Deck 20: Organizing a Drawing Sheet

ملء الشاشة (f)
exit full mode
سؤال
A completion log keeps customers informed as to what percentage of the drawings on each sheet has been finished.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Each drawing must have a _______ for identification.

A) title
B) cover
C) design
سؤال
Cluttered and unorganized sheets are hard to read and may cause costly mistakes.
سؤال
Who attends the planning meeting?

A) workers and technicians
B) designers and drafters
C) architect and engineers
سؤال
The most imprortant thing to remember in planning a drawing sheet is that the sheet must be _____________.
سؤال
The size of the job determines the number of sheets of drawings that will be required.
سؤال
The designer and drafter are responsible for relaying information to the technician in a ________, _________, and ___________ mannor.
سؤال
In larger offices, ech designer may be assigned a certain ________ to complete.
سؤال
The last group of plans are the _________.
سؤال
A popular sysem for organizing plans for a project used an ______________ sheet of paper to represent each sheet.

A) 11" x 18"
B) D size print
C) 8 1/2" x 11"
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/10
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 20: Organizing a Drawing Sheet
1
A completion log keeps customers informed as to what percentage of the drawings on each sheet has been finished.
False
2
Each drawing must have a _______ for identification.

A) title
B) cover
C) design
A
3
Cluttered and unorganized sheets are hard to read and may cause costly mistakes.
True
4
Who attends the planning meeting?

A) workers and technicians
B) designers and drafters
C) architect and engineers
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
5
The most imprortant thing to remember in planning a drawing sheet is that the sheet must be _____________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
6
The size of the job determines the number of sheets of drawings that will be required.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
7
The designer and drafter are responsible for relaying information to the technician in a ________, _________, and ___________ mannor.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
8
In larger offices, ech designer may be assigned a certain ________ to complete.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
9
The last group of plans are the _________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
10
A popular sysem for organizing plans for a project used an ______________ sheet of paper to represent each sheet.

A) 11" x 18"
B) D size print
C) 8 1/2" x 11"
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.