Deck 10: Information Systems Analysis and Design

ملء الشاشة (f)
exit full mode
سؤال
Most information systems rely on computers and communications networks to store, process, and transmit information with far more efficiency than would be possible with manual systems.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Most new information systems require new hardware, which can either replace old equipment or be connected to existing equipment.
سؤال
An RFQ essentially asks a vendor to recommend hardware and software for a solution and describe the vendor's qualifications for implementing the solution.
سؤال
A decision support system takes the place of a human decision maker.
سؤال
MRP is an ongoing iterative process that helps businesses rethink and radically redesign practices to improve performance.
سؤال
Traditionally, information systems have contributed most to solving unstructured problems, although tools have emerged to help people tackle semi-structured and structured problems as well.
سؤال
Feature creep is the failure to constrain change.
سؤال
In a JIT manufacturing system, the parts needed to construct a finished product are produced or arrive at the assembly site just when they are needed.
سؤال
A Systems Requirements Report describes the objectives for a new information system.
سؤال
A modified waterfall SDLC allows overlap between SDLC phases.
سؤال
A DSS can be used to tackle diverse problems because it contains a good selection of decision support tools.
سؤال
One of the major functions of an information system is to help people make decisions in response to problems.
سؤال
Workers typically collect the data for information systems.
سؤال
Information systems provide some or all of the data needed for strategic, tactical, and operational planning.
سؤال
Unit testing and integration testing are usually performed in a test area.
سؤال
A semi-structured problem is more routine than a structured problem.
سؤال
A neural network is a software tool containing an inference engine and a user interface that developers use to enter facts and rules for the knowledge base.
سؤال
The process of designing, entering, and testing the rules in an expert system is referred to as expert engineering.
سؤال
JIT (Just In Time) typically reduces costs by eliminating substantial warehousing costs and obsolete parts.
سؤال
BPR calculates and maintains an optimum manufacturing plan based on master production schedules, sales forecasts, inventory status, open orders, and bills of material.
سؤال
Batch processing, an interactive method in which each transaction is processed as it is entered, is the most modern transaction processing system.
سؤال
Despite new tools and the data they provide, many semi-structured and structured problems continue to be resolved based on "guesstimates."
سؤال
The cutover phase of the SDLC involves day-to-day operation of the system, making modifications to improve performance, and correcting problems.
سؤال
Planning management software helps managers track and visualize the complex interactions between tasks.
سؤال
The emphasis on long-range and future goals is referred to as tactical planning.
سؤال
After unit and integration testing are completed, system testing ensures that all hardware and software components work together correctly.
سؤال
In a DFD, an arrow symbolizes a data store .
سؤال
Some information systems store or provide access to subjective information generated by sources outside the organization.
سؤال
The maintenance phase of the SDLC is the least expensive part of the cycle.
سؤال
Nonprofit organizations are formed to accomplish social, political, or charitable goals that do not include amassing profit.
سؤال
A(n) expert system is a computer system designed to analyze data and produce a recommendation, diagnosis, or decision based on a set of facts and rules.
سؤال
If an expert system is using Boolean logic, it will let you respond to a question with an answer that includes a confidence level.
سؤال
OLTP uses a commit or rollback strategy to ensure that each transaction is processed correctly.
سؤال
Application specifications describe the way the information system's software should interact with users, store data, process data, and format reports.
سؤال
  The figure above characterizes a(n) MIS (management information system) .<div style=padding-top: 35px> The figure above characterizes a(n) MIS (management information system) .
سؤال
In the design phase of the SDLC, the project team must figure out WHY the new system will fulfill the requirements specified in the System Requirements Report.
سؤال
A parallel conversion avoids some of the risk of direct conversion because the old system remains in service while some or all of the new system is activated.
سؤال
The iterative SDLC allows overlap between the phases.
سؤال
Acceptance testing is designed to verify that the new information system works as required.
سؤال
A(n) DSS (Decision Support System) refers to a type of information system that uses the data collected by a transaction processing system, and manipulates that data to create reports that managers can use to make routine business decisions in response to structured problems.
سؤال
<strong>  A system like the one in the figure above is characterized by its ability to ____.</strong> A) list transactions B) produce routine reports C) replicate the reasoning of a human expert D) provide information for structured, routine decisions <div style=padding-top: 35px> A system like the one in the figure above is characterized by its ability to ____.

