In the note "NYS P.E. Approved Roof Trusses @24" OC," P.E. stands for ____.

A) professional estimation
B) practiced estimation
C) process engineer
D) professional engineer
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
The truss ____ includes a drawing of the truss and all the engineering data required to build the truss.

A) profile
B) span
C) layout
D) detail
سؤال
The roof framing at a gable end need not include studs.
سؤال
<strong>  The accompanying figure shows a ____.</strong> A) delivery list B) detail plan C) layout plan D) floor plan <div style=padding-top: 35px> The accompanying figure shows a ____.

A) delivery list
B) detail plan
C) layout plan
D) floor plan
سؤال
To see what the engineered trusses are, refer to the truss ____ from the engineer.

A) plans
B) drawings
C) estimations
D) elevations
سؤال
On the sheet showing all the types of trusses, the profile is ____.

A) the distance between the outside walls the truss will cover
B) the engineer's letter/number designation for that truss type
C) the number of each type of truss needed for the building
D) a small drawing showing the basic shape of the truss
سؤال
The horizontal distance the top chord must extend beyond the building wall is the ____.

A) slope
B) overhang
C) span
D) pitch
سؤال
On the sheet showing all the types of trusses, the span is ____.

A) the distance between the outside walls the truss will cover
B) the engineer's letter/number designation for that truss type
C) the number of each type of truss needed for the building
D) a small drawing showing the basic shape of the truss
سؤال
A ____ is the triangle formed at the end of the roof by the two top chords of the truss and its bottom chord.

A) gable
B) detail
C) dormer
D) pinnacle
سؤال
A ____ sheet shows all the types of trusses used in the building.

A) completion
B) profile
C) plan
D) delivery
سؤال
<strong>  The accompanying figure shows a(n) ____.</strong> A) delivery list B) engineering detail C) layout plan D) floor plan <div style=padding-top: 35px> The accompanying figure shows a(n) ____.

A) delivery list
B) engineering detail
C) layout plan
D) floor plan
سؤال
<strong>  The accompanying figure shows a ____.</strong> A) dormer without overhang B) dormer with overhang C) gable-end truss without overhang D) gable-end truss with overhang <div style=padding-top: 35px> The accompanying figure shows a ____.

A) dormer without overhang
B) dormer with overhang
C) gable-end truss without overhang
D) gable-end truss with overhang
سؤال
The snow accumulation may weigh up to 40 pounds per square foot on level ground and the wind might be up to 115 miles per hour.
سؤال
The plans and elevations for the building show a minimum of information about the trusses.
سؤال
The unit rise of the roof is the ____.

A) overhang
B) slope
C) profile
D) span
سؤال
The packet of engineering drawings usually includes a truss layout plan.
سؤال
In most roofs the frame is made up primarily of rafters.
سؤال
On the sheet showing all the types of trusses, the truss ID is ____.

A) the distance between the outside walls the truss will cover
B) the engineer's letter/number designation for that truss type
C) the number of each type of truss needed for the building
D) a small drawing showing the basic shape of the truss
سؤال
The ____ plan shows each truss in place on the building, with a label to indicate the truss ID.

A) truss detail
B) truss overview
C) truss layout
D) truss profile
سؤال
In some applications, the engineer will call for the trusses to be applied in 2-ply or 3-ply.
سؤال
When an overhang is needed on the gable end, it can be built as part of the gable-end ____.

A) joint
B) wall
C) beam
D) truss
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/21
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 21: Roof Trusses
1
In the note "NYS P.E. Approved Roof Trusses @24" OC," P.E. stands for ____.

A) professional estimation
B) practiced estimation
C) process engineer
D) professional engineer
D
2
The truss ____ includes a drawing of the truss and all the engineering data required to build the truss.

A) profile
B) span
C) layout
D) detail
D
3
The roof framing at a gable end need not include studs.
False
4
<strong>  The accompanying figure shows a ____.</strong> A) delivery list B) detail plan C) layout plan D) floor plan The accompanying figure shows a ____.

