Deck 17: Supplement J Operations Scheduling

ملء الشاشة (f)
exit full mode
سؤال
Why is flow time an important measure of performance?
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Makespan is the time of completion of a group of jobs, plus the starting time of the first job.
سؤال
Which of the following statements on an operations schedule is best?

A) It determines when employees work.
B) It assigns employees to tasks depending on availability.
C) It assigns customers to a definite time for order fulfillment.
D) It assigns jobs to workstations or employees to jobs for specified time periods.
سؤال
Operations scheduling involves assigning jobs to workstations or employees to jobs for specific time periods.
سؤال
________ is the total amount of time required to complete a group of jobs.
سؤال
________ is the degree to which equipment, space, or the workforce is currently being used.
سؤال
________ scheduling assigns jobs to machines or employees to jobs.
سؤال
In the context of operations scheduling, total inventory is equal to:

A) scheduled receipts plus on-hand inventories.
B) received orders minus scheduled receipts.
C) on-hand inventories plus received orders.
D) None of these is equal to total inventory.
سؤال
Describe the difference between front office and back office operations from the standpoint of scheduling customer jobs.
سؤال
Operations scheduling applies only to manufacturing, because services do not allow inventories.
سؤال
The sum of scheduled receipts for all items and the on-hand inventories for all items is ________.
سؤال
The percent of work time productively spent by an employee or a machine is called:

A) activation.
B) efficiency.
C) effectiveness.
D) utilization.
سؤال
An appropriate objective for a manufacturing firm is to maximize total inventory.
سؤال
A job's flow time at a single workstation is defined as the:

A) completion time of the job plus the time since it arrived at the workstation.
B) processing time to complete the job.
C) time of completion of the last job of a group minus the starting time of the first job.
D) amount of time by which a group of jobs missed their due dates.
سؤال
In the context of operations scheduling, total inventory is the sum of the scheduled receipts for all items and the on-hand inventories for all items.
سؤال
A(n) ________ is the object receiving service or being manufactured.
سؤال
________ is the time a job spends in the service or manufacturing system.
سؤال
Utilization is the degree to which equipment, space, or the workforce is currently being used, measured as the ratio of average output rate to the maximum capacity.
سؤال
________ is the amount of time by which a job missed its due date.
سؤال
Makespan is the total amount of time to complete a single job or the first job in a group of jobs.
سؤال
When using the critical ratio (CR) priority sequencing rule:

A) a ratio of less than 1.0 implies that the job is ahead of schedule.
B) a ratio of less than 1.0 implies the job is behind schedule.
C) the job with the earliest due date is scheduled next.
D) the job with the highest CR is scheduled next.
سؤال
Table J.1
The framing department has six jobs waiting to be processed. It is now time zero. Times are expressed in terms of days.
<strong>Table J.1 The framing department has six jobs waiting to be processed. It is now time zero. Times are expressed in terms of days.   Using the information in Table J.1 and the EDD rule, what is the average early time?</strong> A) 0 days B) greater than 0 but less than 1.5 days C) greater than 2.5 but less than 2.5 days D) greater than 2.5 days <div style=padding-top: 35px>
Using the information in Table J.1 and the EDD rule, what is the average early time?

A) 0 days
B) greater than 0 but less than 1.5 days
C) greater than 2.5 but less than 2.5 days
D) greater than 2.5 days
سؤال
The fact that job shops routinely accept new orders at any time makes the scheduling environment dynamic.
سؤال
Which one of the following rules tends to perform well with respect to percentage of jobs past due and variance of hours past due, but performs relatively poorly with respect to average flow time?

A) earliest due date
B) shortest processing time
C) first-come, first-served
D) longest processing time
سؤال
Table J.1
The framing department has six jobs waiting to be processed. It is now time zero. Times are expressed in terms of days.
<strong>Table J.1 The framing department has six jobs waiting to be processed. It is now time zero. Times are expressed in terms of days.   Using the information in Table J.1 and the EDD rule, what is the average flow time?</strong> A) fewer than or equal to 25 days B) greater than 25 days but fewer than or equal to 27 days C) greater than 27 days but fewer than or equal to 29 days D) greater than 29 days <div style=padding-top: 35px>
Using the information in Table J.1 and the EDD rule, what is the average flow time?

A) fewer than or equal to 25 days
B) greater than 25 days but fewer than or equal to 27 days
C) greater than 27 days but fewer than or equal to 29 days
D) greater than 29 days
سؤال
A manufacturer's flow shop utilizes line or continuous flow processes.
سؤال
A job shop is accompanied by divergent flows and low-to-medium volume output rates.
سؤال
Table J.1
The framing department has six jobs waiting to be processed. It is now time zero. Times are expressed in terms of days.
<strong>Table J.1 The framing department has six jobs waiting to be processed. It is now time zero. Times are expressed in terms of days.   Using the information in Table J.1 and the SPT rule, what is the average flow time?</strong> A) fewer than or equal to 19 days B) greater than 19 days but fewer than or equal to 21 days C) greater than 21 days but fewer than or equal to 23 days D) greater than 23 days <div style=padding-top: 35px>
Using the information in Table J.1 and the SPT rule, what is the average flow time?

A) fewer than or equal to 19 days
B) greater than 19 days but fewer than or equal to 21 days
C) greater than 21 days but fewer than or equal to 23 days
D) greater than 23 days
سؤال
Table J.2
Stu Dent reviews the syllabi he received on the first day of class and pulls out his planner. He has seven major assignments that must be completed before the end of the semester.
<strong>Table J.2 Stu Dent reviews the syllabi he received on the first day of class and pulls out his planner. He has seven major assignments that must be completed before the end of the semester.   What is the average flow time for all assignments scheduled in an SPT sequence?</strong> A) 28.65 B) 32.14 C) 35.92 D) 36.88 <div style=padding-top: 35px>
What is the average flow time for all assignments scheduled in an SPT sequence?

A) 28.65
B) 32.14
C) 35.92
D) 36.88
سؤال
Slack is the difference between the time remaining until a job's due date and the total shop time remaining, excluding that of the operation being scheduled.
سؤال
When choosing a priority sequencing rule:

A) select multiple-dimension rules because they dominate single-dimension rules for all performance measures.
B) always select the rule that minimizes the amount of past-due jobs.
C) test a variety of rules before making a decision.
D) select CR or S/RO because they use more information.
سؤال
Critical ratio (CR) is a single-dimension priority rule.
سؤال
Sequencing jobs does not affect tardiness, because processing times are unchanged with different sequences.
سؤال
The earliest due date (EDD) rule gives the job with the shortest processing time the highest priority.
سؤال
A first-come, first-served schedule minimizes the average flow time for all jobs.
سؤال
Table J.2
Stu Dent reviews the syllabi he received on the first day of class and pulls out his planner. He has seven major assignments that must be completed before the end of the semester.
<strong>Table J.2 Stu Dent reviews the syllabi he received on the first day of class and pulls out his planner. He has seven major assignments that must be completed before the end of the semester.   Develop an SPT sequence and calculate the average number of assignments Stu has this semester.</strong> A) 3.36 B) 3.52 C) 3.78 D) 3.94 <div style=padding-top: 35px>
Develop an SPT sequence and calculate the average number of assignments Stu has this semester.

A) 3.36
B) 3.52
C) 3.78
D) 3.94
سؤال
Determining a production sequence for a group of jobs in a two-station flow shop to minimize the makespan has the advantage of:

A) maximizing the utilization of the shop.
B) minimizing the percentage of jobs past due.
C) minimizing the flow time of jobs on the first machine.
D) minimizing the variance of past-due hours.
سؤال
Table J.1
The framing department has six jobs waiting to be processed. It is now time zero. Times are expressed in terms of days.
<strong>Table J.1 The framing department has six jobs waiting to be processed. It is now time zero. Times are expressed in terms of days.   Using the information in Table J.1 and the FCFS rule, what is the average flow time?</strong> A) fewer than or equal to 19 days B) greater than 19 days but fewer than or equal to 21 days C) greater than 21 days but fewer than or equal to 23 days D) greater than 23 days <div style=padding-top: 35px>
Using the information in Table J.1 and the FCFS rule, what is the average flow time?

A) fewer than or equal to 19 days
B) greater than 19 days but fewer than or equal to 21 days
C) greater than 21 days but fewer than or equal to 23 days
D) greater than 23 days
سؤال
Table J.1
The framing department has six jobs waiting to be processed. It is now time zero. Times are expressed in terms of days.
<strong>Table J.1 The framing department has six jobs waiting to be processed. It is now time zero. Times are expressed in terms of days.   Using the information in Table J.1 and the SPT rule, what is the average past due?</strong> A) 0 days B) greater than 0 days but fewer than or equal to 5 days C) greater than 5 days but fewer than or equal to 10 days D) greater than 10 days <div style=padding-top: 35px>
Using the information in Table J.1 and the SPT rule, what is the average past due?

A) 0 days
B) greater than 0 days but fewer than or equal to 5 days
C) greater than 5 days but fewer than or equal to 10 days
D) greater than 10 days
سؤال
Table J.1
The framing department has six jobs waiting to be processed. It is now time zero. Times are expressed in terms of days.
<strong>Table J.1 The framing department has six jobs waiting to be processed. It is now time zero. Times are expressed in terms of days.   Using the information in Table J.1 and the FCFS rule, what is the average past due?</strong> A) 0 days B) greater than 0 days but fewer than or equal to 5.5 days C) greater than 5.5 days but fewer than or equal to 10 days D) greater than 10 days <div style=padding-top: 35px>
Using the information in Table J.1 and the FCFS rule, what is the average past due?

A) 0 days
B) greater than 0 days but fewer than or equal to 5.5 days
C) greater than 5.5 days but fewer than or equal to 10 days
D) greater than 10 days
سؤال
Table J.7
The following four jobs just arrived (end of hour 0) at Workstation A. They are the only ones waiting to be processed.
<strong>Table J.7 The following four jobs just arrived (end of hour 0) at Workstation A. They are the only ones waiting to be processed.   Using the information in Table J.7 and the S/RO rule, what is the average flow time at Workstation A?</strong> A) fewer than or equal to 14.0 hours B) greater than 14.0 but fewer than or equal to 14.5 hours C) greater than 14.5 but fewer than or equal to 15.0 hours D) greater than 15.0 hours <div style=padding-top: 35px>
Using the information in Table J.7 and the S/RO rule, what is the average flow time at Workstation A?

A) fewer than or equal to 14.0 hours
B) greater than 14.0 but fewer than or equal to 14.5 hours
C) greater than 14.5 but fewer than or equal to 15.0 hours
D) greater than 15.0 hours
سؤال
Table J.5
The following three jobs just arrived (end of hour 0) at Workstation A. They are the only ones waiting to be processed.
<strong>Table J.5 The following three jobs just arrived (end of hour 0) at Workstation A. They are the only ones waiting to be processed.   Use the information in Table J.5. The sequence of jobs using the slack per remaining operations (S/RO) rule, is:</strong> A) 1-3-2 B) 3-2-1 C) 1-2-3 D) 2-3-1 <div style=padding-top: 35px>
Use the information in Table J.5. The sequence of jobs using the slack per remaining operations (S/RO) rule, is:

A) 1-3-2
B) 3-2-1
C) 1-2-3
D) 2-3-1
سؤال
Table J.2
Stu Dent reviews the syllabi he received on the first day of class and pulls out his planner. He has seven major assignments that must be completed before the end of the semester.
<strong>Table J.2 Stu Dent reviews the syllabi he received on the first day of class and pulls out his planner. He has seven major assignments that must be completed before the end of the semester.   What is the average flow time for all seven assignments if Stu schedules them using the critical ration criterion?</strong> A) 38.17 B) 37.43 C) 36.67 D) 38.26 <div style=padding-top: 35px>
What is the average flow time for all seven assignments if Stu schedules them using the critical ration criterion?

A) 38.17
B) 37.43
C) 36.67
D) 38.26
سؤال
Table J.2
Stu Dent reviews the syllabi he received on the first day of class and pulls out his planner. He has seven major assignments that must be completed before the end of the semester.
<strong>Table J.2 Stu Dent reviews the syllabi he received on the first day of class and pulls out his planner. He has seven major assignments that must be completed before the end of the semester.   Stu decides to adopt an EDD sequence for the assignments, which seems like a very logical approach. Which assignments will he be submitting late?</strong> A) C, D and F B) B, C and F C) B, E and G D) F, E and G <div style=padding-top: 35px>
Stu decides to adopt an EDD sequence for the assignments, which seems like a very logical approach. Which assignments will he be submitting late?

A) C, D and F
B) B, C and F
C) B, E and G
D) F, E and G
سؤال
Table J.2
Stu Dent reviews the syllabi he received on the first day of class and pulls out his planner. He has seven major assignments that must be completed before the end of the semester.
<strong>Table J.2 Stu Dent reviews the syllabi he received on the first day of class and pulls out his planner. He has seven major assignments that must be completed before the end of the semester.   Stu schedules his assignments using the critical ratio criterion. How many assignments are late?</strong> A) 3 B) 4 C) 5 D) 6 <div style=padding-top: 35px>
Stu schedules his assignments using the critical ratio criterion. How many assignments are late?

A) 3
B) 4
C) 5
D) 6
سؤال
Table J.2
Stu Dent reviews the syllabi he received on the first day of class and pulls out his planner. He has seven major assignments that must be completed before the end of the semester.
<strong>Table J.2 Stu Dent reviews the syllabi he received on the first day of class and pulls out his planner. He has seven major assignments that must be completed before the end of the semester.   Stu decides to adopt an SPT sequence for the assignments, which at face value seems like an odd choice. Which assignments will he be submitting late?</strong> A) C, D and F B) B, C and F C) B, E and G D) F, E and G <div style=padding-top: 35px>
Stu decides to adopt an SPT sequence for the assignments, which at face value seems like an odd choice. Which assignments will he be submitting late?

A) C, D and F
B) B, C and F
C) B, E and G
D) F, E and G
سؤال
Table J.6
All of the following three jobs just arrived (end of hour 0) at Workstation A. They are the only ones waiting to be processed.
<strong>Table J.6 All of the following three jobs just arrived (end of hour 0) at Workstation A. They are the only ones waiting to be processed.   Use the information in Table J.6. What is the average flow time at Workstation A for the critical ratio rule?</strong> A) fewer than or equal to 8 hours B) greater than 8 hours but fewer than or equal to 9 hours C) greater than 9 hours but fewer than or equal to 10 hours D) greater than 10 hours <div style=padding-top: 35px>
Use the information in Table J.6. What is the average flow time at Workstation A for the critical ratio rule?

A) fewer than or equal to 8 hours
B) greater than 8 hours but fewer than or equal to 9 hours
C) greater than 9 hours but fewer than or equal to 10 hours
D) greater than 10 hours
سؤال
Table J.5
The following three jobs just arrived (end of hour 0) at Workstation A. They are the only ones waiting to be processed.
<strong>Table J.5 The following three jobs just arrived (end of hour 0) at Workstation A. They are the only ones waiting to be processed.   Use the information in Table J.5. The average past due using the slack per remaining operations (S/RO) rule is:</strong> A) fewer than or equal to 9.0. B) greater than 9.0 but fewer than or equal to 18.0. C) greater than 18.0 but fewer than or equal to 27.0. D) greater than 27.0. <div style=padding-top: 35px>
Use the information in Table J.5. The average past due using the slack per remaining operations (S/RO) rule is:

A) fewer than or equal to 9.0.
B) greater than 9.0 but fewer than or equal to 18.0.
C) greater than 18.0 but fewer than or equal to 27.0.
D) greater than 27.0.
سؤال
Table J.7
The following four jobs just arrived (end of hour 0) at Workstation A. They are the only ones waiting to be processed.
<strong>Table J.7 The following four jobs just arrived (end of hour 0) at Workstation A. They are the only ones waiting to be processed.   Using the information in Table J.7 and the critical ratio (CR) rule, what is the job sequence?</strong> A) C-D-B-A B) D-C-B-A C) A-C-D-B D) D-B-A-C <div style=padding-top: 35px>
Using the information in Table J.7 and the critical ratio (CR) rule, what is the job sequence?

A) C-D-B-A
B) D-C-B-A
C) A-C-D-B
D) D-B-A-C
سؤال
Table J.7
The following four jobs just arrived (end of hour 0) at Workstation A. They are the only ones waiting to be processed.
<strong>Table J.7 The following four jobs just arrived (end of hour 0) at Workstation A. They are the only ones waiting to be processed.   Using the information in Table J.7 and the CR rule, what is the average flow time at workstation A?</strong> A) fewer than or equal to 14.0 hours B) greater than 14.0 but fewer than or equal to 14.5 hours C) greater than 14.5 but fewer than or equal to 15.0 hours D) greater than 15.0 hours <div style=padding-top: 35px>
Using the information in Table J.7 and the CR rule, what is the average flow time at workstation A?

A) fewer than or equal to 14.0 hours
B) greater than 14.0 but fewer than or equal to 14.5 hours
C) greater than 14.5 but fewer than or equal to 15.0 hours
D) greater than 15.0 hours
سؤال
Table J.5
The following three jobs just arrived (end of hour 0) at Workstation A. They are the only ones waiting to be processed.
<strong>Table J.5 The following three jobs just arrived (end of hour 0) at Workstation A. They are the only ones waiting to be processed.   Use the information in Table J.5. The operations sequence of jobs, using the critical ratio (CR) rule, is</strong> A) 3-1-2 B) 3-2-1 C) 1-2-3 D) 2-3-1 <div style=padding-top: 35px>
Use the information in Table J.5. The operations sequence of jobs, using the critical ratio (CR) rule, is

A) 3-1-2
B) 3-2-1
C) 1-2-3
D) 2-3-1
سؤال
Table J.8
Auto Data produces custom engineering testing equipment. The following six jobs are currently in the design department. The time since each one arrived, the processing time, and the due date are shown below. All times are expressed in terms of days. Let now be the beginning of Day 1.
<strong>Table J.8 Auto Data produces custom engineering testing equipment. The following six jobs are currently in the design department. The time since each one arrived, the processing time, and the due date are shown below. All times are expressed in terms of days. Let now be the beginning of Day 1.   Using the information in Table J.8 and the FCFS rule, what is the average days past due?</strong> A) fewer than or equal to 5.0 days B) greater than 5.0 days but fewer than or equal to 8.0 days C) greater than 8.0 days but fewer than or equal to 9.0 days D) greater than 9.0 days <div style=padding-top: 35px>
Using the information in Table J.8 and the FCFS rule, what is the average days past due?

A) fewer than or equal to 5.0 days
B) greater than 5.0 days but fewer than or equal to 8.0 days
C) greater than 8.0 days but fewer than or equal to 9.0 days
D) greater than 9.0 days
سؤال
Table J.7
The following four jobs just arrived (end of hour 0) at Workstation A. They are the only ones waiting to be processed.
<strong>Table J.7 The following four jobs just arrived (end of hour 0) at Workstation A. They are the only ones waiting to be processed.   Using the information in Table J.7 and the slack per remaining operations (S/RO) rule, what is the job sequence?</strong> A) A-B-C-D B) A-C-D-B C) C-D-B-A D) D-C-B-A <div style=padding-top: 35px>
Using the information in Table J.7 and the slack per remaining operations (S/RO) rule, what is the job sequence?

A) A-B-C-D
B) A-C-D-B
C) C-D-B-A
D) D-C-B-A
سؤال
Table J.5
The following three jobs just arrived (end of hour 0) at Workstation A. They are the only ones waiting to be processed.
<strong>Table J.5 The following three jobs just arrived (end of hour 0) at Workstation A. They are the only ones waiting to be processed.   Use the information in Table J.5. The average past due using the ratio (CR) rule, is:</strong> A) fewer than or equal to 9.0. B) greater than 9.0 but fewer than or equal to 18.0. C) greater than 18.0 but fewer than or equal to 27.0. D) greater than 27.0. <div style=padding-top: 35px>
Use the information in Table J.5. The average past due using the ratio (CR) rule, is:

A) fewer than or equal to 9.0.
B) greater than 9.0 but fewer than or equal to 18.0.
C) greater than 18.0 but fewer than or equal to 27.0.
D) greater than 27.0.
سؤال
Table J.6
All of the following three jobs just arrived (end of hour 0) at Workstation A. They are the only ones waiting to be processed.
<strong>Table J.6 All of the following three jobs just arrived (end of hour 0) at Workstation A. They are the only ones waiting to be processed.   Use the information in Table J.6. What is the job sequence at Workstation A, using the critical ratio rule?</strong> A) 3-2-1 B) 1-2-3 C) 1-3-2 D) 2-1-3 <div style=padding-top: 35px>
Use the information in Table J.6. What is the job sequence at Workstation A, using the critical ratio rule?

A) 3-2-1
B) 1-2-3
C) 1-3-2
D) 2-1-3
سؤال
Table J.2
Stu Dent reviews the syllabi he received on the first day of class and pulls out his planner. He has seven major assignments that must be completed before the end of the semester.
<strong>Table J.2 Stu Dent reviews the syllabi he received on the first day of class and pulls out his planner. He has seven major assignments that must be completed before the end of the semester.   Stu applies the critical ratio method to scheduling his assignments. Which assignment is the fourth one in his sequence?</strong> A) E B) G C) C D) D <div style=padding-top: 35px>
Stu applies the critical ratio method to scheduling his assignments. Which assignment is the fourth one in his sequence?

A) E
B) G
C) C
D) D
سؤال
Table J.2
Stu Dent reviews the syllabi he received on the first day of class and pulls out his planner. He has seven major assignments that must be completed before the end of the semester.
<strong>Table J.2 Stu Dent reviews the syllabi he received on the first day of class and pulls out his planner. He has seven major assignments that must be completed before the end of the semester.   Stu whips up a schedule based on the critical ratio criterion. What is the average number of assignments in the system?</strong> A) 3.91 B) 3.71 C) 3.53 D) 3.14 <div style=padding-top: 35px>
Stu whips up a schedule based on the critical ratio criterion. What is the average number of assignments in the system?

A) 3.91
B) 3.71
C) 3.53
D) 3.14
سؤال
Table J.8
Auto Data produces custom engineering testing equipment. The following six jobs are currently in the design department. The time since each one arrived, the processing time, and the due date are shown below. All times are expressed in terms of days. Let now be the beginning of Day 1.
<strong>Table J.8 Auto Data produces custom engineering testing equipment. The following six jobs are currently in the design department. The time since each one arrived, the processing time, and the due date are shown below. All times are expressed in terms of days. Let now be the beginning of Day 1.   Using the information in Table J.8 and the SPT rule, what is the average days past due?</strong> A) fewer than or equal to 6.0 days B) greater than 6.0 days but fewer than or equal to 7.0 days C) greater than 7.0 days but fewer than or equal to 8.0 days D) greater than 8.0 days <div style=padding-top: 35px>
Using the information in Table J.8 and the SPT rule, what is the average days past due?

A) fewer than or equal to 6.0 days
B) greater than 6.0 days but fewer than or equal to 7.0 days
C) greater than 7.0 days but fewer than or equal to 8.0 days
D) greater than 8.0 days
سؤال
Table J.8
Auto Data produces custom engineering testing equipment. The following six jobs are currently in the design department. The time since each one arrived, the processing time, and the due date are shown below. All times are expressed in terms of days. Let now be the beginning of Day 1.
<strong>Table J.8 Auto Data produces custom engineering testing equipment. The following six jobs are currently in the design department. The time since each one arrived, the processing time, and the due date are shown below. All times are expressed in terms of days. Let now be the beginning of Day 1.   Using the information in Table J.8 and the EDD rule, what is the average days past due?</strong> A) fewer than or equal to 8.0 days B) greater than 8.0 days but fewer than or equal to 9.5 days C) greater than 9.5 but fewer than or equal to 11.0 days D) greater than 11.0 days <div style=padding-top: 35px>
Using the information in Table J.8 and the EDD rule, what is the average days past due?

A) fewer than or equal to 8.0 days
B) greater than 8.0 days but fewer than or equal to 9.5 days
C) greater than 9.5 but fewer than or equal to 11.0 days
D) greater than 11.0 days
سؤال
Table J.6
All of the following three jobs just arrived (end of hour 0) at Workstation A. They are the only ones waiting to be processed.
<strong>Table J.6 All of the following three jobs just arrived (end of hour 0) at Workstation A. They are the only ones waiting to be processed.   Use the information in Table J.6. What is the average past due time at Workstation A for the critical ratio rule?</strong> A) 0 hours B) greater than 0 hours but fewer than or equal to 5 hours C) greater than 5 hours but fewer than or equal to 10 hours D) greater than 10 hours <div style=padding-top: 35px>
Use the information in Table J.6. What is the average past due time at Workstation A for the critical ratio rule?

A) 0 hours
B) greater than 0 hours but fewer than or equal to 5 hours
C) greater than 5 hours but fewer than or equal to 10 hours
D) greater than 10 hours
سؤال
Table J.18
<strong>Table J.18   Use the information Table J.18 and sequence the jobs using the SPT rule. What is the average past due?</strong> A) fewer than or equal to 29 hours B) greater than 29 hours but fewer than or equal to 31 hours C) greater than 31 hours but fewer than or equal to 33 hours D) greater than 33 hours <div style=padding-top: 35px>
Use the information Table J.18 and sequence the jobs using the SPT rule. What is the average past due?

A) fewer than or equal to 29 hours
B) greater than 29 hours but fewer than or equal to 31 hours
C) greater than 31 hours but fewer than or equal to 33 hours
D) greater than 33 hours
سؤال
A(n) ________ specializes in medium- to high-volume production and uses line or continuous flow processes.
سؤال
Table J.11
Work center Q45 has four jobs that just arrived (the start of Day 1) to be processed, as shown in the following table. Assume the shop works eight hours per day.
<strong>Table J.11 Work center Q45 has four jobs that just arrived (the start of Day 1) to be processed, as shown in the following table. Assume the shop works eight hours per day.   Using the information in Table J.11 and the critical ratio rule, what should be the sequence of jobs processed at Q45?</strong> A) A-B-C-D B) D-A-C-B C) D-C-B-A D) B-C-A-D <div style=padding-top: 35px>
Using the information in Table J.11 and the critical ratio rule, what should be the sequence of jobs processed at Q45?

A) A-B-C-D
B) D-A-C-B
C) D-C-B-A
D) B-C-A-D
سؤال
Table J.9
There are three jobs available for processing at Workstation 1. They just arrived at Workstation 1, at the end of Day 0.
<strong>Table J.9 There are three jobs available for processing at Workstation 1. They just arrived at Workstation 1, at the end of Day 0.   Using the information in Table J.9 and the slack per remaining operation (S/RO) rule, what is the average days past due?</strong> A) fewer than or equal to 6.0 days B) greater than 6.0 days but fewer than or equal to 8.0 days C) greater than 8.0 days but fewer than or equal to 9.0 days D) greater than 9.0 days <div style=padding-top: 35px>
Using the information in Table J.9 and the slack per remaining operation (S/RO) rule, what is the average days past due?

A) fewer than or equal to 6.0 days
B) greater than 6.0 days but fewer than or equal to 8.0 days
C) greater than 8.0 days but fewer than or equal to 9.0 days
D) greater than 9.0 days
سؤال
Table J.10
A workstation has six jobs waiting to be processed. They arrived at the end of Day 0 and it is now the beginning of Day 1. It is now time zero. Times are expressed in terms of days.
<strong>Table J.10 A workstation has six jobs waiting to be processed. They arrived at the end of Day 0 and it is now the beginning of Day 1. It is now time zero. Times are expressed in terms of days.   Using the information in Table J.10 and the earliest due date (EDD) rule, which job(s) will be completed on or before their due dates?</strong> A) F only B) A and F only C) B, A, and E only D) E and B only <div style=padding-top: 35px>
Using the information in Table J.10 and the earliest due date (EDD) rule, which job(s) will be completed on or before their due dates?

A) F only
B) A and F only
C) B, A, and E only
D) E and B only
سؤال
________ is a priority sequencing rule that determines priority by dividing the difference between the due date and today's date less the processing time remaining by the number of processing steps left to complete the job.
سؤال
Table J.9
There are three jobs available for processing at Workstation 1. They just arrived at Workstation 1, at the end of Day 0.
<strong>Table J.9 There are three jobs available for processing at Workstation 1. They just arrived at Workstation 1, at the end of Day 0.   Using the information in Table J.9 and the slack per remaining operations (S/RO) rule, what should be the sequence of jobs processed at Workstation 1?</strong> A) A-B-C B) B-C-A C) C-B-A D) B-A-C <div style=padding-top: 35px>
Using the information in Table J.9 and the slack per remaining operations (S/RO) rule, what should be the sequence of jobs processed at Workstation 1?

A) A-B-C
B) B-C-A
C) C-B-A
D) B-A-C
سؤال
Table J.18
<strong>Table J.18   Use the information in Table J.18 and sequence the jobs using the SPT rule. What is the average flow time?</strong> A) fewer than or equal to 52 hours B) greater than 52 hours but fewer than or equal to 54 hours C) greater than 54 hours but fewer than or equal to 56 hours D) greater than 56 hours <div style=padding-top: 35px>
Use the information in Table J.18 and sequence the jobs using the SPT rule. What is the average flow time?

A) fewer than or equal to 52 hours
B) greater than 52 hours but fewer than or equal to 54 hours
C) greater than 54 hours but fewer than or equal to 56 hours
D) greater than 56 hours
سؤال
Table J.11
Work center Q45 has four jobs that just arrived (the start of Day 1) to be processed, as shown in the following table. Assume the shop works eight hours per day.
<strong>Table J.11 Work center Q45 has four jobs that just arrived (the start of Day 1) to be processed, as shown in the following table. Assume the shop works eight hours per day.   Using the information in Table J.11 and the critical ratio rule, what is the flow time of job B?</strong> A) fewer than or equal to 10 hours B) greater than 10 hours but fewer than or equal to 20 hours C) greater than 20 hours but fewer than or equal to 30 hours D) greater than 30 hours <div style=padding-top: 35px>
Using the information in Table J.11 and the critical ratio rule, what is the flow time of job B?

A) fewer than or equal to 10 hours
B) greater than 10 hours but fewer than or equal to 20 hours
C) greater than 20 hours but fewer than or equal to 30 hours
D) greater than 30 hours
سؤال
A(n) ________ specializes in low- to medium-volume production using job or batch processes.
سؤال
Table J.8
Auto Data produces custom engineering testing equipment. The following six jobs are currently in the design department. The time since each one arrived, the processing time, and the due date are shown below. All times are expressed in terms of days. Let now be the beginning of Day 1.
<strong>Table J.8 Auto Data produces custom engineering testing equipment. The following six jobs are currently in the design department. The time since each one arrived, the processing time, and the due date are shown below. All times are expressed in terms of days. Let now be the beginning of Day 1.   Using the information in Table J.8, and either the FCFS, SPT or EDD rule, what is the fewest number of late jobs possible?</strong> A) no late jobs B) one late job C) two late jobs D) three late jobs <div style=padding-top: 35px>
Using the information in Table J.8, and either the FCFS, SPT or EDD rule, what is the fewest number of late jobs possible?

A) no late jobs
B) one late job
C) two late jobs
D) three late jobs
سؤال
Table J.18
<strong>Table J.18   Use the information in the table and sequence the jobs using the EDD rule. What is the average past due?</strong> A) fewer than or equal to 32 hours B) greater than 32 hours but fewer than or equal to 34 hours C) greater than 34 hours but fewer than or equal to 36 hours D) greater than 36 hours <div style=padding-top: 35px>
Use the information in the table and sequence the jobs using the EDD rule. What is the average past due?

A) fewer than or equal to 32 hours
B) greater than 32 hours but fewer than or equal to 34 hours
C) greater than 34 hours but fewer than or equal to 36 hours
D) greater than 36 hours
سؤال
________ specify the job processing sequence when several jobs are waiting in line at a workstation.
سؤال
Table J.11
Work center Q45 has four jobs that just arrived (the start of Day 1) to be processed, as shown in the following table. Assume the shop works eight hours per day.
<strong>Table J.11 Work center Q45 has four jobs that just arrived (the start of Day 1) to be processed, as shown in the following table. Assume the shop works eight hours per day.   Using the information in Table J.11 and the shortest processing time (SPT) rule, what should be the sequence of jobs processed at Q45?</strong> A) C-D-A-B B) D-A-C-B C) A-D-B-C D) B-A-D-C <div style=padding-top: 35px>
Using the information in Table J.11 and the shortest processing time (SPT) rule, what should be the sequence of jobs processed at Q45?

A) C-D-A-B
B) D-A-C-B
C) A-D-B-C
D) B-A-D-C
سؤال
Table J.18
<strong>Table J.18   Use the information in Table J.18 and sequence the jobs using the EDD rule. What is the average flow time?</strong> A) fewer than or equal to 48 hours B) greater than 48 hours but fewer than or equal to 50 hours C) greater than 50 hours but fewer than or equal to 52 hours D) greater than 52 hours <div style=padding-top: 35px>
Use the information in Table J.18 and sequence the jobs using the EDD rule. What is the average flow time?

A) fewer than or equal to 48 hours
B) greater than 48 hours but fewer than or equal to 50 hours
C) greater than 50 hours but fewer than or equal to 52 hours
D) greater than 52 hours
سؤال
Table J.9
There are three jobs available for processing at Workstation 1. They just arrived at Workstation 1, at the end of Day 0.
<strong>Table J.9 There are three jobs available for processing at Workstation 1. They just arrived at Workstation 1, at the end of Day 0.   Using the information in Table J.9 and the critical ratio rule, what is the average flow time?</strong> A) fewer than or equal to 9.0 days B) greater than 9.0 days but fewer than or equal to 10.0 days C) greater than 10.0 days but fewer than or equal to 11.0 days D) greater than 11.0 days <div style=padding-top: 35px>
Using the information in Table J.9 and the critical ratio rule, what is the average flow time?

A) fewer than or equal to 9.0 days
B) greater than 9.0 days but fewer than or equal to 10.0 days
C) greater than 10.0 days but fewer than or equal to 11.0 days
D) greater than 11.0 days
سؤال
Table J.10
A workstation has six jobs waiting to be processed. They arrived at the end of Day 0 and it is now the beginning of Day 1. It is now time zero. Times are expressed in terms of days.
<strong>Table J.10 A workstation has six jobs waiting to be processed. They arrived at the end of Day 0 and it is now the beginning of Day 1. It is now time zero. Times are expressed in terms of days.   Using the information in Table J.10 and the earliest due date (EDD) rule, what is the average flow time?</strong> A) fewer than or equal to 20 days B) greater than 20 days but fewer than or equal to 22 days C) greater than 22 days but fewer than or equal to 24 days D) greater than 24 days <div style=padding-top: 35px>
Using the information in Table J.10 and the earliest due date (EDD) rule, what is the average flow time?

A) fewer than or equal to 20 days
B) greater than 20 days but fewer than or equal to 22 days
C) greater than 22 days but fewer than or equal to 24 days
D) greater than 24 days
سؤال
Table J.11
Work center Q45 has four jobs that just arrived (the start of Day 1) to be processed, as shown in the following table. Assume the shop works eight hours per day.
<strong>Table J.11 Work center Q45 has four jobs that just arrived (the start of Day 1) to be processed, as shown in the following table. Assume the shop works eight hours per day.   Using the information in Table J.11 and the slack per remaining operations (S/RO) rule, what should be the sequence of jobs processed at Q45?</strong> A) D-C-A-B B) A-B-C-D C) D-A-C-B D) B-C-A-D <div style=padding-top: 35px>
Using the information in Table J.11 and the slack per remaining operations (S/RO) rule, what should be the sequence of jobs processed at Q45?

A) D-C-A-B
B) A-B-C-D
C) D-A-C-B
D) B-C-A-D
سؤال
Table J.9
There are three jobs available for processing at Workstation 1. They just arrived at Workstation 1, at the end of Day 0.
<strong>Table J.9 There are three jobs available for processing at Workstation 1. They just arrived at Workstation 1, at the end of Day 0.   Using the information in Table J.9 and the critical ratio rule, what should be the sequence of jobs processed at Workstation 1?</strong> A) C-B-A B) B-A-C C) A-B-C D) B-C-A <div style=padding-top: 35px>
Using the information in Table J.9 and the critical ratio rule, what should be the sequence of jobs processed at Workstation 1?

A) C-B-A
B) B-A-C
C) A-B-C
D) B-C-A
سؤال
Table J.11
Work center Q45 has four jobs that just arrived (the start of Day 1) to be processed, as shown in the following table. Assume the shop works eight hours per day.
<strong>Table J.11 Work center Q45 has four jobs that just arrived (the start of Day 1) to be processed, as shown in the following table. Assume the shop works eight hours per day.   Using the information in Table J.11 and the slack per remaining operations ratio (S/RO) rule, what is the average past due?</strong> A) fewer than or equal to 10 hours B) greater than 10 hours but fewer than or equal to 20 hours C) greater than 20 hours but fewer than or equal to 30 hours D) greater than 30 hours <div style=padding-top: 35px>
Using the information in Table J.11 and the slack per remaining operations ratio (S/RO) rule, what is the average past due?

A) fewer than or equal to 10 hours
B) greater than 10 hours but fewer than or equal to 20 hours
C) greater than 20 hours but fewer than or equal to 30 hours
D) greater than 30 hours
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/123
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 17: Supplement J Operations Scheduling
1
Why is flow time an important measure of performance?
Minimizing job flow times in a schedule tends to minimize work-in-process inventory and maximize utilization. In addition, flow times are related to the lead times (or cycle times) of products and have an influence on customer service.
2
Makespan is the time of completion of a group of jobs, plus the starting time of the first job.
False
3
Which of the following statements on an operations schedule is best?

A) It determines when employees work.
B) It assigns employees to tasks depending on availability.
C) It assigns customers to a definite time for order fulfillment.
D) It assigns jobs to workstations or employees to jobs for specified time periods.
D
4
Operations scheduling involves assigning jobs to workstations or employees to jobs for specific time periods.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 123 في هذه المجموعة.
فتح الحزمة
k this deck
5
________ is the total amount of time required to complete a group of jobs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 123 في هذه المجموعة.
فتح الحزمة
k this deck
6
________ is the degree to which equipment, space, or the workforce is currently being used.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 123 في هذه المجموعة.
فتح الحزمة
k this deck
7
________ scheduling assigns jobs to machines or employees to jobs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 123 في هذه المجموعة.
فتح الحزمة
k this deck
8
In the context of operations scheduling, total inventory is equal to:

A) scheduled receipts plus on-hand inventories.
B) received orders minus scheduled receipts.
C) on-hand inventories plus received orders.
D) None of these is equal to total inventory.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 123 في هذه المجموعة.
فتح الحزمة
k this deck
9
Describe the difference between front office and back office operations from the standpoint of scheduling customer jobs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 123 في هذه المجموعة.
فتح الحزمة
k this deck
10
Operations scheduling applies only to manufacturing, because services do not allow inventories.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 123 في هذه المجموعة.
فتح الحزمة
k this deck
11
The sum of scheduled receipts for all items and the on-hand inventories for all items is ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 123 في هذه المجموعة.
فتح الحزمة
k this deck
12
The percent of work time productively spent by an employee or a machine is called:

A) activation.
B) efficiency.
C) effectiveness.
D) utilization.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 123 في هذه المجموعة.
فتح الحزمة
k this deck
13
An appropriate objective for a manufacturing firm is to maximize total inventory.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 123 في هذه المجموعة.
فتح الحزمة
k this deck
14
A job's flow time at a single workstation is defined as the:

A) completion time of the job plus the time since it arrived at the workstation.
B) processing time to complete the job.
C) time of completion of the last job of a group minus the starting time of the first job.
D) amount of time by which a group of jobs missed their due dates.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 123 في هذه المجموعة.
فتح الحزمة
k this deck
15
In the context of operations scheduling, total inventory is the sum of the scheduled receipts for all items and the on-hand inventories for all items.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 123 في هذه المجموعة.
فتح الحزمة
k this deck
16
A(n) ________ is the object receiving service or being manufactured.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 123 في هذه المجموعة.
فتح الحزمة
k this deck
17
________ is the time a job spends in the service or manufacturing system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 123 في هذه المجموعة.
فتح الحزمة
k this deck
18
Utilization is the degree to which equipment, space, or the workforce is currently being used, measured as the ratio of average output rate to the maximum capacity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 123 في هذه المجموعة.
فتح الحزمة
k this deck
19
________ is the amount of time by which a job missed its due date.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 123 في هذه المجموعة.
فتح الحزمة
k this deck
20
Makespan is the total amount of time to complete a single job or the first job in a group of jobs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 123 في هذه المجموعة.
فتح الحزمة
k this deck
21
When using the critical ratio (CR) priority sequencing rule:

A) a ratio of less than 1.0 implies that the job is ahead of schedule.
B) a ratio of less than 1.0 implies the job is behind schedule.
C) the job with the earliest due date is scheduled next.
D) the job with the highest CR is scheduled next.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 123 في هذه المجموعة.
فتح الحزمة
k this deck
22
Table J.1
The framing department has six jobs waiting to be processed. It is now time zero. Times are expressed in terms of days.
<strong>Table J.1 The framing department has six jobs waiting to be processed. It is now time zero. Times are expressed in terms of days.   Using the information in Table J.1 and the EDD rule, what is the average early time?</strong> A) 0 days B) greater than 0 but less than 1.5 days C) greater than 2.5 but less than 2.5 days D) greater than 2.5 days
Using the information in Table J.1 and the EDD rule, what is the average early time?

A) 0 days
B) greater than 0 but less than 1.5 days
C) greater than 2.5 but less than 2.5 days
D) greater than 2.5 days
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 123 في هذه المجموعة.
فتح الحزمة
k this deck
23
The fact that job shops routinely accept new orders at any time makes the scheduling environment dynamic.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 123 في هذه المجموعة.
فتح الحزمة
k this deck
24
Which one of the following rules tends to perform well with respect to percentage of jobs past due and variance of hours past due, but performs relatively poorly with respect to average flow time?

A) earliest due date
B) shortest processing time
C) first-come, first-served
D) longest processing time
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 123 في هذه المجموعة.
فتح الحزمة
k this deck
25
Table J.1
The framing department has six jobs waiting to be processed. It is now time zero. Times are expressed in terms of days.
<strong>Table J.1 The framing department has six jobs waiting to be processed. It is now time zero. Times are expressed in terms of days.   Using the information in Table J.1 and the EDD rule, what is the average flow time?</strong> A) fewer than or equal to 25 days B) greater than 25 days but fewer than or equal to 27 days C) greater than 27 days but fewer than or equal to 29 days D) greater than 29 days
Using the information in Table J.1 and the EDD rule, what is the average flow time?

A) fewer than or equal to 25 days
B) greater than 25 days but fewer than or equal to 27 days
C) greater than 27 days but fewer than or equal to 29 days
D) greater than 29 days
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 123 في هذه المجموعة.
فتح الحزمة
k this deck
26
A manufacturer's flow shop utilizes line or continuous flow processes.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 123 في هذه المجموعة.
فتح الحزمة
k this deck
27
A job shop is accompanied by divergent flows and low-to-medium volume output rates.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 123 في هذه المجموعة.
فتح الحزمة
k this deck
28
Table J.1
The framing department has six jobs waiting to be processed. It is now time zero. Times are expressed in terms of days.
<strong>Table J.1 The framing department has six jobs waiting to be processed. It is now time zero. Times are expressed in terms of days.   Using the information in Table J.1 and the SPT rule, what is the average flow time?</strong> A) fewer than or equal to 19 days B) greater than 19 days but fewer than or equal to 21 days C) greater than 21 days but fewer than or equal to 23 days D) greater than 23 days
Using the information in Table J.1 and the SPT rule, what is the average flow time?

A) fewer than or equal to 19 days
B) greater than 19 days but fewer than or equal to 21 days
C) greater than 21 days but fewer than or equal to 23 days
D) greater than 23 days
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 123 في هذه المجموعة.
فتح الحزمة
k this deck
29
Table J.2
Stu Dent reviews the syllabi he received on the first day of class and pulls out his planner. He has seven major assignments that must be completed before the end of the semester.
<strong>Table J.2 Stu Dent reviews the syllabi he received on the first day of class and pulls out his planner. He has seven major assignments that must be completed before the end of the semester.   What is the average flow time for all assignments scheduled in an SPT sequence?</strong> A) 28.65 B) 32.14 C) 35.92 D) 36.88
What is the average flow time for all assignments scheduled in an SPT sequence?

A) 28.65
B) 32.14
C) 35.92
D) 36.88
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 123 في هذه المجموعة.
فتح الحزمة
k this deck
30
Slack is the difference between the time remaining until a job's due date and the total shop time remaining, excluding that of the operation being scheduled.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 123 في هذه المجموعة.
فتح الحزمة
k this deck
31
When choosing a priority sequencing rule:

A) select multiple-dimension rules because they dominate single-dimension rules for all performance measures.
B) always select the rule that minimizes the amount of past-due jobs.
C) test a variety of rules before making a decision.
D) select CR or S/RO because they use more information.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 123 في هذه المجموعة.
فتح الحزمة
k this deck
32
Critical ratio (CR) is a single-dimension priority rule.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 123 في هذه المجموعة.
فتح الحزمة
k this deck
33
Sequencing jobs does not affect tardiness, because processing times are unchanged with different sequences.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 123 في هذه المجموعة.
فتح الحزمة
k this deck
34
The earliest due date (EDD) rule gives the job with the shortest processing time the highest priority.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 123 في هذه المجموعة.
فتح الحزمة
k this deck
35
A first-come, first-served schedule minimizes the average flow time for all jobs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 123 في هذه المجموعة.
فتح الحزمة
k this deck
36
Table J.2
Stu Dent reviews the syllabi he received on the first day of class and pulls out his planner. He has seven major assignments that must be completed before the end of the semester.
<strong>Table J.2 Stu Dent reviews the syllabi he received on the first day of class and pulls out his planner. He has seven major assignments that must be completed before the end of the semester.   Develop an SPT sequence and calculate the average number of assignments Stu has this semester.</strong> A) 3.36 B) 3.52 C) 3.78 D) 3.94
Develop an SPT sequence and calculate the average number of assignments Stu has this semester.

A) 3.36
B) 3.52
C) 3.78
D) 3.94
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 123 في هذه المجموعة.
فتح الحزمة
k this deck
37
Determining a production sequence for a group of jobs in a two-station flow shop to minimize the makespan has the advantage of:

A) maximizing the utilization of the shop.
B) minimizing the percentage of jobs past due.
C) minimizing the flow time of jobs on the first machine.
D) minimizing the variance of past-due hours.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 123 في هذه المجموعة.
فتح الحزمة
k this deck
38
Table J.1
The framing department has six jobs waiting to be processed. It is now time zero. Times are expressed in terms of days.
<strong>Table J.1 The framing department has six jobs waiting to be processed. It is now time zero. Times are expressed in terms of days.   Using the information in Table J.1 and the FCFS rule, what is the average flow time?</strong> A) fewer than or equal to 19 days B) greater than 19 days but fewer than or equal to 21 days C) greater than 21 days but fewer than or equal to 23 days D) greater than 23 days
Using the information in Table J.1 and the FCFS rule, what is the average flow time?

A) fewer than or equal to 19 days
B) greater than 19 days but fewer than or equal to 21 days
C) greater than 21 days but fewer than or equal to 23 days
D) greater than 23 days
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 123 في هذه المجموعة.
فتح الحزمة
k this deck
39
Table J.1
The framing department has six jobs waiting to be processed. It is now time zero. Times are expressed in terms of days.
<strong>Table J.1 The framing department has six jobs waiting to be processed. It is now time zero. Times are expressed in terms of days.   Using the information in Table J.1 and the SPT rule, what is the average past due?</strong> A) 0 days B) greater than 0 days but fewer than or equal to 5 days C) greater than 5 days but fewer than or equal to 10 days D) greater than 10 days
Using the information in Table J.1 and the SPT rule, what is the average past due?

A) 0 days
B) greater than 0 days but fewer than or equal to 5 days
C) greater than 5 days but fewer than or equal to 10 days
D) greater than 10 days
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 123 في هذه المجموعة.
فتح الحزمة
k this deck
40
Table J.1
The framing department has six jobs waiting to be processed. It is now time zero. Times are expressed in terms of days.
<strong>Table J.1 The framing department has six jobs waiting to be processed. It is now time zero. Times are expressed in terms of days.   Using the information in Table J.1 and the FCFS rule, what is the average past due?</strong> A) 0 days B) greater than 0 days but fewer than or equal to 5.5 days C) greater than 5.5 days but fewer than or equal to 10 days D) greater than 10 days
Using the information in Table J.1 and the FCFS rule, what is the average past due?

A) 0 days
B) greater than 0 days but fewer than or equal to 5.5 days
C) greater than 5.5 days but fewer than or equal to 10 days
D) greater than 10 days
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 123 في هذه المجموعة.
فتح الحزمة
k this deck
41
Table J.7
The following four jobs just arrived (end of hour 0) at Workstation A. They are the only ones waiting to be processed.
<strong>Table J.7 The following four jobs just arrived (end of hour 0) at Workstation A. They are the only ones waiting to be processed.   Using the information in Table J.7 and the S/RO rule, what is the average flow time at Workstation A?</strong> A) fewer than or equal to 14.0 hours B) greater than 14.0 but fewer than or equal to 14.5 hours C) greater than 14.5 but fewer than or equal to 15.0 hours D) greater than 15.0 hours
Using the information in Table J.7 and the S/RO rule, what is the average flow time at Workstation A?

A) fewer than or equal to 14.0 hours
B) greater than 14.0 but fewer than or equal to 14.5 hours
C) greater than 14.5 but fewer than or equal to 15.0 hours
D) greater than 15.0 hours
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 123 في هذه المجموعة.
فتح الحزمة
k this deck
42
Table J.5
The following three jobs just arrived (end of hour 0) at Workstation A. They are the only ones waiting to be processed.
<strong>Table J.5 The following three jobs just arrived (end of hour 0) at Workstation A. They are the only ones waiting to be processed.   Use the information in Table J.5. The sequence of jobs using the slack per remaining operations (S/RO) rule, is:</strong> A) 1-3-2 B) 3-2-1 C) 1-2-3 D) 2-3-1
Use the information in Table J.5. The sequence of jobs using the slack per remaining operations (S/RO) rule, is:

A) 1-3-2
B) 3-2-1
C) 1-2-3
D) 2-3-1
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 123 في هذه المجموعة.
فتح الحزمة
k this deck
43
Table J.2
Stu Dent reviews the syllabi he received on the first day of class and pulls out his planner. He has seven major assignments that must be completed before the end of the semester.
<strong>Table J.2 Stu Dent reviews the syllabi he received on the first day of class and pulls out his planner. He has seven major assignments that must be completed before the end of the semester.   What is the average flow time for all seven assignments if Stu schedules them using the critical ration criterion?</strong> A) 38.17 B) 37.43 C) 36.67 D) 38.26
What is the average flow time for all seven assignments if Stu schedules them using the critical ration criterion?

A) 38.17
B) 37.43
C) 36.67
D) 38.26
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 123 في هذه المجموعة.
فتح الحزمة
k this deck
44
Table J.2
Stu Dent reviews the syllabi he received on the first day of class and pulls out his planner. He has seven major assignments that must be completed before the end of the semester.
<strong>Table J.2 Stu Dent reviews the syllabi he received on the first day of class and pulls out his planner. He has seven major assignments that must be completed before the end of the semester.   Stu decides to adopt an EDD sequence for the assignments, which seems like a very logical approach. Which assignments will he be submitting late?</strong> A) C, D and F B) B, C and F C) B, E and G D) F, E and G
Stu decides to adopt an EDD sequence for the assignments, which seems like a very logical approach. Which assignments will he be submitting late?

A) C, D and F
B) B, C and F
C) B, E and G
D) F, E and G
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 123 في هذه المجموعة.
فتح الحزمة
k this deck
45
Table J.2
Stu Dent reviews the syllabi he received on the first day of class and pulls out his planner. He has seven major assignments that must be completed before the end of the semester.
<strong>Table J.2 Stu Dent reviews the syllabi he received on the first day of class and pulls out his planner. He has seven major assignments that must be completed before the end of the semester.   Stu schedules his assignments using the critical ratio criterion. How many assignments are late?</strong> A) 3 B) 4 C) 5 D) 6
Stu schedules his assignments using the critical ratio criterion. How many assignments are late?

A) 3
B) 4
C) 5
D) 6
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 123 في هذه المجموعة.
فتح الحزمة
k this deck
46
Table J.2
Stu Dent reviews the syllabi he received on the first day of class and pulls out his planner. He has seven major assignments that must be completed before the end of the semester.
<strong>Table J.2 Stu Dent reviews the syllabi he received on the first day of class and pulls out his planner. He has seven major assignments that must be completed before the end of the semester.   Stu decides to adopt an SPT sequence for the assignments, which at face value seems like an odd choice. Which assignments will he be submitting late?</strong> A) C, D and F B) B, C and F C) B, E and G D) F, E and G
Stu decides to adopt an SPT sequence for the assignments, which at face value seems like an odd choice. Which assignments will he be submitting late?

A) C, D and F
B) B, C and F
C) B, E and G
D) F, E and G
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 123 في هذه المجموعة.
فتح الحزمة
k this deck
47
Table J.6
All of the following three jobs just arrived (end of hour 0) at Workstation A. They are the only ones waiting to be processed.
<strong>Table J.6 All of the following three jobs just arrived (end of hour 0) at Workstation A. They are the only ones waiting to be processed.   Use the information in Table J.6. What is the average flow time at Workstation A for the critical ratio rule?</strong> A) fewer than or equal to 8 hours B) greater than 8 hours but fewer than or equal to 9 hours C) greater than 9 hours but fewer than or equal to 10 hours D) greater than 10 hours
Use the information in Table J.6. What is the average flow time at Workstation A for the critical ratio rule?

A) fewer than or equal to 8 hours
B) greater than 8 hours but fewer than or equal to 9 hours
C) greater than 9 hours but fewer than or equal to 10 hours
D) greater than 10 hours
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 123 في هذه المجموعة.
فتح الحزمة
k this deck
48
Table J.5
The following three jobs just arrived (end of hour 0) at Workstation A. They are the only ones waiting to be processed.
<strong>Table J.5 The following three jobs just arrived (end of hour 0) at Workstation A. They are the only ones waiting to be processed.   Use the information in Table J.5. The average past due using the slack per remaining operations (S/RO) rule is:</strong> A) fewer than or equal to 9.0. B) greater than 9.0 but fewer than or equal to 18.0. C) greater than 18.0 but fewer than or equal to 27.0. D) greater than 27.0.
Use the information in Table J.5. The average past due using the slack per remaining operations (S/RO) rule is:

A) fewer than or equal to 9.0.
B) greater than 9.0 but fewer than or equal to 18.0.
C) greater than 18.0 but fewer than or equal to 27.0.
D) greater than 27.0.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 123 في هذه المجموعة.
فتح الحزمة
k this deck
49
Table J.7
The following four jobs just arrived (end of hour 0) at Workstation A. They are the only ones waiting to be processed.
<strong>Table J.7 The following four jobs just arrived (end of hour 0) at Workstation A. They are the only ones waiting to be processed.   Using the information in Table J.7 and the critical ratio (CR) rule, what is the job sequence?</strong> A) C-D-B-A B) D-C-B-A C) A-C-D-B D) D-B-A-C
Using the information in Table J.7 and the critical ratio (CR) rule, what is the job sequence?

A) C-D-B-A
B) D-C-B-A
C) A-C-D-B
D) D-B-A-C
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 123 في هذه المجموعة.
فتح الحزمة
k this deck
50
Table J.7
The following four jobs just arrived (end of hour 0) at Workstation A. They are the only ones waiting to be processed.
<strong>Table J.7 The following four jobs just arrived (end of hour 0) at Workstation A. They are the only ones waiting to be processed.   Using the information in Table J.7 and the CR rule, what is the average flow time at workstation A?</strong> A) fewer than or equal to 14.0 hours B) greater than 14.0 but fewer than or equal to 14.5 hours C) greater than 14.5 but fewer than or equal to 15.0 hours D) greater than 15.0 hours
Using the information in Table J.7 and the CR rule, what is the average flow time at workstation A?

A) fewer than or equal to 14.0 hours
B) greater than 14.0 but fewer than or equal to 14.5 hours
C) greater than 14.5 but fewer than or equal to 15.0 hours
D) greater than 15.0 hours
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 123 في هذه المجموعة.
فتح الحزمة
k this deck
51
Table J.5
The following three jobs just arrived (end of hour 0) at Workstation A. They are the only ones waiting to be processed.
<strong>Table J.5 The following three jobs just arrived (end of hour 0) at Workstation A. They are the only ones waiting to be processed.   Use the information in Table J.5. The operations sequence of jobs, using the critical ratio (CR) rule, is</strong> A) 3-1-2 B) 3-2-1 C) 1-2-3 D) 2-3-1
Use the information in Table J.5. The operations sequence of jobs, using the critical ratio (CR) rule, is

A) 3-1-2
B) 3-2-1
C) 1-2-3
D) 2-3-1
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 123 في هذه المجموعة.
فتح الحزمة
k this deck
52
Table J.8
Auto Data produces custom engineering testing equipment. The following six jobs are currently in the design department. The time since each one arrived, the processing time, and the due date are shown below. All times are expressed in terms of days. Let now be the beginning of Day 1.
<strong>Table J.8 Auto Data produces custom engineering testing equipment. The following six jobs are currently in the design department. The time since each one arrived, the processing time, and the due date are shown below. All times are expressed in terms of days. Let now be the beginning of Day 1.   Using the information in Table J.8 and the FCFS rule, what is the average days past due?</strong> A) fewer than or equal to 5.0 days B) greater than 5.0 days but fewer than or equal to 8.0 days C) greater than 8.0 days but fewer than or equal to 9.0 days D) greater than 9.0 days
Using the information in Table J.8 and the FCFS rule, what is the average days past due?

A) fewer than or equal to 5.0 days
B) greater than 5.0 days but fewer than or equal to 8.0 days
C) greater than 8.0 days but fewer than or equal to 9.0 days
D) greater than 9.0 days
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 123 في هذه المجموعة.
فتح الحزمة
k this deck
53
Table J.7
The following four jobs just arrived (end of hour 0) at Workstation A. They are the only ones waiting to be processed.
<strong>Table J.7 The following four jobs just arrived (end of hour 0) at Workstation A. They are the only ones waiting to be processed.   Using the information in Table J.7 and the slack per remaining operations (S/RO) rule, what is the job sequence?</strong> A) A-B-C-D B) A-C-D-B C) C-D-B-A D) D-C-B-A
Using the information in Table J.7 and the slack per remaining operations (S/RO) rule, what is the job sequence?

A) A-B-C-D
B) A-C-D-B
C) C-D-B-A
D) D-C-B-A
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 123 في هذه المجموعة.
فتح الحزمة
k this deck
54
Table J.5
The following three jobs just arrived (end of hour 0) at Workstation A. They are the only ones waiting to be processed.
<strong>Table J.5 The following three jobs just arrived (end of hour 0) at Workstation A. They are the only ones waiting to be processed.   Use the information in Table J.5. The average past due using the ratio (CR) rule, is:</strong> A) fewer than or equal to 9.0. B) greater than 9.0 but fewer than or equal to 18.0. C) greater than 18.0 but fewer than or equal to 27.0. D) greater than 27.0.
Use the information in Table J.5. The average past due using the ratio (CR) rule, is:

A) fewer than or equal to 9.0.
B) greater than 9.0 but fewer than or equal to 18.0.
C) greater than 18.0 but fewer than or equal to 27.0.
D) greater than 27.0.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 123 في هذه المجموعة.
فتح الحزمة
k this deck
55
Table J.6
All of the following three jobs just arrived (end of hour 0) at Workstation A. They are the only ones waiting to be processed.
<strong>Table J.6 All of the following three jobs just arrived (end of hour 0) at Workstation A. They are the only ones waiting to be processed.   Use the information in Table J.6. What is the job sequence at Workstation A, using the critical ratio rule?</strong> A) 3-2-1 B) 1-2-3 C) 1-3-2 D) 2-1-3
Use the information in Table J.6. What is the job sequence at Workstation A, using the critical ratio rule?

A) 3-2-1
B) 1-2-3
C) 1-3-2
D) 2-1-3
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 123 في هذه المجموعة.
فتح الحزمة
k this deck
56
Table J.2
Stu Dent reviews the syllabi he received on the first day of class and pulls out his planner. He has seven major assignments that must be completed before the end of the semester.
<strong>Table J.2 Stu Dent reviews the syllabi he received on the first day of class and pulls out his planner. He has seven major assignments that must be completed before the end of the semester.   Stu applies the critical ratio method to scheduling his assignments. Which assignment is the fourth one in his sequence?</strong> A) E B) G C) C D) D
Stu applies the critical ratio method to scheduling his assignments. Which assignment is the fourth one in his sequence?

A) E
B) G
C) C
D) D
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 123 في هذه المجموعة.
فتح الحزمة
k this deck
57
Table J.2
Stu Dent reviews the syllabi he received on the first day of class and pulls out his planner. He has seven major assignments that must be completed before the end of the semester.
<strong>Table J.2 Stu Dent reviews the syllabi he received on the first day of class and pulls out his planner. He has seven major assignments that must be completed before the end of the semester.   Stu whips up a schedule based on the critical ratio criterion. What is the average number of assignments in the system?</strong> A) 3.91 B) 3.71 C) 3.53 D) 3.14
Stu whips up a schedule based on the critical ratio criterion. What is the average number of assignments in the system?

A) 3.91
B) 3.71
C) 3.53
D) 3.14
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 123 في هذه المجموعة.
فتح الحزمة
k this deck
58
Table J.8
Auto Data produces custom engineering testing equipment. The following six jobs are currently in the design department. The time since each one arrived, the processing time, and the due date are shown below. All times are expressed in terms of days. Let now be the beginning of Day 1.
<strong>Table J.8 Auto Data produces custom engineering testing equipment. The following six jobs are currently in the design department. The time since each one arrived, the processing time, and the due date are shown below. All times are expressed in terms of days. Let now be the beginning of Day 1.   Using the information in Table J.8 and the SPT rule, what is the average days past due?</strong> A) fewer than or equal to 6.0 days B) greater than 6.0 days but fewer than or equal to 7.0 days C) greater than 7.0 days but fewer than or equal to 8.0 days D) greater than 8.0 days
Using the information in Table J.8 and the SPT rule, what is the average days past due?

A) fewer than or equal to 6.0 days
B) greater than 6.0 days but fewer than or equal to 7.0 days
C) greater than 7.0 days but fewer than or equal to 8.0 days
D) greater than 8.0 days
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 123 في هذه المجموعة.
فتح الحزمة
k this deck
59
Table J.8
Auto Data produces custom engineering testing equipment. The following six jobs are currently in the design department. The time since each one arrived, the processing time, and the due date are shown below. All times are expressed in terms of days. Let now be the beginning of Day 1.
<strong>Table J.8 Auto Data produces custom engineering testing equipment. The following six jobs are currently in the design department. The time since each one arrived, the processing time, and the due date are shown below. All times are expressed in terms of days. Let now be the beginning of Day 1.   Using the information in Table J.8 and the EDD rule, what is the average days past due?</strong> A) fewer than or equal to 8.0 days B) greater than 8.0 days but fewer than or equal to 9.5 days C) greater than 9.5 but fewer than or equal to 11.0 days D) greater than 11.0 days
Using the information in Table J.8 and the EDD rule, what is the average days past due?

A) fewer than or equal to 8.0 days
B) greater than 8.0 days but fewer than or equal to 9.5 days
C) greater than 9.5 but fewer than or equal to 11.0 days
D) greater than 11.0 days
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 123 في هذه المجموعة.
فتح الحزمة
k this deck
60
Table J.6
All of the following three jobs just arrived (end of hour 0) at Workstation A. They are the only ones waiting to be processed.
<strong>Table J.6 All of the following three jobs just arrived (end of hour 0) at Workstation A. They are the only ones waiting to be processed.   Use the information in Table J.6. What is the average past due time at Workstation A for the critical ratio rule?</strong> A) 0 hours B) greater than 0 hours but fewer than or equal to 5 hours C) greater than 5 hours but fewer than or equal to 10 hours D) greater than 10 hours
Use the information in Table J.6. What is the average past due time at Workstation A for the critical ratio rule?

A) 0 hours
B) greater than 0 hours but fewer than or equal to 5 hours
C) greater than 5 hours but fewer than or equal to 10 hours
D) greater than 10 hours
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 123 في هذه المجموعة.
فتح الحزمة
k this deck
61
Table J.18
<strong>Table J.18   Use the information Table J.18 and sequence the jobs using the SPT rule. What is the average past due?</strong> A) fewer than or equal to 29 hours B) greater than 29 hours but fewer than or equal to 31 hours C) greater than 31 hours but fewer than or equal to 33 hours D) greater than 33 hours
Use the information Table J.18 and sequence the jobs using the SPT rule. What is the average past due?

A) fewer than or equal to 29 hours
B) greater than 29 hours but fewer than or equal to 31 hours
C) greater than 31 hours but fewer than or equal to 33 hours
D) greater than 33 hours
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 123 في هذه المجموعة.
فتح الحزمة
k this deck
62
A(n) ________ specializes in medium- to high-volume production and uses line or continuous flow processes.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 123 في هذه المجموعة.
فتح الحزمة
k this deck
63
Table J.11
Work center Q45 has four jobs that just arrived (the start of Day 1) to be processed, as shown in the following table. Assume the shop works eight hours per day.
<strong>Table J.11 Work center Q45 has four jobs that just arrived (the start of Day 1) to be processed, as shown in the following table. Assume the shop works eight hours per day.   Using the information in Table J.11 and the critical ratio rule, what should be the sequence of jobs processed at Q45?</strong> A) A-B-C-D B) D-A-C-B C) D-C-B-A D) B-C-A-D
Using the information in Table J.11 and the critical ratio rule, what should be the sequence of jobs processed at Q45?

A) A-B-C-D
B) D-A-C-B
C) D-C-B-A
D) B-C-A-D
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 123 في هذه المجموعة.
فتح الحزمة
k this deck
64
Table J.9
There are three jobs available for processing at Workstation 1. They just arrived at Workstation 1, at the end of Day 0.
<strong>Table J.9 There are three jobs available for processing at Workstation 1. They just arrived at Workstation 1, at the end of Day 0.   Using the information in Table J.9 and the slack per remaining operation (S/RO) rule, what is the average days past due?</strong> A) fewer than or equal to 6.0 days B) greater than 6.0 days but fewer than or equal to 8.0 days C) greater than 8.0 days but fewer than or equal to 9.0 days D) greater than 9.0 days
Using the information in Table J.9 and the slack per remaining operation (S/RO) rule, what is the average days past due?

A) fewer than or equal to 6.0 days
B) greater than 6.0 days but fewer than or equal to 8.0 days
C) greater than 8.0 days but fewer than or equal to 9.0 days
D) greater than 9.0 days
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 123 في هذه المجموعة.
فتح الحزمة
k this deck
65
Table J.10
A workstation has six jobs waiting to be processed. They arrived at the end of Day 0 and it is now the beginning of Day 1. It is now time zero. Times are expressed in terms of days.
<strong>Table J.10 A workstation has six jobs waiting to be processed. They arrived at the end of Day 0 and it is now the beginning of Day 1. It is now time zero. Times are expressed in terms of days.   Using the information in Table J.10 and the earliest due date (EDD) rule, which job(s) will be completed on or before their due dates?</strong> A) F only B) A and F only C) B, A, and E only D) E and B only
Using the information in Table J.10 and the earliest due date (EDD) rule, which job(s) will be completed on or before their due dates?

A) F only
B) A and F only
C) B, A, and E only
D) E and B only
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 123 في هذه المجموعة.
فتح الحزمة
k this deck
66
________ is a priority sequencing rule that determines priority by dividing the difference between the due date and today's date less the processing time remaining by the number of processing steps left to complete the job.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 123 في هذه المجموعة.
فتح الحزمة
k this deck
67
Table J.9
There are three jobs available for processing at Workstation 1. They just arrived at Workstation 1, at the end of Day 0.
<strong>Table J.9 There are three jobs available for processing at Workstation 1. They just arrived at Workstation 1, at the end of Day 0.   Using the information in Table J.9 and the slack per remaining operations (S/RO) rule, what should be the sequence of jobs processed at Workstation 1?</strong> A) A-B-C B) B-C-A C) C-B-A D) B-A-C
Using the information in Table J.9 and the slack per remaining operations (S/RO) rule, what should be the sequence of jobs processed at Workstation 1?

A) A-B-C
B) B-C-A
C) C-B-A
D) B-A-C
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 123 في هذه المجموعة.
فتح الحزمة
k this deck
68
Table J.18
<strong>Table J.18   Use the information in Table J.18 and sequence the jobs using the SPT rule. What is the average flow time?</strong> A) fewer than or equal to 52 hours B) greater than 52 hours but fewer than or equal to 54 hours C) greater than 54 hours but fewer than or equal to 56 hours D) greater than 56 hours
Use the information in Table J.18 and sequence the jobs using the SPT rule. What is the average flow time?

A) fewer than or equal to 52 hours
B) greater than 52 hours but fewer than or equal to 54 hours
C) greater than 54 hours but fewer than or equal to 56 hours
D) greater than 56 hours
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 123 في هذه المجموعة.
فتح الحزمة
k this deck
69
Table J.11
Work center Q45 has four jobs that just arrived (the start of Day 1) to be processed, as shown in the following table. Assume the shop works eight hours per day.
<strong>Table J.11 Work center Q45 has four jobs that just arrived (the start of Day 1) to be processed, as shown in the following table. Assume the shop works eight hours per day.   Using the information in Table J.11 and the critical ratio rule, what is the flow time of job B?</strong> A) fewer than or equal to 10 hours B) greater than 10 hours but fewer than or equal to 20 hours C) greater than 20 hours but fewer than or equal to 30 hours D) greater than 30 hours
Using the information in Table J.11 and the critical ratio rule, what is the flow time of job B?

A) fewer than or equal to 10 hours
B) greater than 10 hours but fewer than or equal to 20 hours
C) greater than 20 hours but fewer than or equal to 30 hours
D) greater than 30 hours
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 123 في هذه المجموعة.
فتح الحزمة
k this deck
70
A(n) ________ specializes in low- to medium-volume production using job or batch processes.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 123 في هذه المجموعة.
فتح الحزمة
k this deck
71
Table J.8
Auto Data produces custom engineering testing equipment. The following six jobs are currently in the design department. The time since each one arrived, the processing time, and the due date are shown below. All times are expressed in terms of days. Let now be the beginning of Day 1.
<strong>Table J.8 Auto Data produces custom engineering testing equipment. The following six jobs are currently in the design department. The time since each one arrived, the processing time, and the due date are shown below. All times are expressed in terms of days. Let now be the beginning of Day 1.   Using the information in Table J.8, and either the FCFS, SPT or EDD rule, what is the fewest number of late jobs possible?</strong> A) no late jobs B) one late job C) two late jobs D) three late jobs
Using the information in Table J.8, and either the FCFS, SPT or EDD rule, what is the fewest number of late jobs possible?

A) no late jobs
B) one late job
C) two late jobs
D) three late jobs
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 123 في هذه المجموعة.
فتح الحزمة
k this deck
72
Table J.18
<strong>Table J.18   Use the information in the table and sequence the jobs using the EDD rule. What is the average past due?</strong> A) fewer than or equal to 32 hours B) greater than 32 hours but fewer than or equal to 34 hours C) greater than 34 hours but fewer than or equal to 36 hours D) greater than 36 hours
Use the information in the table and sequence the jobs using the EDD rule. What is the average past due?

A) fewer than or equal to 32 hours
B) greater than 32 hours but fewer than or equal to 34 hours
C) greater than 34 hours but fewer than or equal to 36 hours
D) greater than 36 hours
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 123 في هذه المجموعة.
فتح الحزمة
k this deck
73
________ specify the job processing sequence when several jobs are waiting in line at a workstation.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 123 في هذه المجموعة.
فتح الحزمة
k this deck
74
Table J.11
Work center Q45 has four jobs that just arrived (the start of Day 1) to be processed, as shown in the following table. Assume the shop works eight hours per day.
<strong>Table J.11 Work center Q45 has four jobs that just arrived (the start of Day 1) to be processed, as shown in the following table. Assume the shop works eight hours per day.   Using the information in Table J.11 and the shortest processing time (SPT) rule, what should be the sequence of jobs processed at Q45?</strong> A) C-D-A-B B) D-A-C-B C) A-D-B-C D) B-A-D-C
Using the information in Table J.11 and the shortest processing time (SPT) rule, what should be the sequence of jobs processed at Q45?

A) C-D-A-B
B) D-A-C-B
C) A-D-B-C
D) B-A-D-C
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 123 في هذه المجموعة.
فتح الحزمة
k this deck
75
Table J.18
<strong>Table J.18   Use the information in Table J.18 and sequence the jobs using the EDD rule. What is the average flow time?</strong> A) fewer than or equal to 48 hours B) greater than 48 hours but fewer than or equal to 50 hours C) greater than 50 hours but fewer than or equal to 52 hours D) greater than 52 hours
Use the information in Table J.18 and sequence the jobs using the EDD rule. What is the average flow time?

A) fewer than or equal to 48 hours
B) greater than 48 hours but fewer than or equal to 50 hours
C) greater than 50 hours but fewer than or equal to 52 hours
D) greater than 52 hours
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 123 في هذه المجموعة.
فتح الحزمة
k this deck
76
Table J.9
There are three jobs available for processing at Workstation 1. They just arrived at Workstation 1, at the end of Day 0.
<strong>Table J.9 There are three jobs available for processing at Workstation 1. They just arrived at Workstation 1, at the end of Day 0.   Using the information in Table J.9 and the critical ratio rule, what is the average flow time?</strong> A) fewer than or equal to 9.0 days B) greater than 9.0 days but fewer than or equal to 10.0 days C) greater than 10.0 days but fewer than or equal to 11.0 days D) greater than 11.0 days
Using the information in Table J.9 and the critical ratio rule, what is the average flow time?

A) fewer than or equal to 9.0 days
B) greater than 9.0 days but fewer than or equal to 10.0 days
C) greater than 10.0 days but fewer than or equal to 11.0 days
D) greater than 11.0 days
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 123 في هذه المجموعة.
فتح الحزمة
k this deck
77
Table J.10
A workstation has six jobs waiting to be processed. They arrived at the end of Day 0 and it is now the beginning of Day 1. It is now time zero. Times are expressed in terms of days.
<strong>Table J.10 A workstation has six jobs waiting to be processed. They arrived at the end of Day 0 and it is now the beginning of Day 1. It is now time zero. Times are expressed in terms of days.   Using the information in Table J.10 and the earliest due date (EDD) rule, what is the average flow time?</strong> A) fewer than or equal to 20 days B) greater than 20 days but fewer than or equal to 22 days C) greater than 22 days but fewer than or equal to 24 days D) greater than 24 days
Using the information in Table J.10 and the earliest due date (EDD) rule, what is the average flow time?

A) fewer than or equal to 20 days
B) greater than 20 days but fewer than or equal to 22 days
C) greater than 22 days but fewer than or equal to 24 days
D) greater than 24 days
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 123 في هذه المجموعة.
فتح الحزمة
k this deck
78
Table J.11
Work center Q45 has four jobs that just arrived (the start of Day 1) to be processed, as shown in the following table. Assume the shop works eight hours per day.
<strong>Table J.11 Work center Q45 has four jobs that just arrived (the start of Day 1) to be processed, as shown in the following table. Assume the shop works eight hours per day.   Using the information in Table J.11 and the slack per remaining operations (S/RO) rule, what should be the sequence of jobs processed at Q45?</strong> A) D-C-A-B B) A-B-C-D C) D-A-C-B D) B-C-A-D
Using the information in Table J.11 and the slack per remaining operations (S/RO) rule, what should be the sequence of jobs processed at Q45?

A) D-C-A-B
B) A-B-C-D
C) D-A-C-B
D) B-C-A-D
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 123 في هذه المجموعة.
فتح الحزمة
k this deck
79
Table J.9
There are three jobs available for processing at Workstation 1. They just arrived at Workstation 1, at the end of Day 0.
<strong>Table J.9 There are three jobs available for processing at Workstation 1. They just arrived at Workstation 1, at the end of Day 0.   Using the information in Table J.9 and the critical ratio rule, what should be the sequence of jobs processed at Workstation 1?</strong> A) C-B-A B) B-A-C C) A-B-C D) B-C-A
Using the information in Table J.9 and the critical ratio rule, what should be the sequence of jobs processed at Workstation 1?

A) C-B-A
B) B-A-C
C) A-B-C
D) B-C-A
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 123 في هذه المجموعة.
فتح الحزمة
k this deck
80
Table J.11
Work center Q45 has four jobs that just arrived (the start of Day 1) to be processed, as shown in the following table. Assume the shop works eight hours per day.
<strong>Table J.11 Work center Q45 has four jobs that just arrived (the start of Day 1) to be processed, as shown in the following table. Assume the shop works eight hours per day.   Using the information in Table J.11 and the slack per remaining operations ratio (S/RO) rule, what is the average past due?</strong> A) fewer than or equal to 10 hours B) greater than 10 hours but fewer than or equal to 20 hours C) greater than 20 hours but fewer than or equal to 30 hours D) greater than 30 hours
Using the information in Table J.11 and the slack per remaining operations ratio (S/RO) rule, what is the average past due?

A) fewer than or equal to 10 hours
B) greater than 10 hours but fewer than or equal to 20 hours
C) greater than 20 hours but fewer than or equal to 30 hours
D) greater than 30 hours
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 123 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 123 في هذه المجموعة.