Deck 12: Who Uses Construction Drawings

ملء الشاشة (f)
exit full mode
سؤال
Construction plans are issued to one construction company for bidding.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Invided bidding means that only those companies on the _________ can bid on a job.
سؤال
_________ equipment means listing measurments as well as the number and kinds of equipment needed for the job.
سؤال
When a set of construction drawings has been completed, it is presented to the owner for reviw.
سؤال
During construction, the job is inspected by employees of the ____________ to see that work is being done properly.
سؤال
Inspectors for the building construction agencies can _______ construction if work is not proper.
سؤال
A bid bond is usually required for construction projects.
سؤال
The bid bond is used to make sure the technician returns the drawings.
سؤال
During construction of the building, drawings are changed to accommodate the installation of equipment and the changes are made on ________ drawings.
سؤال
Building construction review agencies evaluate the drawings to verify design, materials, and methods.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/10
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 12: Who Uses Construction Drawings
1
Construction plans are issued to one construction company for bidding.
False
2
Invided bidding means that only those companies on the _________ can bid on a job.
bid list
3
_________ equipment means listing measurments as well as the number and kinds of equipment needed for the job.
Taking off
4
When a set of construction drawings has been completed, it is presented to the owner for reviw.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
5
During construction, the job is inspected by employees of the ____________ to see that work is being done properly.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
6
Inspectors for the building construction agencies can _______ construction if work is not proper.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
7
A bid bond is usually required for construction projects.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
8
The bid bond is used to make sure the technician returns the drawings.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
9
During construction of the building, drawings are changed to accommodate the installation of equipment and the changes are made on ________ drawings.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
10
Building construction review agencies evaluate the drawings to verify design, materials, and methods.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.