In general, items of excavation, backfill, and fill materials are measured in cubic feet.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
"Bank measure" amounts are obtained by using the dimensions of the holes excavated or filled with no adjustment made to the quantities obtained for swell or compaction of materials.
سؤال
Before the estimator can measure the site work, he or she has to make an assessment of excavation requirements from data in the specifications and drawings and from information gathered on visits to the site.
سؤال
Bearing piles are classified as all of the following EXCEPT:

A)Caisson piles
B)Square timber piles
C)Steel piles
D)Round timber piles
سؤال
The soil that is extracted from an excavation is less dense than before it was excavated, so it will occupy more space than it did when it was in the ground.
سؤال
The difference between the volume of the hole and the volume of the material once it has been dug out is known as the ____ factor.

A)swell
B)growth
C)limiting
D)compaction
سؤال
The purpose of the ____ is to furnish data about the site that is necessary to undertake the design of the foundation system.

A)site report
B)soils report
C)environmental report
D)geology report
سؤال
In accordance with the general principle of measuring net quantities, excavation and backfill quantities are calculated using "____."

A)depth measure
B)composite measure
C)bank measure
D)hold measure
سؤال
Bearing piles are measured in linear feet or in linear meters.
سؤال
Contractors are usually advised in the "____" to satisfy themselves as to the present condition of the site.

A)Notice to Bidders
B)Notice to Contractors
C)Instructions to Bidders
D)Instructions to Contractors
سؤال
Measuring sitework and excavation work is the same as measuring most other work of a construction project.
سؤال
The difference between the volume of the hole to be filled and the volume of fill material used to fill is referred to as the ____ factor.

A)swell
B)limiting
C)bank
D)compaction
سؤال
____ are electronic devices that enable the user to take measurements from drawings and input the data directly into a computer program.

A)Digitizers
B)Analyzers
C)Analogs
D)Probes
سؤال
The volume of excavation for pits or basements can be obtained by using which formula?

A)Pit Volume = Average Length of Pit + Average Width of Pit + Average Depth of Pit
B)Pit Volume = Average Length of Pit X Average Width of Pit X Average Depth of Pit
C)Pit Volume = Average Length of Pit / Average Width of Pit X Average Depth of Pit
D)Pit Volume = Average Length of Pit X Average Width of Pit / Average Depth of Pit
سؤال
Generally, the volume of backfill for a trench is equal to the volume of excavation minus the volume of what is to be contained within the trench.
سؤال
Sheet piling is measured in _____.

A)square feet
B)cubic feet
C)cubic meters
D)square yards
سؤال
OSHA's Construction Safety and Health Regulation s require that the sides of all earth embankments and trenches over 6'0"deep be adequately protected by a shoring system or by cutting back the sides of the excavations to a safe angle.
سؤال
When a soils report is included with the specifications, it is usually a bid document.
سؤال
The soils report provides information about the subsurface conditions at the site obtained from bore holes or other investigations made by the topographic engineer.
سؤال
Calculation by the "________" method requires a survey of the site showing the elevation of the existing grade at each intersection point on the grid.

A)grid
B)grade
C)elevation
D)intersection
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/20
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 4: Measuring Sitework, Excavation and Piling
1
In general, items of excavation, backfill, and fill materials are measured in cubic feet.
False
2
"Bank measure" amounts are obtained by using the dimensions of the holes excavated or filled with no adjustment made to the quantities obtained for swell or compaction of materials.
True
3
Before the estimator can measure the site work, he or she has to make an assessment of excavation requirements from data in the specifications and drawings and from information gathered on visits to the site.
True
4
Bearing piles are classified as all of the following EXCEPT:

A)Caisson piles
B)Square timber piles
C)Steel piles
D)Round timber piles
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
5
The soil that is extracted from an excavation is less dense than before it was excavated, so it will occupy more space than it did when it was in the ground.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
6
The difference between the volume of the hole and the volume of the material once it has been dug out is known as the ____ factor.

A)swell
B)growth
C)limiting
D)compaction
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
7
The purpose of the ____ is to furnish data about the site that is necessary to undertake the design of the foundation system.

A)site report
B)soils report
C)environmental report
D)geology report
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
8
In accordance with the general principle of measuring net quantities, excavation and backfill quantities are calculated using "____."

A)depth measure
B)composite measure
C)bank measure
D)hold measure
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
9
Bearing piles are measured in linear feet or in linear meters.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
10
Contractors are usually advised in the "____" to satisfy themselves as to the present condition of the site.

A)Notice to Bidders
B)Notice to Contractors
C)Instructions to Bidders
D)Instructions to Contractors
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
11
Measuring sitework and excavation work is the same as measuring most other work of a construction project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
12
The difference between the volume of the hole to be filled and the volume of fill material used to fill is referred to as the ____ factor.

A)swell
B)limiting
C)bank
D)compaction
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
13
____ are electronic devices that enable the user to take measurements from drawings and input the data directly into a computer program.

A)Digitizers
B)Analyzers
C)Analogs
D)Probes
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
14
The volume of excavation for pits or basements can be obtained by using which formula?

A)Pit Volume = Average Length of Pit + Average Width of Pit + Average Depth of Pit
B)Pit Volume = Average Length of Pit X Average Width of Pit X Average Depth of Pit
C)Pit Volume = Average Length of Pit / Average Width of Pit X Average Depth of Pit
D)Pit Volume = Average Length of Pit X Average Width of Pit / Average Depth of Pit
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
15
Generally, the volume of backfill for a trench is equal to the volume of excavation minus the volume of what is to be contained within the trench.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
16
Sheet piling is measured in _____.

A)square feet
B)cubic feet
C)cubic meters
D)square yards
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
17
OSHA's Construction Safety and Health Regulation s require that the sides of all earth embankments and trenches over 6'0"deep be adequately protected by a shoring system or by cutting back the sides of the excavations to a safe angle.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
18
When a soils report is included with the specifications, it is usually a bid document.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
19
The soils report provides information about the subsurface conditions at the site obtained from bore holes or other investigations made by the topographic engineer.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
20
Calculation by the "________" method requires a survey of the site showing the elevation of the existing grade at each intersection point on the grid.

A)grid
B)grade
C)elevation
D)intersection
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.