A) delivery list
B) detail plan
C) layout plan
D) floor plan
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 21 في هذه المجموعة.
فتح الحزمة
k this deck
5
To see what the engineered trusses are, refer to the truss ____ from the engineer.

A) plans
B) drawings
C) estimations
D) elevations
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 21 في هذه المجموعة.
فتح الحزمة
k this deck
6
On the sheet showing all the types of trusses, the profile is ____.

A) the distance between the outside walls the truss will cover
B) the engineer's letter/number designation for that truss type
C) the number of each type of truss needed for the building
D) a small drawing showing the basic shape of the truss
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 21 في هذه المجموعة.
فتح الحزمة
k this deck
7
The horizontal distance the top chord must extend beyond the building wall is the ____.

A) slope
B) overhang
C) span
D) pitch
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 21 في هذه المجموعة.
فتح الحزمة
k this deck
8
On the sheet showing all the types of trusses, the span is ____.

A) the distance between the outside walls the truss will cover
B) the engineer's letter/number designation for that truss type
C) the number of each type of truss needed for the building
D) a small drawing showing the basic shape of the truss
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 21 في هذه المجموعة.
فتح الحزمة
k this deck
9
A ____ is the triangle formed at the end of the roof by the two top chords of the truss and its bottom chord.

A) gable
B) detail
C) dormer
D) pinnacle
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 21 في هذه المجموعة.
فتح الحزمة
k this deck
10
A ____ sheet shows all the types of trusses used in the building.

A) completion
B) profile
C) plan
D) delivery
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 21 في هذه المجموعة.
فتح الحزمة
k this deck
11
<strong>  The accompanying figure shows a(n) ____.</strong> A) delivery list B) engineering detail C) layout plan D) floor plan The accompanying figure shows a(n) ____.

A) delivery list
B) engineering detail
C) layout plan
D) floor plan
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 21 في هذه المجموعة.
فتح الحزمة
k this deck
12
<strong>  The accompanying figure shows a ____.</strong> A) dormer without overhang B) dormer with overhang C) gable-end truss without overhang D) gable-end truss with overhang The accompanying figure shows a ____.

A) dormer without overhang
B) dormer with overhang
C) gable-end truss without overhang
D) gable-end truss with overhang
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 21 في هذه المجموعة.
فتح الحزمة
k this deck
13
The snow accumulation may weigh up to 40 pounds per square foot on level ground and the wind might be up to 115 miles per hour.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 21 في هذه المجموعة.
فتح الحزمة
k this deck
14
The plans and elevations for the building show a minimum of information about the trusses.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 21 في هذه المجموعة.
فتح الحزمة
k this deck
15
The unit rise of the roof is the ____.

A) overhang
B) slope
C) profile
D) span
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 21 في هذه المجموعة.
فتح الحزمة
k this deck
16
The packet of engineering drawings usually includes a truss layout plan.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 21 في هذه المجموعة.
فتح الحزمة
k this deck
17
In most roofs the frame is made up primarily of rafters.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 21 في هذه المجموعة.
فتح الحزمة
k this deck
18
On the sheet showing all the types of trusses, the truss ID is ____.

A) the distance between the outside walls the truss will cover
B) the engineer's letter/number designation for that truss type
C) the number of each type of truss needed for the building
D) a small drawing showing the basic shape of the truss
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 21 في هذه المجموعة.
فتح الحزمة
k this deck
19
The ____ plan shows each truss in place on the building, with a label to indicate the truss ID.

A) truss detail
B) truss overview
C) truss layout
D) truss profile
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 21 في هذه المجموعة.
فتح الحزمة
k this deck
20
In some applications, the engineer will call for the trusses to be applied in 2-ply or 3-ply.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 21 في هذه المجموعة.
فتح الحزمة
k this deck
21
When an overhang is needed on the gable end, it can be built as part of the gable-end ____.

A) joint
B) wall
C) beam
D) truss
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 21 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 21 في هذه المجموعة.