Deck 13: Generator

ملء الشاشة (f)
exit full mode
سؤال
Mixing of grease formulations may cause a breakdown of lubricating properties.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Visual inspection items for a generator may include: mounting hardware, bearing discoloration, and ___________.

A) rotor slip ring condition
B) lubricant texture and color
C) paint color
D) All answers are correct
سؤال
Component alignment activities during a maintenance cycle may include correction of ______.

A) soft foot
B) axial misalignment
C) parallel misalignment
D) All answers are correct
سؤال
Insulation resistance testing of stator windings is a good predictive maintenance practice to track generator condition.
سؤال
Dimension "B" input for the LASER alignment control unit is the distance between fasteners mounting the generator feet.
سؤال
The LASER stationary head should be mounted on the generator shaft for an alignment activity.
سؤال
Never look directly at the LASER transmitter light because it can cause eye damage.
سؤال
Visual indications a generator may be operating above the rated temperature specification include: discoloration or darkening of painted surfaces and melted informational decals.
سؤال
Generator misalignment may be seen during a visual inspection as damage to the shaft coupling or bearings.
سؤال
Generic alignment steps include mounting the LASER heads and ______.

A) reviewing MSDS for lubricant
B) painting the gearbox
C) measure distance between LASER heads
D) All answers are correct
سؤال
An approved LOTO procedure should be completed before inspecting power cable terminals in generator junction boxes.
سؤال
Wind turbine generators are classified as either permanent magnet or electromagnet designs.
سؤال
Electrical maintenance activities for a generator may include checking wire connections and ____________.

A) changing slip ring brushes
B) checking ground connections
C) testing winding insulation
D) All answers are correct
سؤال
All wind trubine manufaturers use forced air cooling systems for their generators.
سؤال
Documentation on PM checklists typically include part number and __________.

A) quantity of consumables
B) service truck color
C) age of the technician
D) All answers are correct
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/15
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 13: Generator
1
Mixing of grease formulations may cause a breakdown of lubricating properties.
True
2
Visual inspection items for a generator may include: mounting hardware, bearing discoloration, and ___________.

A) rotor slip ring condition
B) lubricant texture and color
C) paint color
D) All answers are correct
D
3
Component alignment activities during a maintenance cycle may include correction of ______.

A) soft foot
B) axial misalignment
C) parallel misalignment
D) All answers are correct
D
4
Insulation resistance testing of stator windings is a good predictive maintenance practice to track generator condition.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
5
Dimension "B" input for the LASER alignment control unit is the distance between fasteners mounting the generator feet.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
6
The LASER stationary head should be mounted on the generator shaft for an alignment activity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
7
Never look directly at the LASER transmitter light because it can cause eye damage.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
8
Visual indications a generator may be operating above the rated temperature specification include: discoloration or darkening of painted surfaces and melted informational decals.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
9
Generator misalignment may be seen during a visual inspection as damage to the shaft coupling or bearings.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
10
Generic alignment steps include mounting the LASER heads and ______.

A) reviewing MSDS for lubricant
B) painting the gearbox
C) measure distance between LASER heads
D) All answers are correct
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
11
An approved LOTO procedure should be completed before inspecting power cable terminals in generator junction boxes.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
12
Wind turbine generators are classified as either permanent magnet or electromagnet designs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
13
Electrical maintenance activities for a generator may include checking wire connections and ____________.

A) changing slip ring brushes
B) checking ground connections
C) testing winding insulation
D) All answers are correct
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
14
All wind trubine manufaturers use forced air cooling systems for their generators.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
15
Documentation on PM checklists typically include part number and __________.

A) quantity of consumables
B) service truck color
C) age of the technician
D) All answers are correct
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.