A) list transactions
B) produce routine reports
C) replicate the reasoning of a human expert
D) provide information for structured, routine decisions
سؤال
A decision ____ is a question or set of instructions describing data that must be gathered to make a decision.

A) model
B) query
C) scale
D) request
سؤال
Every organization has a goal or plan that is often referred to as its ____.

A) Web site
B) mission
C) master document
D) organizing principle
سؤال
A decision ____ is a numerical representation of a realistic situation, such as a cash-flow model of a business that shows how income adds to cash accounts and expenses deplete those accounts.

A) master
B) matrix
C) model
D) index
سؤال
Early transaction processing systems, such as banking and payroll applications of the 1970s, used ____ processing.

A) batch
B) online
C) OLTP
D) rollback
سؤال
A(n) ____ report combines, groups, or totals data.

A) exception
B) aggregate
C) ad hoc
D) summary
سؤال
Which of the following is NOT included in a Project Development Plan?

A) Description of project scope
B) Justification for the project
C) Performance reviews of all project team participants
D) Schedule for the project
سؤال
A DSS typically includes modeling tools, such as ____, so managers can create a numerical representation of a situation and explore "what-if" alternatives.

A) spreadsheets
B) databases
C) expert systems
D) Web pages
سؤال
____ is based on the idea that the best information systems are designed when end users and systems analysts work together as equal partners.

A) MRP
B) EID
C) RFP
D) JAD
سؤال
____ uses a commit or rollback strategy to ensure that each transaction is processed correctly.

A) TQM
B) ERP
C) OLTP
D) JIT
سؤال
Ad hoc reports are sometimes referred to as ____ reports.

A) summary
B) exception
C) scheduled
D) demand
سؤال
A(n) ____ is a group of people working together to accomplish a goal.

A) business
B) mission
C) organization
D) aggregate
سؤال
____ are the people who carry out the organization's mission.

A) Managers
B) CEOs
C) Workers
D) Associates
سؤال
An organizational ____ depicts the hierarchy of employees in a typical organization.

A) statement
B) strategy
C) roster
D) chart
سؤال
A knowledge base is stored in a computer file and can be manipulated by software called a(n) ____ engine.

A) inference
B) difference
C) reference
D) expert
سؤال
The facts and rules for an expert system are typically derived by interviewing one or more experts, and then incorporated into a(n) ____ base.

A) master
B) knowledge
C) expert
D) indexed
سؤال
Which of the following is NOT a responsibility of a systems analyst?

A) Analyzing information requirements
B) Supervising the implementation of requirements
C) Creating a development methodology
D) Creating specifications for application software
سؤال
A(n) ____ helps people make decisions by directly manipulating data, analyzing data from external sources, generating statistical projections, and creating data models of various scenarios.

A) DSS
B) EIS
C) TPS
D) MIS
سؤال
Setting incremental goals that can be achieved in a year or less is a process called ____ planning.

A) tactical
B) strategic
C) operational
D) futuristic
سؤال
A(n) ____ report contains information that is outside normal or acceptable ranges.

A) additional
B) exception
C) ad hoc
D) detailed
سؤال
A project team usually issues a(n) ____ to vendors when the members believe that a vendor has more knowledge and experience in the solution area.

A) RFP
B) RFQ
C) RFD
D) RFT
سؤال
A ____ chart uses bars to show the timing of development tasks as they occur over time.

A) progress
B) Gantt
C) WBS
D) PERT
سؤال
A project team submits an RFQ to vendors when it knows all of the following EXCEPT ____.

A) make of the equipment needed
B) model of the equipment needed
C) titles of the software packages needed
D) price of the software needed
سؤال
In the ____ phase of the SDLC, the project team must figure out how the new system will fulfill the requirements specified in the System Requirements Report.

A) design
B) planning
C) analysis
D) implementation
سؤال
A(n) ____ is a request for a formal price quotation on a list of hardware and software.

A) RFP
B) BDG
C) RFQ
D) SDLC
سؤال
In ____ processing, processing tasks are shared by servers and workstations.

A) automated
B) computerized
C) amortized
D) distributed
سؤال
Which of the following is true of turnkey systems?

A) They require maximum effort to select and set up equipment and software.
B) They require time and expertise to evaluate.
C) They require more time than programming languages.
D) They can be exactly tailored to meet system requirements.
سؤال
<strong>  The figure above shows an excerpt from a project team s application ____.</strong> A) mapping B) specification C) index D) glossary <div style=padding-top: 35px> The figure above shows an excerpt from a project team s application ____.

