A) a physical constraint
B) the capacity cushion
C) overbooking
D) capacity straddle
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 34 في هذه المجموعة.
فتح الحزمة
k this deck
17
Long-term capacity decisions usually involve adjusting schedules or staffing levels.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 34 في هذه المجموعة.
فتح الحزمة
k this deck
18
Which of the following is a way to manage capacity by shifting and stimulating demand

A) Adding peripheral goods and/or services
B) Adding or sharing equipment
C) Changing labor schedules
D) Changing labor skill mix
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 34 في هذه المجموعة.
فتح الحزمة
k this deck
19
Greyon Spinning Mills Inc. owns 600 spinning machines. Out of these, only 500 are used in a given year. Given this information, the utilization of spinning machines at Greyon Spinning Mills Inc. is _____.

A) 0.75
B) 0.83
C) 1
D) 1.2
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 34 في هذه المجموعة.
فتح الحزمة
k this deck
20
A work order is a specification of work to be performed for a customer or a client.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 34 في هذه المجموعة.
فتح الحزمة
k this deck
21
A__________consists of dynamic methods to forecast demand, allocate perishable assets across market segments, decide when to overbook and by how much, and determine what price to charge different customer classes.

A) focused factory
B) work order
C) revenue management system
D) nonbottleneck work activity
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 34 في هذه المجموعة.
فتح الحزمة
k this deck
22
A__________matches capacity additions with demand as closely as possible.

A) capacity lag strategy
B) capacity straddle strategy
C) capacity lead strategy
D) capacity reduction strategy
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 34 في هذه المجموعة.
فتح الحزمة
k this deck
23
Which of the following statements is true of a work order

A) It is also called the capacity cushion.
B) It includes processing requirements for a type of work.
C) It cannot be defined for services.
D) It does not include resources needed for a type of work.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 34 في هذه المجموعة.
فتح الحزمة
k this deck
24
__________are achieved when the average unit cost of a good or service decreases as the capacity and/or volume of throughput increases.

A) Unfocused factories
B) Safety capacities
C) Diseconomies of scale
D) Economies of scale
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 34 في هذه المجموعة.
فتح الحزمة
k this deck
25
The earliest revenue management systems focused solely on__________.

A) forecasting
B) overbooking
C) allocation
D) pricing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 34 في هذه المجموعة.
فتح الحزمة
k this deck
26
Which of the following is a way to manage capacity by adjusting short-term capacity levels

A) Varying the price of goods or services
B) Adding peripheral goods and/or services
C) Providing reservations
D) Shifting work to slack periods
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 34 في هذه المجموعة.
فتح الحزمة
k this deck
27
Blyrie Inc., a sports goods manufacturing company, follows a policy that involves manufacturing only when the demand exceeds the amount of goods already manufactured. Given this information, Blyrie Inc. most likely uses a _____ to expand its capacity.

A) capacity lead strategy
B) capacity reduction strategy
C) capacity straddle strategy
D) capacity lag strategy
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 34 في هذه المجموعة.
فتح الحزمة
k this deck
28
In service industries, capacity is often viewed as the _____.

A) minimum rate of output per unit time
B) units of resource availability
C) amount of setup time
D) amount of overtime scheduled
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 34 في هذه المجموعة.
فتح الحزمة
k this deck
29
A _____ is a strategy for expanding capacity that waits until demand has increased to a point where additional capacity is necessary.

A) capacity lag strategy
B) capacity lead strategy
C) capacity reduction strategy
D) capacity match strategy
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 34 في هذه المجموعة.
فتح الحزمة
k this deck
30
Nonbottleneck management principles differ from bottleneck management principles because according to nonbottleneck management principles, _____.

A) idle time is acceptable if there is no work to do
B) an hour lost at a nonbottleneck resource is an hour lost for the entire process or factory output
C) large order sizes should be used to minimize setup time and maximize resource utilization
D) the input should always exceed the capacity
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 34 في هذه المجموعة.
فتح الحزمة
k this deck
31
At Rues and West Bros., a spare parts manufacturing company, the most important competitive priority is quality. Only a few key spare parts are produced using similar process designs. In this scenario, Rues and West Bros. _____.

A) is a focused factory
B) has no throughput
C) is an unfocused factory
D) uses a mass customization strategy
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 34 في هذه المجموعة.
فتح الحزمة
k this deck
32
In the Theory of Constraints, a__________is one that effectively limits the capacity of the entire process.

A) nonbottleneck activity
B) bottleneck work activity
C) nonphysical activity
D) core process activity
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 34 في هذه المجموعة.
فتح الحزمة
k this deck
33
Lumeris Inc., an automobile manufacturer, has an inflexible work schedule and requires its workers to work nine hours a day and six days a week. Its laborers do not have adequate skills to perform their job efficiently. The inflexible work schedule and inadequate labor skills are examples of _____.

A) physical constraints
B) nonphysical constraints
C) bottleneck activities
D) work orders
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 34 في هذه المجموعة.
فتح الحزمة
k this deck
34
Which of the following statements is true of setup time

A) It is independent of order size for manufacturing work orders.
B) It varies with the volume of work orders.
C) It is the most insignificant part of total system capacity.
D) It is usually the same for manufacturing and service-providing applications.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 34 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 34 في هذه المجموعة.