Air filters should be replaced at regular intervals or when a restriction indicator shows that the air filter is restricted. Performing this task will prevent:

A) A loss in horsepower.
B) Increased fuel consumption.
C) Shortened engine life.
D) All of the above can be prevented with proper air filter servicing.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Which of the following should not be done when changing the engine fuel filters?

A) Tighten the secondary fuel filter until the rubber gasket makes contact with the filter base; then tighten and additional half turn.
B) Install the primary fuel filter and spin it on, leaving the filter loose.
C) Fill both the primary and secondary filter with fuel before installation.
D) Operate the manual hand pump located on the injection pump until fuel bubbles surround the top of the primary filter.
سؤال
What should be done before draining the engine oil of a refrigeration unit?

A) Warm the engine to operating temperature
B) Ensure you have a drain pan capable of containing all the engine oil
C) Check the engine hour meter to make sure the unit has the required hours
D) All of the above should be performed before draining the engine oil
سؤال
A compressor pump down is performed in order to change the compressor oil. With the unit operating in high speed cool:

A) Front seat the receiver tank outlet valve
B) Front seat the suction service valve
C) Front seat the discharge service valve
D) Front seat the bypass check valve
سؤال
What is the recommended ratio of ethylene glycol based coolant and water for the engine cooling system?

A) 30/70
B) 40/60
C) 50/50
D) 60/40
سؤال
When removing the manifold gauge set with the engine running never:

A) Back seat the discharge service valve
B) Front seat the discharge service valve
C) Open both manifold gauges to bleed refrigerant from the discharge gauge hose into the compressor suction side
D) Back seat the suction service valve
سؤال
When manually recharging a refrigeration system start by performing a proper evacuation and then weigh in the correct amount of refrigerant by:

A) Dispensing vaporous refrigerant into the discharge side of the system
B) Dispensing vaporous refrigerant into the suction side of the system
C) Dispensing liquid refrigerant into the discharge side of the system
D) Dispensing liquid refrigerant into the suction side of the system
سؤال
Before installing a manifold gauge set on a refrigeration unit make sure:

A) The service valves are back seated
B) The service valves are mid seated
C) The service valves are mid seated <strong>Before installing a manifold gauge set on a refrigeration unit make sure:</strong> A) The service valves are back seated B) The service valves are mid seated C) The service valves are mid seated   turn clockwise D) The service valves are front seated <div style=padding-top: 35px> turn clockwise
D) The service valves are front seated
سؤال
Which of the following in not a recommended way to test engine glow plugs?

A) Test amperage of entire glow plug circuit and compare to manufactures specifications.
B) Individually check the resistance of each glow plug and compare to manufactures specifications.
C) Check the voltage delivered to each glow plug and compare to manufactures specifications.
D) Test the amperage of each glow plug individually and compare to manufactures specifications.
سؤال
How often should the refrigeration units cooling system be flushed and replaced?

A) Every year
B) Every 2 years
C) Every 3 years
D) Every 4 years
سؤال
The defrost air switch initiates a defrost cycle buy comparing:

A) The differential air pressure on either side of the condenser fan.
B) The difference in air pressure between the condenser inlet and evaporator outlet.
C) The difference in air pressure between the condenser outlet and evaporator inlet.
D) The differential air pressure in either side of the evaporator coil.
سؤال
What procedure would be used to repair the internal valve of SV2 on a solenoid control system (Carrier)?

A) A compressor pump down
B) A low side pump down
C) A evacuation procedure
D) A refrigerant removal
سؤال
Why is it recommended to evacuate from three points on a solenoid control system (Carrier)?

A) Because the system is larger
B) Because of the discharge check valve
C) Because of the closed SV2 solenoid valve
D) Because of the closed pilot solenoid valve
سؤال
What component initiates the end of the defrost cycle?

A) The defrost air switch.
B) The air restriction indicator.
C) The thermostat.
D) The defrost termination switch.
سؤال
In order to perform refrigerant maintenance on the low side of the refrigeration system you will need to perform a low side pump down. With the unit running in high speed cool:

A) Front seat the receiver tank outlet valve
B) Front seat the suction service valve
C) Front seat the discharge service valve
D) Front seat the bypass check valve
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/15
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 17: Truck Trailer Refrigeration Maintenance Procedures
1
Air filters should be replaced at regular intervals or when a restriction indicator shows that the air filter is restricted. Performing this task will prevent:

A) A loss in horsepower.
B) Increased fuel consumption.
C) Shortened engine life.
D) All of the above can be prevented with proper air filter servicing.
D
2
Which of the following should not be done when changing the engine fuel filters?

A) Tighten the secondary fuel filter until the rubber gasket makes contact with the filter base; then tighten and additional half turn.
B) Install the primary fuel filter and spin it on, leaving the filter loose.
C) Fill both the primary and secondary filter with fuel before installation.
D) Operate the manual hand pump located on the injection pump until fuel bubbles surround the top of the primary filter.
C
3
What should be done before draining the engine oil of a refrigeration unit?

A) Warm the engine to operating temperature
B) Ensure you have a drain pan capable of containing all the engine oil
C) Check the engine hour meter to make sure the unit has the required hours
D) All of the above should be performed before draining the engine oil
D
4
A compressor pump down is performed in order to change the compressor oil. With the unit operating in high speed cool:

A) Front seat the receiver tank outlet valve
B) Front seat the suction service valve
C) Front seat the discharge service valve
D) Front seat the bypass check valve
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
5
What is the recommended ratio of ethylene glycol based coolant and water for the engine cooling system?

A) 30/70
B) 40/60
C) 50/50
D) 60/40
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
6
When removing the manifold gauge set with the engine running never:

A) Back seat the discharge service valve
B) Front seat the discharge service valve
C) Open both manifold gauges to bleed refrigerant from the discharge gauge hose into the compressor suction side
D) Back seat the suction service valve
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
7
When manually recharging a refrigeration system start by performing a proper evacuation and then weigh in the correct amount of refrigerant by:

A) Dispensing vaporous refrigerant into the discharge side of the system
B) Dispensing vaporous refrigerant into the suction side of the system
C) Dispensing liquid refrigerant into the discharge side of the system
D) Dispensing liquid refrigerant into the suction side of the system
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
8
Before installing a manifold gauge set on a refrigeration unit make sure:

A) The service valves are back seated
B) The service valves are mid seated
C) The service valves are mid seated <strong>Before installing a manifold gauge set on a refrigeration unit make sure:</strong> A) The service valves are back seated B) The service valves are mid seated C) The service valves are mid seated   turn clockwise D) The service valves are front seated turn clockwise
D) The service valves are front seated
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
9
Which of the following in not a recommended way to test engine glow plugs?

A) Test amperage of entire glow plug circuit and compare to manufactures specifications.
B) Individually check the resistance of each glow plug and compare to manufactures specifications.
C) Check the voltage delivered to each glow plug and compare to manufactures specifications.
D) Test the amperage of each glow plug individually and compare to manufactures specifications.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
10
How often should the refrigeration units cooling system be flushed and replaced?

A) Every year
B) Every 2 years
C) Every 3 years
D) Every 4 years
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
11
The defrost air switch initiates a defrost cycle buy comparing:

A) The differential air pressure on either side of the condenser fan.
B) The difference in air pressure between the condenser inlet and evaporator outlet.
C) The difference in air pressure between the condenser outlet and evaporator inlet.
D) The differential air pressure in either side of the evaporator coil.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
12
What procedure would be used to repair the internal valve of SV2 on a solenoid control system (Carrier)?

A) A compressor pump down
B) A low side pump down
C) A evacuation procedure
D) A refrigerant removal
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
13
Why is it recommended to evacuate from three points on a solenoid control system (Carrier)?

A) Because the system is larger
B) Because of the discharge check valve
C) Because of the closed SV2 solenoid valve
D) Because of the closed pilot solenoid valve
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
14
What component initiates the end of the defrost cycle?

A) The defrost air switch.
B) The air restriction indicator.
C) The thermostat.
D) The defrost termination switch.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
15
In order to perform refrigerant maintenance on the low side of the refrigeration system you will need to perform a low side pump down. With the unit running in high speed cool:

A) Front seat the receiver tank outlet valve
B) Front seat the suction service valve
C) Front seat the discharge service valve
D) Front seat the bypass check valve
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.