سؤال
A(n) ____ permit may be required for storm water disposal.

A) mechanical
B) plumbing
C) electrical
D) building
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
When completing the elevations, items on the ELEV NEWW layer should be drawn with _____.

A) thin black continuous lines
B) thick black continuous lines
C) thin black dashed lines
D) thick black dashed lines
سؤال
Which of the following should be represented on the sections?

A) existing material that will be removed
B) all cabinet doors, drawers, and open shelves
C) all new openings including skylights, windows, and doors
D) intersections of the new and old floor
سؤال
When the floor plan is complete, ____ and notes should clearly define all new materials.

A) sections
B) dimensions
C) footprints
D) drawing symbols
سؤال
An addition is defined by the IRC a existing structure caused by increasing the existing floor area or by increasing or altering the height of a structure.
سؤال
Structures built prior to the 1940s are most likely made using western platform construction.
سؤال
A ____ is a useful tool to provide support while sketching and placing field notes.

A) flashlight
B) camera
C) ladder
D) clipboard
سؤال
The ____ for a remodel must show the size of the job site, the street, easements, setbacks, and the footprint of the existing structure, including decks.

A) foundation plan
B) floor plan
C) site map
D) site plan
سؤال
The ____ will provide the size of the proposed job site and help you to determine the property lines.

A) site map
B) floor plan
C) building permit
D) foundation plan
سؤال
A permit is required to construct, enlarge, alter, move, or demolish any one- or two-family dwelling or similar structure.
سؤال
New crawl access, new vents, and new hold down and connectors required for lateral bracing should be represented on the _____.

A) interior elevations
B) exterior elevations
C) foundation plan
D) framing plan
سؤال
The ____ shows the intersection of the existing and new foundation and floor systems.

A) foundation plan
B) floor plan
C) site map
D) site plan
سؤال
The ____ plan shows the existing walls and materials to be removed to prepare the site for the new project.

A) site
B) demolition
C) floor
D) renovation
سؤال
Building permits required for a remodel or addition include the structural, electrical, plumbing, and mechanical permits.
سؤال
The framing plan for a remodel is similar to the framing plan required for new construction.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/15
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 35: Renovations, Remodeling, and Additions
1
A(n) ____ permit may be required for storm water disposal.

A) mechanical
B) plumbing
C) electrical
D) building
B
2
When completing the elevations, items on the ELEV NEWW layer should be drawn with _____.

A) thin black continuous lines
B) thick black continuous lines
C) thin black dashed lines
D) thick black dashed lines
A
3
Which of the following should be represented on the sections?

A) existing material that will be removed
B) all cabinet doors, drawers, and open shelves
C) all new openings including skylights, windows, and doors
D) intersections of the new and old floor
D
4
When the floor plan is complete, ____ and notes should clearly define all new materials.

A) sections
B) dimensions
C) footprints
D) drawing symbols
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
5
An addition is defined by the IRC a existing structure caused by increasing the existing floor area or by increasing or altering the height of a structure.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
6
Structures built prior to the 1940s are most likely made using western platform construction.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
7
A ____ is a useful tool to provide support while sketching and placing field notes.

A) flashlight
B) camera
C) ladder
D) clipboard
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
8
The ____ for a remodel must show the size of the job site, the street, easements, setbacks, and the footprint of the existing structure, including decks.

A) foundation plan
B) floor plan
C) site map
D) site plan
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
9
The ____ will provide the size of the proposed job site and help you to determine the property lines.

A) site map
B) floor plan
C) building permit
D) foundation plan
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
10
A permit is required to construct, enlarge, alter, move, or demolish any one- or two-family dwelling or similar structure.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
11
New crawl access, new vents, and new hold down and connectors required for lateral bracing should be represented on the _____.

A) interior elevations
B) exterior elevations
C) foundation plan
D) framing plan
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
12
The ____ shows the intersection of the existing and new foundation and floor systems.

A) foundation plan
B) floor plan
C) site map
D) site plan
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
13
The ____ plan shows the existing walls and materials to be removed to prepare the site for the new project.

A) site
B) demolition
C) floor
D) renovation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
14
Building permits required for a remodel or addition include the structural, electrical, plumbing, and mechanical permits.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
15
The framing plan for a remodel is similar to the framing plan required for new construction.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.