A) mapping
B) specification
C) index
D) glossary
سؤال
A ____ breaks a complex task into a series of subtasks.

A) WBS
B) PERT diagram
C) legend
D) Gantt chart
سؤال
A(n) ____ is a filing cabinet, disk, or tape that holds data, in a DFD.

A) data store
B) data flow
C) process
D) external entity
سؤال
Which of the following is true about using a programming language as an alternative to buying software?

A) This option does not require development time and expertise.
B) Software features might not exactly match business needs.
C) This option can be used to make a solution tailored to system requirements.
D) This might limit developers on the way they implement some system features.
سؤال
____ charts are arranged to show which tasks must be completed before subsequent dependent tasks can begin.

A) PERT
B) WBS
C) Gantt
D) Beta
سؤال
A ____ processing model is one in which data is processed on a centrally located computer.

A) fundamental
B) super
C) main
D) centralized
سؤال
____ is a method for analyzing the time needed to complete each project task.

A) Gantt
B) WBS
C) Pert
D) MRP
سؤال
Expert systems can be created with a computer programing language or an expert system ____.

A) index
B) shell
C) matrix
D) roster
سؤال
A ____ team is assigned to analyze and development an information system.

A) JAD
B) project
C) mission
D) beta
سؤال
In a JAD ____, users and analysts jointly identify problems and look for solutions.

A) session
B) turnkey
C) mission
D) department
سؤال
In the PIECES framework, a ____ problem means that an information system does not respond quickly enough to users, or takes too long to complete processing tasks.

A) response
B) processing
C) control
D) performance
سؤال
____ software for an information system is usually a series of pre-programmed software modules, supplied by a software developer, consulting company, or value added reseller.

A) Industrial
B) Commercial
C) Mercantile
D) Trade
سؤال
The goal of the ____ phase of the SDLC is to produce a list of requirements for a new or revised information system.

