Deck 13: Linear Optimization

ملء الشاشة (f)
exit full mode
سؤال
Use the following information to answer the following question(s), using the SUMPRODUCT function.
Stone Age Surfboards is a small manufacturer of two types of popular high-tide surfboards, the Rockwell and the Limestone models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 15 skilled workers, each of whom works 5 hours per day.The finishing department has 5 workers, who also work a 5-hour shift.Each pair of Rockwell surfboards requires 3 labor hours in the fabrication department and 1.5 labor hours in finishing.The Limestone model requires 4.5 labor-hours in fabrication and 2 labor-hours in finishing.The company operates 6 days a week.It makes a per-unit profit of $60 on the Rockwell model and $75 on the Limestone model.Approximately 4.1 Rockwell models and 8.4 Limestone models are produced per day.
<strong>Use the following information to answer the following question(s), using the SUMPRODUCT function. Stone Age Surfboards is a small manufacturer of two types of popular high-tide surfboards, the Rockwell and the Limestone models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 15 skilled workers, each of whom works 5 hours per day.The finishing department has 5 workers, who also work a 5-hour shift.Each pair of Rockwell surfboards requires 3 labor hours in the fabrication department and 1.5 labor hours in finishing.The Limestone model requires 4.5 labor-hours in fabrication and 2 labor-hours in finishing.The company operates 6 days a week.It makes a per-unit profit of $60 on the Rockwell model and $75 on the Limestone model.Approximately 4.1 Rockwell models and 8.4 Limestone models are produced per day.   What is the total number of hours used for the finishing operation?</strong> A)42.58 B)50.10 C)35.64 D)22.95 <div style=padding-top: 35px>
What is the total number of hours used for the finishing operation?

A)42.58
B)50.10
C)35.64
D)22.95
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Consider the spreadsheet for Stone Age Surfboards provided below.Use this data to answer the following question(s), using the Standard Solver.
Stone Age Surfboards is a small manufacturer of two types of popular low-tide surfboards, the Graystone and the Lava models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 8 skilled workers, each of whom works 9.25 hours per day.The finishing department has 5 workers, each of whom works a 6-hour shift per day.Each pair of Graystone surfboards requires 2.5 labor hours in the fabrication department and 2 labor hours in finishing.The Lava model requires 4.2 labor-hours in fabrication and 3.6 labor-hours in finishing.The company operates 6 days a week.It makes a per unit profit of $40 on the Graystone model and $60 on the Lava model.
<strong>Consider the spreadsheet for Stone Age Surfboards provided below.Use this data to answer the following question(s), using the Standard Solver. Stone Age Surfboards is a small manufacturer of two types of popular low-tide surfboards, the Graystone and the Lava models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 8 skilled workers, each of whom works 9.25 hours per day.The finishing department has 5 workers, each of whom works a 6-hour shift per day.Each pair of Graystone surfboards requires 2.5 labor hours in the fabrication department and 2 labor hours in finishing.The Lava model requires 4.2 labor-hours in fabrication and 3.6 labor-hours in finishing.The company operates 6 days a week.It makes a per unit profit of $40 on the Graystone model and $60 on the Lava model.   What is the Allowable Decrease for Graystone surfboards produced?</strong> A)30.74 B)80.00 C)12.33 D)6)67 <div style=padding-top: 35px>
What is the Allowable Decrease for Graystone surfboards produced?

A)30.74
B)80.00
C)12.33
D)6)67
سؤال
Consider the spreadsheet for Stone Age Surfboards provided below.Use this data to answer the following question(s), using the Standard Solver.
Stone Age Surfboards is a small manufacturer of two types of popular low-tide surfboards, the Graystone and the Lava models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 8 skilled workers, each of whom works 9.25 hours per day.The finishing department has 5 workers, each of whom works a 6-hour shift per day.Each pair of Graystone surfboards requires 2.5 labor hours in the fabrication department and 2 labor hours in finishing.The Lava model requires 4.2 labor-hours in fabrication and 3.6 labor-hours in finishing.The company operates 6 days a week.It makes a per unit profit of $40 on the Graystone model and $60 on the Lava model.
<strong>Consider the spreadsheet for Stone Age Surfboards provided below.Use this data to answer the following question(s), using the Standard Solver. Stone Age Surfboards is a small manufacturer of two types of popular low-tide surfboards, the Graystone and the Lava models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 8 skilled workers, each of whom works 9.25 hours per day.The finishing department has 5 workers, each of whom works a 6-hour shift per day.Each pair of Graystone surfboards requires 2.5 labor hours in the fabrication department and 2 labor hours in finishing.The Lava model requires 4.2 labor-hours in fabrication and 3.6 labor-hours in finishing.The company operates 6 days a week.It makes a per unit profit of $40 on the Graystone model and $60 on the Lava model.   What is the Allowable Increase for Lava surfboards produced?</strong> A)30 B)24 C)12 D)18 <div style=padding-top: 35px>
What is the Allowable Increase for Lava surfboards produced?

A)30
B)24
C)12
D)18
سؤال
Consider the spreadsheet for Stone Age Surfboards provided below.Use this data to answer the following question(s), using the Standard Solver.
Stone Age Surfboards is a small manufacturer of two types of popular low-tide surfboards, the Graystone and the Lava models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 8 skilled workers, each of whom works 9.25 hours per day.The finishing department has 5 workers, each of whom works a 6-hour shift per day.Each pair of Graystone surfboards requires 2.5 labor hours in the fabrication department and 2 labor hours in finishing.The Lava model requires 4.2 labor-hours in fabrication and 3.6 labor-hours in finishing.The company operates 6 days a week.It makes a per unit profit of $40 on the Graystone model and $60 on the Lava model.
<strong>Consider the spreadsheet for Stone Age Surfboards provided below.Use this data to answer the following question(s), using the Standard Solver. Stone Age Surfboards is a small manufacturer of two types of popular low-tide surfboards, the Graystone and the Lava models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 8 skilled workers, each of whom works 9.25 hours per day.The finishing department has 5 workers, each of whom works a 6-hour shift per day.Each pair of Graystone surfboards requires 2.5 labor hours in the fabrication department and 2 labor hours in finishing.The Lava model requires 4.2 labor-hours in fabrication and 3.6 labor-hours in finishing.The company operates 6 days a week.It makes a per unit profit of $40 on the Graystone model and $60 on the Lava model.   If the unit profit on Graystone surfboards is increased by $10, what is the total profit generated?</strong> A)$ 489.13 B)$ 521.74 C)$ 423.91 D)$ 554.35 <div style=padding-top: 35px>
If the unit profit on Graystone surfboards is increased by $10, what is the total profit generated?

A)$ 489.13
B)$ 521.74
C)$ 423.91
D)$ 554.35
سؤال
Consider the spreadsheet for Stone Age Surfboards provided below.Use this data to answer the following question(s), using the Standard Solver.
Stone Age Surfboards is a small manufacturer of two types of popular low-tide surfboards, the Graystone and the Lava models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 8 skilled workers, each of whom works 9.25 hours per day.The finishing department has 5 workers, each of whom works a 6-hour shift per day.Each pair of Graystone surfboards requires 2.5 labor hours in the fabrication department and 2 labor hours in finishing.The Lava model requires 4.2 labor-hours in fabrication and 3.6 labor-hours in finishing.The company operates 6 days a week.It makes a per unit profit of $40 on the Graystone model and $60 on the Lava model.
<strong>Consider the spreadsheet for Stone Age Surfboards provided below.Use this data to answer the following question(s), using the Standard Solver. Stone Age Surfboards is a small manufacturer of two types of popular low-tide surfboards, the Graystone and the Lava models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 8 skilled workers, each of whom works 9.25 hours per day.The finishing department has 5 workers, each of whom works a 6-hour shift per day.Each pair of Graystone surfboards requires 2.5 labor hours in the fabrication department and 2 labor hours in finishing.The Lava model requires 4.2 labor-hours in fabrication and 3.6 labor-hours in finishing.The company operates 6 days a week.It makes a per unit profit of $40 on the Graystone model and $60 on the Lava model.   What is the Allowable Decrease in the fabrication hours used?</strong> A)26.84 B)16.67 C)8)33 D)38.46 <div style=padding-top: 35px>
What is the Allowable Decrease in the fabrication hours used?

A)26.84
B)16.67
C)8)33
D)38.46
سؤال
Use the following information to answer the following question(s), using the SUMPRODUCT function.
Stone Age Surfboards is a small manufacturer of two types of popular high-tide surfboards, the Rockwell and the Limestone models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 15 skilled workers, each of whom works 5 hours per day.The finishing department has 5 workers, who also work a 5-hour shift.Each pair of Rockwell surfboards requires 3 labor hours in the fabrication department and 1.5 labor hours in finishing.The Limestone model requires 4.5 labor-hours in fabrication and 2 labor-hours in finishing.The company operates 6 days a week.It makes a per-unit profit of $60 on the Rockwell model and $75 on the Limestone model.Approximately 4.1 Rockwell models and 8.4 Limestone models are produced per day.
<strong>Use the following information to answer the following question(s), using the SUMPRODUCT function. Stone Age Surfboards is a small manufacturer of two types of popular high-tide surfboards, the Rockwell and the Limestone models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 15 skilled workers, each of whom works 5 hours per day.The finishing department has 5 workers, who also work a 5-hour shift.Each pair of Rockwell surfboards requires 3 labor hours in the fabrication department and 1.5 labor hours in finishing.The Limestone model requires 4.5 labor-hours in fabrication and 2 labor-hours in finishing.The company operates 6 days a week.It makes a per-unit profit of $60 on the Rockwell model and $75 on the Limestone model.Approximately 4.1 Rockwell models and 8.4 Limestone models are produced per day.   What is the total number of hours used for fabrication?</strong> A)42.58 B)50.10 C)35.64 D)22.95 <div style=padding-top: 35px>
What is the total number of hours used for fabrication?

