Deck 6: Programming Concepts and Job Planning

ملء الشاشة (f)
exit full mode
سؤال
Why do complicated drawings take so long to understand?
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
The NC part program is made up of distinct units of instruction called ____.

A) words
B) addresses
C) logistics
D) blocks
سؤال
What are the two types of codes found in an NC part program?
سؤال
What is the difference between modal and non-modal codes?
سؤال
____ compensation automatically offsets the tool from the programmed path.

A) Length
B) Tool radius
C) Drilling
D) Cyclic
سؤال
Provide some guidelines for developing efficient workpiece setups.
سؤال
Most programs today are written on modern, PC-based computers with a text editor that makes it very easy to copy and paste redundant code and to make changes at will.
سؤال
Toolpaths are difficult to plot because we have to manually compensate for the ____ of the tool.

A) volume
B) material
C) radius
D) length
سؤال
The geometry of the finished workpiece will be the ultimate measure of the success or failure of your programming.
سؤال
____ pins are cylindrical pins that have been ground slightly oversized.

A) Clearance
B) Bearing
C) Dowel
D) Reaming
سؤال
The key to properly locating a workpiece is a principle called ____.

A) 3-2-1
B) datum
C) the primary principle
D) referencing
سؤال
In the end, it does not really matter where you put the work zero as long as it is kept in the proper relation to the locating surfaces.
سؤال
A(n) ____ is a reference plane or point that is defined on the engineering drawing from which other dimensions are established.

A) address
B) word
C) letter
D) datum
سؤال
The term ____ describes codes or values that stay active until changed by another code or value.

A) word
B) modal
C) part program
D) address
سؤال
Rough, cast, and saw-cut surfaces must usually be ____ before they can be used as locating surfaces.

A) drilled
B) qualified
C) fixed
D) curved
سؤال
What is the first step in planning and executing a CNC machining job?

A) Determining which tools are available
B) Writing the part program
C) Studying the workpiece drawing
D) Planning the operations and setups
سؤال
On most raw materials, the stock faces are relatively flat and square from the mill.
سؤال
We know from our study of the Cartesian coordinate system that any location in the first quadrant will have ____ coordinates.

A) positive
B) negative
C) irrational
D) imaginary
سؤال
What information should be included in the program's comments?
سؤال
Modern CNC machine tools can be programmed to perform machining operations with a language commonly referred to as H & N codes.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/20
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 6: Programming Concepts and Job Planning
1
Why do complicated drawings take so long to understand?
Complicated drawings can take hours to fully comprehend. You need to understand the form of each feature, its relationship to other features, and the implication of the tolerances before planning any machining operations. For example, you might notice a hole in the center of the workpiece. What kind of hole should this be? Should you drill the hole, ream it, or bore it? Can this hole be milled with an end mill or is a counterbore the proper tool to use? All of these questions are based on the specified tolerances and the required quality of the finished feature. Failure to understand these relationships will lead to wasted time and a scrapped part.
2
The NC part program is made up of distinct units of instruction called ____.

A) words
B) addresses
C) logistics
D) blocks
D
3
What are the two types of codes found in an NC part program?
There are two fundamentally different types of codes found in an NC part program. The first type of code controls machine functions and settings. The second type of code is used to modify and perform machining functions. The arrangement and use of these codes will form the fundamental structure of the part program.
4
What is the difference between modal and non-modal codes?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
5
____ compensation automatically offsets the tool from the programmed path.

A) Length
B) Tool radius
C) Drilling
D) Cyclic
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
6
Provide some guidelines for developing efficient workpiece setups.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
7
Most programs today are written on modern, PC-based computers with a text editor that makes it very easy to copy and paste redundant code and to make changes at will.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
8
Toolpaths are difficult to plot because we have to manually compensate for the ____ of the tool.

A) volume
B) material
C) radius
D) length
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
9
The geometry of the finished workpiece will be the ultimate measure of the success or failure of your programming.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
10
____ pins are cylindrical pins that have been ground slightly oversized.

A) Clearance
B) Bearing
C) Dowel
D) Reaming
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
11
The key to properly locating a workpiece is a principle called ____.

A) 3-2-1
B) datum
C) the primary principle
D) referencing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
12
In the end, it does not really matter where you put the work zero as long as it is kept in the proper relation to the locating surfaces.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
13
A(n) ____ is a reference plane or point that is defined on the engineering drawing from which other dimensions are established.

A) address
B) word
C) letter
D) datum
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
14
The term ____ describes codes or values that stay active until changed by another code or value.

A) word
B) modal
C) part program
D) address
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
15
Rough, cast, and saw-cut surfaces must usually be ____ before they can be used as locating surfaces.

A) drilled
B) qualified
C) fixed
D) curved
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
16
What is the first step in planning and executing a CNC machining job?

A) Determining which tools are available
B) Writing the part program
C) Studying the workpiece drawing
D) Planning the operations and setups
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
17
On most raw materials, the stock faces are relatively flat and square from the mill.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
18
We know from our study of the Cartesian coordinate system that any location in the first quadrant will have ____ coordinates.

A) positive
B) negative
C) irrational
D) imaginary
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
19
What information should be included in the program's comments?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
20
Modern CNC machine tools can be programmed to perform machining operations with a language commonly referred to as H & N codes.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.