Deck 33: Construction Documentation, Specifications, and Project Manuals

ملء الشاشة (f)
exit full mode
سؤال
The Description of Materials form consists of eight categories describing both the materials and methods to be used for construction.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Which section of the specifications describes the method for installing the projects materials and how to perform the work?

A) General
B) Execution
C) Materials
D) Equipment
سؤال
A minimum standard for quality or performance can be established by using a _____ specification.

A) performance
B) proprietary
C) descriptive
D) reference
سؤال
The descriptive specifications are _____.

A) exclusively used within a project manual
B) the least detailed type of specification
C) used to describe the conditions or parameters a project must function in
D) used when information regarding quality or quantity has not been determined
سؤال
What type of bond is a guarantee that the firm will complete the job and not become defunct during the process?

A) labor and materials bond
B) addenda bond
C) performance bond
D) bid bond
سؤال
The written specifications constitute the bulk of a project manual.
سؤال
Closed specifications are often used on renovations where a specific product must match existing conditions.
سؤال
Specifications that define the desired results of a product or system are proprietary specifications.
سؤال
A construction document should be limited to only one specific type of specification.
سؤال
What should drawings do?

A) show the types of material in the structure
B) show the quality of materials in the structure
C) depict the physical relationship of materials
D) express dimensions and sizes in dual units
سؤال
When preparing the specifications, if expressing units in metric, all sizes should be listed in _____, except for large distances.

A) feet
B) inches
C) millimeters
D) centimeters
سؤال
What is one of the major categories related to structural information on the Description of Materials form?

A) lath and plaster
B) sub-flooring
C) insulation
D) interior doors and trim
سؤال
What are the two major groups of the MasterFormat system?

A) Procurement and Contract Requirements and Specification groups
B) Process Equipment and Facility Services
C) Site and Infrastructure
D) General requirements and Facility Construction
سؤال
Specifications describe which of the following?

A) site location
B) project financing plans
C) code requirements
D) design team qualifications
سؤال
The purpose of the _____ form is to provide each bidder with the format for reviewing bids.

A) general conditions of the contract for construction
B) supplementary conditions
C) bid
D) instruction to bidders
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/15
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 33: Construction Documentation, Specifications, and Project Manuals
1
The Description of Materials form consists of eight categories describing both the materials and methods to be used for construction.
False
2
Which section of the specifications describes the method for installing the projects materials and how to perform the work?

A) General
B) Execution
C) Materials
D) Equipment
B
3
A minimum standard for quality or performance can be established by using a _____ specification.

A) performance
B) proprietary
C) descriptive
D) reference
D
4
The descriptive specifications are _____.

A) exclusively used within a project manual
B) the least detailed type of specification
C) used to describe the conditions or parameters a project must function in
D) used when information regarding quality or quantity has not been determined
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
5
What type of bond is a guarantee that the firm will complete the job and not become defunct during the process?

A) labor and materials bond
B) addenda bond
C) performance bond
D) bid bond
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
6
The written specifications constitute the bulk of a project manual.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
7
Closed specifications are often used on renovations where a specific product must match existing conditions.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
8
Specifications that define the desired results of a product or system are proprietary specifications.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
9
A construction document should be limited to only one specific type of specification.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
10
What should drawings do?

A) show the types of material in the structure
B) show the quality of materials in the structure
C) depict the physical relationship of materials
D) express dimensions and sizes in dual units
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
11
When preparing the specifications, if expressing units in metric, all sizes should be listed in _____, except for large distances.

A) feet
B) inches
C) millimeters
D) centimeters
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
12
What is one of the major categories related to structural information on the Description of Materials form?

A) lath and plaster
B) sub-flooring
C) insulation
D) interior doors and trim
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
13
What are the two major groups of the MasterFormat system?

A) Procurement and Contract Requirements and Specification groups
B) Process Equipment and Facility Services
C) Site and Infrastructure
D) General requirements and Facility Construction
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
14
Specifications describe which of the following?

A) site location
B) project financing plans
C) code requirements
D) design team qualifications
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
15
The purpose of the _____ form is to provide each bidder with the format for reviewing bids.

A) general conditions of the contract for construction
B) supplementary conditions
C) bid
D) instruction to bidders
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.