A) planning
B) analysis
C) design
D) implementation
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/175
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 10: Information Systems Analysis and Design
1
Most information systems rely on computers and communications networks to store, process, and transmit information with far more efficiency than would be possible with manual systems.
True
2
Most new information systems require new hardware, which can either replace old equipment or be connected to existing equipment.
True
3
An RFQ essentially asks a vendor to recommend hardware and software for a solution and describe the vendor's qualifications for implementing the solution.
False
4
A decision support system takes the place of a human decision maker.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 175 في هذه المجموعة.
فتح الحزمة
k this deck
5
MRP is an ongoing iterative process that helps businesses rethink and radically redesign practices to improve performance.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 175 في هذه المجموعة.
فتح الحزمة
k this deck
6
Traditionally, information systems have contributed most to solving unstructured problems, although tools have emerged to help people tackle semi-structured and structured problems as well.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 175 في هذه المجموعة.
فتح الحزمة
k this deck
7
Feature creep is the failure to constrain change.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 175 في هذه المجموعة.
فتح الحزمة
k this deck
8
In a JIT manufacturing system, the parts needed to construct a finished product are produced or arrive at the assembly site just when they are needed.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 175 في هذه المجموعة.
فتح الحزمة
k this deck
9
A Systems Requirements Report describes the objectives for a new information system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 175 في هذه المجموعة.
فتح الحزمة
k this deck
10
A modified waterfall SDLC allows overlap between SDLC phases.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 175 في هذه المجموعة.
فتح الحزمة
k this deck
11
A DSS can be used to tackle diverse problems because it contains a good selection of decision support tools.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 175 في هذه المجموعة.
فتح الحزمة
k this deck
12
One of the major functions of an information system is to help people make decisions in response to problems.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 175 في هذه المجموعة.
فتح الحزمة
k this deck
13
Workers typically collect the data for information systems.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 175 في هذه المجموعة.
فتح الحزمة
k this deck
14
Information systems provide some or all of the data needed for strategic, tactical, and operational planning.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 175 في هذه المجموعة.
فتح الحزمة
k this deck
15
Unit testing and integration testing are usually performed in a test area.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 175 في هذه المجموعة.
فتح الحزمة
k this deck
16
A semi-structured problem is more routine than a structured problem.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 175 في هذه المجموعة.
فتح الحزمة
k this deck
17
A neural network is a software tool containing an inference engine and a user interface that developers use to enter facts and rules for the knowledge base.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 175 في هذه المجموعة.
فتح الحزمة
k this deck
18
The process of designing, entering, and testing the rules in an expert system is referred to as expert engineering.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 175 في هذه المجموعة.
فتح الحزمة
k this deck
19
JIT (Just In Time) typically reduces costs by eliminating substantial warehousing costs and obsolete parts.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 175 في هذه المجموعة.
فتح الحزمة
k this deck
20
BPR calculates and maintains an optimum manufacturing plan based on master production schedules, sales forecasts, inventory status, open orders, and bills of material.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 175 في هذه المجموعة.
فتح الحزمة
k this deck
21
Batch processing, an interactive method in which each transaction is processed as it is entered, is the most modern transaction processing system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 175 في هذه المجموعة.
فتح الحزمة
k this deck
22
Despite new tools and the data they provide, many semi-structured and structured problems continue to be resolved based on "guesstimates."
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 175 في هذه المجموعة.
فتح الحزمة
k this deck
23
The cutover phase of the SDLC involves day-to-day operation of the system, making modifications to improve performance, and correcting problems.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 175 في هذه المجموعة.
فتح الحزمة
k this deck
24
Planning management software helps managers track and visualize the complex interactions between tasks.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 175 في هذه المجموعة.
فتح الحزمة
k this deck
25
The emphasis on long-range and future goals is referred to as tactical planning.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 175 في هذه المجموعة.
فتح الحزمة
k this deck
26
After unit and integration testing are completed, system testing ensures that all hardware and software components work together correctly.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 175 في هذه المجموعة.
فتح الحزمة
k this deck
27
In a DFD, an arrow symbolizes a data store .
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 175 في هذه المجموعة.
فتح الحزمة
k this deck
28
Some information systems store or provide access to subjective information generated by sources outside the organization.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 175 في هذه المجموعة.
فتح الحزمة
k this deck
29
The maintenance phase of the SDLC is the least expensive part of the cycle.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 175 في هذه المجموعة.
فتح الحزمة
k this deck
30
Nonprofit organizations are formed to accomplish social, political, or charitable goals that do not include amassing profit.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 175 في هذه المجموعة.
فتح الحزمة
k this deck
31
A(n) expert system is a computer system designed to analyze data and produce a recommendation, diagnosis, or decision based on a set of facts and rules.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 175 في هذه المجموعة.
فتح الحزمة
k this deck
32
If an expert system is using Boolean logic, it will let you respond to a question with an answer that includes a confidence level.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 175 في هذه المجموعة.
فتح الحزمة
k this deck
33
OLTP uses a commit or rollback strategy to ensure that each transaction is processed correctly.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 175 في هذه المجموعة.
فتح الحزمة
k this deck
34
Application specifications describe the way the information system's software should interact with users, store data, process data, and format reports.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 175 في هذه المجموعة.
فتح الحزمة
k this deck
35
  The figure above characterizes a(n) MIS (management information system) . The figure above characterizes a(n) MIS (management information system) .
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 175 في هذه المجموعة.
فتح الحزمة
k this deck
36
In the design phase of the SDLC, the project team must figure out WHY the new system will fulfill the requirements specified in the System Requirements Report.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 175 في هذه المجموعة.
فتح الحزمة
k this deck
37
A parallel conversion avoids some of the risk of direct conversion because the old system remains in service while some or all of the new system is activated.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 175 في هذه المجموعة.
فتح الحزمة
k this deck
38
The iterative SDLC allows overlap between the phases.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 175 في هذه المجموعة.
فتح الحزمة
k this deck
39
Acceptance testing is designed to verify that the new information system works as required.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 175 في هذه المجموعة.
فتح الحزمة
k this deck
40
A(n) DSS (Decision Support System) refers to a type of information system that uses the data collected by a transaction processing system, and manipulates that data to create reports that managers can use to make routine business decisions in response to structured problems.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 175 في هذه المجموعة.
فتح الحزمة
k this deck
41
<strong>  A system like the one in the figure above is characterized by its ability to ____.</strong> A) list transactions B) produce routine reports C) replicate the reasoning of a human expert D) provide information for structured, routine decisions A system like the one in the figure above is characterized by its ability to ____.

A) list transactions
B) produce routine reports
C) replicate the reasoning of a human expert
D) provide information for structured, routine decisions
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 175 في هذه المجموعة.
فتح الحزمة
k this deck
42
A decision ____ is a question or set of instructions describing data that must be gathered to make a decision.

