Deck 10: Pricing Excavation and Backfill
1
Changes in productivity should be dealt with in the same component of the unit price as wage rate changes for the most accuracy.
False
2
Pit and sump excavation is mostly performed using ____.
A)shovels
B)front-end loaders
C)backhoes
D)excavators
A)shovels
B)front-end loaders
C)backhoes
D)excavators
C
3
Backfill material that is compacted will be more dense than before it is compacted so, to fill a certain volume with compacted material, a larger volume of loose material will be required.
True
4
The ____ is an allowance for the extra material required to fill volumes with compacted material rather than loose material.
A)growth factor
B)stability factor
C)compaction factor
D)compression factor
A)growth factor
B)stability factor
C)compaction factor
D)compression factor
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
5
A large-size excavation company is generally equipped to effectively perform all types of excavation work.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
6
Whenever it is possible, the contractor will use the material excavated at the site for backfill requirements.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
7
Generally a large project causes crews and equipment to have low rates of productivity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
8
____ are used when loads that are oversize are transported.
A)Lead trucks
B)Beacon trucks
C)Scout trucks
D)Flag trucks
A)Lead trucks
B)Beacon trucks
C)Scout trucks
D)Flag trucks
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
9
The cost of transporting equipment includes the cost of loading, unloading, and trucking requirements.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
10
Material prices for backfill have three main components.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
11
Tracking productivity rates separately from prices also has the advantage of "____"-the same productivity rates can be used in different localities, only the wage rates have to be adjusted to reflect pay rates that differ from place to place.
A)transportability
B)availability
C)transparency
D)efficiency
A)transportability
B)availability
C)transparency
D)efficiency
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
12
Transportation of major items of equipment-backhoes, bulldozers, loaders, power shovels, and the like-is better priced on an item- by- item basis.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
13
Excavation contractors tend to concentrate on a single specific type of construction.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
14
The cost of transporting minor items of equipment such as plate compactors, small rollers, bobcats, and small tractors to and from the site is priced on the General Expense Sheet under the item "____."
A)Loading and Material Handling
B)Trucking and Material Handling
C)Trucking and Material Storage
D)Loading and Trucking
A)Loading and Material Handling
B)Trucking and Material Handling
C)Trucking and Material Storage
D)Loading and Trucking
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
15
Which of the following types of excavation methods uses scrapers, dozers, rollers, water trucks, and graders?
A)Site cut-and-fill operations
B)Basement-type excavations
C)Trench excavations
D)Pit and sump excavations
A)Site cut-and-fill operations
B)Basement-type excavations
C)Trench excavations
D)Pit and sump excavations
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
16
When soil or gravel is excavated, the resulting material is less dense than it was in the ground before it was disturbed. This same material now occupies more volume, a concept called the ____.
A)compaction factor
B)swell factor
C)stability factor
D)growth factor
A)compaction factor
B)swell factor
C)stability factor
D)growth factor
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
17
The equipment used in cut-and-fill operations depends mostly on the ____ of the project.
A)scale
B)region
C)code requirements
D)timeline
A)scale
B)region
C)code requirements
D)timeline
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
18
All of the following are considered job factors that impact the productivity of excavation and backfilling operations EXCEPT ________.
A)type of material excavated or backfilled
B)access to or around site
C)project size and complexity
D)quality of job labor
A)type of material excavated or backfilled
B)access to or around site
C)project size and complexity
D)quality of job labor
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
19
In order to determine the labor price per unit of excavation work, four elements have to be considered: 1)the number of workers that comprise the work and crew; 2)the wage rates of the trades involved; 3)the probable productivity rate of the crew or the equipment they are operating; and 4)the productivity time factor.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
20
Perhaps the most important job factors that must be established before an estimate of any trade can be prepared are the ____ and equipment prices prevailing at the location of the project under consideration.
A)trade labor times
B)trade lead times
C)trade qualifications
D)trade wage rates
A)trade labor times
B)trade lead times
C)trade qualifications
D)trade wage rates
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck