A(n) __________ is a plastic or fiber fitting designed to screw onto the ends of a conduit or cable connector to provide protection to the conductors.

A) threaded hub
B) bushing
C) connector nut
D) insulated bushing
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
__________ is a common wiring method used to bring the electrical power from the point of attachment to the meter socket and then on to the main service equipment.

A) Triplex cable
B) Service drop conductors
C) Service laterals
D) Service entrance cable
سؤال
When connecting sub-panel feeder conductors in the main panel, both the grounded neutral conductor and the grounding conductor are connected to the main panel grounded neutral bar.
سؤال
The NEC requirements for minimum burial depths are found in Table __________.

A) 310.15 (B)(16)
B) 300.5
C) 250.66
D) 220.12
سؤال
The conductors that run overhead from the utility transformer to the residence are called the __________.

A) service entrance cable
B) service drop conductors
C) service laterals
D) SEU cable
سؤال
The NEC provides the specifications for working space around electrical equipment in Article __________.

A) 210
B) 200
C) 110
D) 100
سؤال
When using service entrance cable for the run between the weatherhead and the meter socket, the cable must be supported within __________ of both the weatherhead and the meter socket.

A) 12"
B) 18"
C) 24"
D) 30"
سؤال
When installing an underground service, a warning tape must be installed at least __________ inches above the buried service entrance conductors.

A) 8
B) 12
C) 18
D) 24
سؤال
A porcelain standoff fitting is used to attach the service drop cable to the side of a house.
سؤال
When installing an overhead service, __________ feet of conductor should stick out of the weatherhead for the formation of a drip loop.

A) 1
B) 1.5
C) 2
D) 3
سؤال
According to the NEC, the working space in front of a service entrance panel in a residential wiring application must be at least 6.5' high, 30" wide, and extend at least __________ feet in front of the panel.

A) 1
B) 3
C) 2
D) 4
سؤال
Section 338.12(B)(2) does not allow USE to be used above ground, except where it emerges from the ground and terminates in a meter socket.
سؤال
In a sub-panel, the grounding bar and the neutral bar are electrically connected together so that the white grounded conductors and the bare or green grounding conductors can all terminate at the same location.
سؤال
Where underground service cables exit the trench and run up a utility pole to the transformer, the conductors must be protected from physical damage to a height of __________ feet above final grade.

A) 3
B) 8
C) 10
D) 12
سؤال
Where underground service conductors exit the trench to run up to a meter socket on the side of a house, __________ is not permitted to be used to provide the conductors with protection from physical damage.

A) rigid metal conduit
B) intermediate metal conduit
C) electrical metallic tubing
D) schedule 80 rigid pvc conduit
سؤال
When installing a service entrance cable to the bottom of a meter socket enclosure located on the side of a house, you must use a rain-tight connector like the one used to connect the cable to the threaded hub.
سؤال
The grounding electrode conductor must be attached to a metal water pipe grounding electrode no more than __________ feet from the point where the metal water pipe enters the house.

A) 3
B) 5
C) 7
D) 9
سؤال
The service conductors that run underground from the utility transformer to the meter socket are known as the __________.

A) service drop conductors
B) service entrance conductors
C) service lateral
D) triplex conductors
سؤال
If a metal water pipe is used as a grounding electrode, a supplemental grounding electrode must be used only if the resistance to ground exceeds 25 ohms.
سؤال
Electrical Metallic Tubing is permitted to be used as a service raceway.
سؤال
Explain why sub-panels are often used in residential services.
سؤال
Explain the purpose of a weatherhead when used on either a service raceway or service entrance cable.
سؤال
A service mast is made of rigid metal conduit or intermediate metal conduit and should be at least a __________ trade size conduit to provide adequate strength.

A) 1"
B) 1.5"
C) 2"
D) 2.5"
سؤال
When Type NM or Type SER cable is used as a feeder cable supplying power to a sub-panel, the cables must be supported within __________ inches of both the main panel and the sub-panel.

A) 8
B) 12
C) 24
D) 30
سؤال
Conduit clamps used to support a service raceway installed on the side of a house must be installed no more than ____________________ feet from the weatherhead and meter socket.
سؤال
The service drop for a residential overhead service entrance is usually installed with __________.

A) service entrance cable
B) individual conductors
C) triplex cable
D) quadplex cable
سؤال
Incoming electrical power is connected to the ____________________ side of electrical equipment.
سؤال
The meter socket is usually located so the center of the kWh meter is from ____________________ to ____________________ feet above final grade.
سؤال
____________________ is a wiring technique that allows electrical power from an existing electrical panel to be fed to a new panel by a short length of cable.
سؤال
The amount of voltage that is needed to push the house electrical load current through the wires from the utility transformer, to the service panel, and back to the transformer is called __________.

A) house current
B) voltage drop
C) volts
D) pressure
سؤال
A(n) ____________________ is a type of conduit body that allows for a 90 degree change of direction in a raceway path. It is often used to allow the service raceway to run from the meter socket, through the side of the house, and continue to the service equipment enclosure.
سؤال
A(n) __________ usually includes a weatherhead, a porcelain standoff fitting, a rubber weather collar, and a piece of roof flashing.

A) service packet
B) mast kit
C) service entrance package
D) entrance kit
سؤال
If aluminum service conductors are being used, make sure a(n) ____________________ is used at each termination point to prevent oxidation of the conductors.
سؤال
Three or four USE conductors can be combined together in a single cable assembly and used in a residential underground service installation. This type of cable is referred to as __________ cable.

A) VUF
B) UF
C) SER
D) URD
سؤال
A _________________________ is installed over the service cable at the point where it goes through the hole in the side of the house to prevent water from entering the house.
سؤال
A(n) ____________________ is a surface on which a service panel or sub-panel is mounted. It is usually made of plywood and is often painted a flat black color.
سؤال
Explain what a M.L.O. panel is.
سؤال
Outgoing electrical power is connected to the ____________________ side of electrical equipment.
سؤال
The working space in front of residential service equipment as stated in NEC Section 110.26 is __________ feet.

A) 2
B) 3
C) 4
D) 5
سؤال
A/an _________________________________ is a device used to provide a connection point for cable television, satellite TV, telephone, and any other system that requires being bonded to the house electrical power system grounding electrode.
سؤال
Calculate the voltage drop of a 120/240 volt, 3-wire underground residential service installed with 2 AWG aluminum URD cable if the load is 80 amps and the one-way length of the underground service conductors is 100 feet.
سؤال
Explain the purpose of a porcelain standoff fitting.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/42
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 8: Service Entrance Equipment and Installation
1
A(n) __________ is a plastic or fiber fitting designed to screw onto the ends of a conduit or cable connector to provide protection to the conductors.

A) threaded hub
B) bushing
C) connector nut
D) insulated bushing
D
2
__________ is a common wiring method used to bring the electrical power from the point of attachment to the meter socket and then on to the main service equipment.

A) Triplex cable
B) Service drop conductors
C) Service laterals
D) Service entrance cable
D
3
When connecting sub-panel feeder conductors in the main panel, both the grounded neutral conductor and the grounding conductor are connected to the main panel grounded neutral bar.
True
4
The NEC requirements for minimum burial depths are found in Table __________.

A) 310.15 (B)(16)
B) 300.5
C) 250.66
D) 220.12
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 42 في هذه المجموعة.
فتح الحزمة
k this deck
5
The conductors that run overhead from the utility transformer to the residence are called the __________.

A) service entrance cable
B) service drop conductors
C) service laterals
D) SEU cable
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 42 في هذه المجموعة.
فتح الحزمة
k this deck
6
The NEC provides the specifications for working space around electrical equipment in Article __________.

A) 210
B) 200
C) 110
D) 100
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 42 في هذه المجموعة.
فتح الحزمة
k this deck
7
When using service entrance cable for the run between the weatherhead and the meter socket, the cable must be supported within __________ of both the weatherhead and the meter socket.

A) 12"
B) 18"
C) 24"
D) 30"
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 42 في هذه المجموعة.
فتح الحزمة
k this deck
8
When installing an underground service, a warning tape must be installed at least __________ inches above the buried service entrance conductors.

A) 8
B) 12
C) 18
D) 24
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 42 في هذه المجموعة.
فتح الحزمة
k this deck
9
A porcelain standoff fitting is used to attach the service drop cable to the side of a house.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 42 في هذه المجموعة.
فتح الحزمة
k this deck
10
When installing an overhead service, __________ feet of conductor should stick out of the weatherhead for the formation of a drip loop.

A) 1
B) 1.5
C) 2
D) 3
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 42 في هذه المجموعة.
فتح الحزمة
k this deck
11
According to the NEC, the working space in front of a service entrance panel in a residential wiring application must be at least 6.5' high, 30" wide, and extend at least __________ feet in front of the panel.

A) 1
B) 3
C) 2
D) 4
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 42 في هذه المجموعة.
فتح الحزمة
k this deck
12
Section 338.12(B)(2) does not allow USE to be used above ground, except where it emerges from the ground and terminates in a meter socket.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 42 في هذه المجموعة.
فتح الحزمة
k this deck
13
In a sub-panel, the grounding bar and the neutral bar are electrically connected together so that the white grounded conductors and the bare or green grounding conductors can all terminate at the same location.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 42 في هذه المجموعة.
فتح الحزمة
k this deck
14
Where underground service cables exit the trench and run up a utility pole to the transformer, the conductors must be protected from physical damage to a height of __________ feet above final grade.

A) 3
B) 8
C) 10
D) 12
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 42 في هذه المجموعة.
فتح الحزمة
k this deck
15
Where underground service conductors exit the trench to run up to a meter socket on the side of a house, __________ is not permitted to be used to provide the conductors with protection from physical damage.

A) rigid metal conduit
B) intermediate metal conduit
C) electrical metallic tubing
D) schedule 80 rigid pvc conduit
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 42 في هذه المجموعة.
فتح الحزمة
k this deck
16
When installing a service entrance cable to the bottom of a meter socket enclosure located on the side of a house, you must use a rain-tight connector like the one used to connect the cable to the threaded hub.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 42 في هذه المجموعة.
فتح الحزمة
k this deck
17
The grounding electrode conductor must be attached to a metal water pipe grounding electrode no more than __________ feet from the point where the metal water pipe enters the house.

A) 3
B) 5
C) 7
D) 9
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 42 في هذه المجموعة.
فتح الحزمة
k this deck
18
The service conductors that run underground from the utility transformer to the meter socket are known as the __________.

A) service drop conductors
B) service entrance conductors
C) service lateral
D) triplex conductors
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 42 في هذه المجموعة.
فتح الحزمة
k this deck
19
If a metal water pipe is used as a grounding electrode, a supplemental grounding electrode must be used only if the resistance to ground exceeds 25 ohms.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 42 في هذه المجموعة.
فتح الحزمة
k this deck
20
Electrical Metallic Tubing is permitted to be used as a service raceway.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 42 في هذه المجموعة.
فتح الحزمة
k this deck
21
Explain why sub-panels are often used in residential services.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 42 في هذه المجموعة.
فتح الحزمة
k this deck
22
Explain the purpose of a weatherhead when used on either a service raceway or service entrance cable.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 42 في هذه المجموعة.
فتح الحزمة
k this deck
23
A service mast is made of rigid metal conduit or intermediate metal conduit and should be at least a __________ trade size conduit to provide adequate strength.

A) 1"
B) 1.5"
C) 2"
D) 2.5"
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 42 في هذه المجموعة.
فتح الحزمة
k this deck
24
When Type NM or Type SER cable is used as a feeder cable supplying power to a sub-panel, the cables must be supported within __________ inches of both the main panel and the sub-panel.

A) 8
B) 12
C) 24
D) 30
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 42 في هذه المجموعة.
فتح الحزمة
k this deck
25
Conduit clamps used to support a service raceway installed on the side of a house must be installed no more than ____________________ feet from the weatherhead and meter socket.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 42 في هذه المجموعة.
فتح الحزمة
k this deck
26
The service drop for a residential overhead service entrance is usually installed with __________.

A) service entrance cable
B) individual conductors
C) triplex cable
D) quadplex cable
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 42 في هذه المجموعة.
فتح الحزمة
k this deck
27
Incoming electrical power is connected to the ____________________ side of electrical equipment.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 42 في هذه المجموعة.
فتح الحزمة
k this deck
28
The meter socket is usually located so the center of the kWh meter is from ____________________ to ____________________ feet above final grade.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 42 في هذه المجموعة.
فتح الحزمة
k this deck
29
____________________ is a wiring technique that allows electrical power from an existing electrical panel to be fed to a new panel by a short length of cable.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 42 في هذه المجموعة.
فتح الحزمة
k this deck
30
The amount of voltage that is needed to push the house electrical load current through the wires from the utility transformer, to the service panel, and back to the transformer is called __________.

A) house current
B) voltage drop
C) volts
D) pressure
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 42 في هذه المجموعة.
فتح الحزمة
k this deck
31
A(n) ____________________ is a type of conduit body that allows for a 90 degree change of direction in a raceway path. It is often used to allow the service raceway to run from the meter socket, through the side of the house, and continue to the service equipment enclosure.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 42 في هذه المجموعة.
فتح الحزمة
k this deck
32
A(n) __________ usually includes a weatherhead, a porcelain standoff fitting, a rubber weather collar, and a piece of roof flashing.

A) service packet
B) mast kit
C) service entrance package
D) entrance kit
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 42 في هذه المجموعة.
فتح الحزمة
k this deck
33
If aluminum service conductors are being used, make sure a(n) ____________________ is used at each termination point to prevent oxidation of the conductors.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 42 في هذه المجموعة.
فتح الحزمة
k this deck
34
Three or four USE conductors can be combined together in a single cable assembly and used in a residential underground service installation. This type of cable is referred to as __________ cable.

A) VUF
B) UF
C) SER
D) URD
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 42 في هذه المجموعة.
فتح الحزمة
k this deck
35
A _________________________ is installed over the service cable at the point where it goes through the hole in the side of the house to prevent water from entering the house.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 42 في هذه المجموعة.
فتح الحزمة
k this deck
36
A(n) ____________________ is a surface on which a service panel or sub-panel is mounted. It is usually made of plywood and is often painted a flat black color.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 42 في هذه المجموعة.
فتح الحزمة
k this deck
37
Explain what a M.L.O. panel is.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 42 في هذه المجموعة.
فتح الحزمة
k this deck
38
Outgoing electrical power is connected to the ____________________ side of electrical equipment.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 42 في هذه المجموعة.
فتح الحزمة
k this deck
39
The working space in front of residential service equipment as stated in NEC Section 110.26 is __________ feet.

A) 2
B) 3
C) 4
D) 5
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 42 في هذه المجموعة.
فتح الحزمة
k this deck
40
A/an _________________________________ is a device used to provide a connection point for cable television, satellite TV, telephone, and any other system that requires being bonded to the house electrical power system grounding electrode.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 42 في هذه المجموعة.
فتح الحزمة
k this deck
41
Calculate the voltage drop of a 120/240 volt, 3-wire underground residential service installed with 2 AWG aluminum URD cable if the load is 80 amps and the one-way length of the underground service conductors is 100 feet.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 42 في هذه المجموعة.
فتح الحزمة
k this deck
42
Explain the purpose of a porcelain standoff fitting.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 42 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 42 في هذه المجموعة.