A) model
B) query
C) scale
D) request
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 175 في هذه المجموعة.
فتح الحزمة
k this deck
43
Every organization has a goal or plan that is often referred to as its ____.

A) Web site
B) mission
C) master document
D) organizing principle
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 175 في هذه المجموعة.
فتح الحزمة
k this deck
44
A decision ____ is a numerical representation of a realistic situation, such as a cash-flow model of a business that shows how income adds to cash accounts and expenses deplete those accounts.

A) master
B) matrix
C) model
D) index
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 175 في هذه المجموعة.
فتح الحزمة
k this deck
45
Early transaction processing systems, such as banking and payroll applications of the 1970s, used ____ processing.

A) batch
B) online
C) OLTP
D) rollback
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 175 في هذه المجموعة.
فتح الحزمة
k this deck
46
A(n) ____ report combines, groups, or totals data.

A) exception
B) aggregate
C) ad hoc
D) summary
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 175 في هذه المجموعة.
فتح الحزمة
k this deck
47
Which of the following is NOT included in a Project Development Plan?

A) Description of project scope
B) Justification for the project
C) Performance reviews of all project team participants
D) Schedule for the project
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 175 في هذه المجموعة.
فتح الحزمة
k this deck
48
A DSS typically includes modeling tools, such as ____, so managers can create a numerical representation of a situation and explore "what-if" alternatives.

A) spreadsheets
B) databases
C) expert systems
D) Web pages
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 175 في هذه المجموعة.
فتح الحزمة
k this deck
49
____ is based on the idea that the best information systems are designed when end users and systems analysts work together as equal partners.

A) MRP
B) EID
C) RFP
D) JAD
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 175 في هذه المجموعة.
فتح الحزمة
k this deck
50
____ uses a commit or rollback strategy to ensure that each transaction is processed correctly.

A) TQM
B) ERP
C) OLTP
D) JIT
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 175 في هذه المجموعة.
فتح الحزمة
k this deck
51
Ad hoc reports are sometimes referred to as ____ reports.

A) summary
B) exception
C) scheduled
D) demand
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 175 في هذه المجموعة.
فتح الحزمة
k this deck
52
A(n) ____ is a group of people working together to accomplish a goal.

A) business
B) mission
C) organization
D) aggregate
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 175 في هذه المجموعة.
فتح الحزمة
k this deck
53
____ are the people who carry out the organization's mission.

A) Managers
B) CEOs
C) Workers
D) Associates
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 175 في هذه المجموعة.
فتح الحزمة
k this deck
54
An organizational ____ depicts the hierarchy of employees in a typical organization.

A) statement
B) strategy
C) roster
D) chart
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 175 في هذه المجموعة.
فتح الحزمة
k this deck
55
A knowledge base is stored in a computer file and can be manipulated by software called a(n) ____ engine.

A) inference
B) difference
C) reference
D) expert
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 175 في هذه المجموعة.
فتح الحزمة
k this deck
56
The facts and rules for an expert system are typically derived by interviewing one or more experts, and then incorporated into a(n) ____ base.

A) master
B) knowledge
C) expert
D) indexed
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 175 في هذه المجموعة.
فتح الحزمة
k this deck
57
Which of the following is NOT a responsibility of a systems analyst?

A) Analyzing information requirements
B) Supervising the implementation of requirements
C) Creating a development methodology
D) Creating specifications for application software
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 175 في هذه المجموعة.
فتح الحزمة
k this deck
58
A(n) ____ helps people make decisions by directly manipulating data, analyzing data from external sources, generating statistical projections, and creating data models of various scenarios.

A) DSS
B) EIS
C) TPS
D) MIS
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 175 في هذه المجموعة.
فتح الحزمة
k this deck
59
Setting incremental goals that can be achieved in a year or less is a process called ____ planning.

A) tactical
B) strategic
C) operational
D) futuristic
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 175 في هذه المجموعة.
فتح الحزمة
k this deck
60
A(n) ____ report contains information that is outside normal or acceptable ranges.

A) additional
B) exception
C) ad hoc
D) detailed
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 175 في هذه المجموعة.
فتح الحزمة
k this deck
61
A project team usually issues a(n) ____ to vendors when the members believe that a vendor has more knowledge and experience in the solution area.

A) RFP
B) RFQ
C) RFD
D) RFT
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 175 في هذه المجموعة.
فتح الحزمة
k this deck
62
A ____ chart uses bars to show the timing of development tasks as they occur over time.

A) progress
B) Gantt
C) WBS
D) PERT
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 175 في هذه المجموعة.
فتح الحزمة
k this deck
63
A project team submits an RFQ to vendors when it knows all of the following EXCEPT ____.

A) make of the equipment needed
B) model of the equipment needed
C) titles of the software packages needed
D) price of the software needed
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 175 في هذه المجموعة.
فتح الحزمة
k this deck
64
In the ____ phase of the SDLC, the project team must figure out how the new system will fulfill the requirements specified in the System Requirements Report.

A) design
B) planning
C) analysis
D) implementation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 175 في هذه المجموعة.
فتح الحزمة
k this deck
65
A(n) ____ is a request for a formal price quotation on a list of hardware and software.

A) RFP
B) BDG
C) RFQ
D) SDLC
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 175 في هذه المجموعة.
فتح الحزمة
k this deck
66
In ____ processing, processing tasks are shared by servers and workstations.

A) automated
B) computerized
C) amortized
D) distributed
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 175 في هذه المجموعة.
فتح الحزمة
k this deck
67
Which of the following is true of turnkey systems?

A) They require maximum effort to select and set up equipment and software.
B) They require time and expertise to evaluate.
C) They require more time than programming languages.
D) They can be exactly tailored to meet system requirements.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 175 في هذه المجموعة.
فتح الحزمة
k this deck
68
<strong>  The figure above shows an excerpt from a project team s application ____.</strong> A) mapping B) specification C) index D) glossary The figure above shows an excerpt from a project team s application ____.

A) mapping
B) specification
C) index
D) glossary
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 175 في هذه المجموعة.
فتح الحزمة
k this deck
69
A ____ breaks a complex task into a series of subtasks.

A) WBS
B) PERT diagram
C) legend
D) Gantt chart
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 175 في هذه المجموعة.
فتح الحزمة
k this deck
70
A(n) ____ is a filing cabinet, disk, or tape that holds data, in a DFD.

A) data store
B) data flow
C) process
D) external entity
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 175 في هذه المجموعة.
فتح الحزمة
k this deck
71
Which of the following is true about using a programming language as an alternative to buying software?

A) This option does not require development time and expertise.
B) Software features might not exactly match business needs.
C) This option can be used to make a solution tailored to system requirements.
D) This might limit developers on the way they implement some system features.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 175 في هذه المجموعة.
فتح الحزمة
k this deck
72
____ charts are arranged to show which tasks must be completed before subsequent dependent tasks can begin.

A) PERT
B) WBS
C) Gantt
D) Beta
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 175 في هذه المجموعة.
فتح الحزمة
k this deck
73
A ____ processing model is one in which data is processed on a centrally located computer.

A) fundamental
B) super
C) main
D) centralized
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 175 في هذه المجموعة.
فتح الحزمة
k this deck
74
____ is a method for analyzing the time needed to complete each project task.

A) Gantt
B) WBS
C) Pert
D) MRP
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 175 في هذه المجموعة.
فتح الحزمة
k this deck
75
Expert systems can be created with a computer programing language or an expert system ____.

A) index
B) shell
C) matrix
D) roster
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 175 في هذه المجموعة.
فتح الحزمة
k this deck
76
A ____ team is assigned to analyze and development an information system.

A) JAD
B) project
C) mission
D) beta
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 175 في هذه المجموعة.
فتح الحزمة
k this deck
77
In a JAD ____, users and analysts jointly identify problems and look for solutions.

A) session
B) turnkey
C) mission
D) department
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 175 في هذه المجموعة.
فتح الحزمة
k this deck
78
In the PIECES framework, a ____ problem means that an information system does not respond quickly enough to users, or takes too long to complete processing tasks.

A) response
B) processing
C) control
D) performance
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 175 في هذه المجموعة.
فتح الحزمة
k this deck
79
____ software for an information system is usually a series of pre-programmed software modules, supplied by a software developer, consulting company, or value added reseller.

A) Industrial
B) Commercial
C) Mercantile
D) Trade
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 175 في هذه المجموعة.
فتح الحزمة
k this deck
80
The goal of the ____ phase of the SDLC is to produce a list of requirements for a new or revised information system.

A) planning
B) analysis
C) design
D) implementation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 175 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 175 في هذه المجموعة.