A)42.58
B)50.10
C)35.64
D)22.95
سؤال
Which of the following best defines decision variables in an optimization model?

A)They are limitations, requirements, or other restrictions that are imposed on any solution.
B)They are the quantities that the model seeks to maximize or minimize.
C)They are quantities for which no feasible solutions exist.
D)They are unknown values that the model seeks to determine.
سؤال
Consider the spreadsheet for Stone Age Surfboards provided below.Use this data to answer the following question(s), using the Standard Solver.
Stone Age Surfboards is a small manufacturer of two types of popular low-tide surfboards, the Graystone and the Lava models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 8 skilled workers, each of whom works 9.25 hours per day.The finishing department has 5 workers, each of whom works a 6-hour shift per day.Each pair of Graystone surfboards requires 2.5 labor hours in the fabrication department and 2 labor hours in finishing.The Lava model requires 4.2 labor-hours in fabrication and 3.6 labor-hours in finishing.The company operates 6 days a week.It makes a per unit profit of $40 on the Graystone model and $60 on the Lava model.
<strong>Consider the spreadsheet for Stone Age Surfboards provided below.Use this data to answer the following question(s), using the Standard Solver. Stone Age Surfboards is a small manufacturer of two types of popular low-tide surfboards, the Graystone and the Lava models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 8 skilled workers, each of whom works 9.25 hours per day.The finishing department has 5 workers, each of whom works a 6-hour shift per day.Each pair of Graystone surfboards requires 2.5 labor hours in the fabrication department and 2 labor hours in finishing.The Lava model requires 4.2 labor-hours in fabrication and 3.6 labor-hours in finishing.The company operates 6 days a week.It makes a per unit profit of $40 on the Graystone model and $60 on the Lava model.   What is the value of slack obtained from the answer report?</strong> A)46.78 B)38.46 C)59.24 D)23.85 <div style=padding-top: 35px>
What is the value of slack obtained from the answer report?

A)46.78
B)38.46
C)59.24
D)23.85
سؤال
Consider the spreadsheet for Stone Age Surfboards provided below.Use this data to answer the following question(s), using the Standard Solver.
Stone Age Surfboards is a small manufacturer of two types of popular low-tide surfboards, the Graystone and the Lava models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 8 skilled workers, each of whom works 9.25 hours per day.The finishing department has 5 workers, each of whom works a 6-hour shift per day.Each pair of Graystone surfboards requires 2.5 labor hours in the fabrication department and 2 labor hours in finishing.The Lava model requires 4.2 labor-hours in fabrication and 3.6 labor-hours in finishing.The company operates 6 days a week.It makes a per unit profit of $40 on the Graystone model and $60 on the Lava model.
<strong>Consider the spreadsheet for Stone Age Surfboards provided below.Use this data to answer the following question(s), using the Standard Solver. Stone Age Surfboards is a small manufacturer of two types of popular low-tide surfboards, the Graystone and the Lava models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 8 skilled workers, each of whom works 9.25 hours per day.The finishing department has 5 workers, each of whom works a 6-hour shift per day.Each pair of Graystone surfboards requires 2.5 labor hours in the fabrication department and 2 labor hours in finishing.The Lava model requires 4.2 labor-hours in fabrication and 3.6 labor-hours in finishing.The company operates 6 days a week.It makes a per unit profit of $40 on the Graystone model and $60 on the Lava model.   What is the Allowable Increase in the finishing hours used?</strong> A)32.46 B)8)33 C)26.84 D)16.67 <div style=padding-top: 35px>
What is the Allowable Increase in the finishing hours used?

A)32.46
B)8)33
C)26.84
D)16.67
سؤال
Consider the spreadsheet for Stone Age Surfboards provided below.Use this data to answer the following question(s), using the Standard Solver.
Stone Age Surfboards is a small manufacturer of two types of popular low-tide surfboards, the Graystone and the Lava models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 8 skilled workers, each of whom works 9.25 hours per day.The finishing department has 5 workers, each of whom works a 6-hour shift per day.Each pair of Graystone surfboards requires 2.5 labor hours in the fabrication department and 2 labor hours in finishing.The Lava model requires 4.2 labor-hours in fabrication and 3.6 labor-hours in finishing.The company operates 6 days a week.It makes a per unit profit of $40 on the Graystone model and $60 on the Lava model.
<strong>Consider the spreadsheet for Stone Age Surfboards provided below.Use this data to answer the following question(s), using the Standard Solver. Stone Age Surfboards is a small manufacturer of two types of popular low-tide surfboards, the Graystone and the Lava models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 8 skilled workers, each of whom works 9.25 hours per day.The finishing department has 5 workers, each of whom works a 6-hour shift per day.Each pair of Graystone surfboards requires 2.5 labor hours in the fabrication department and 2 labor hours in finishing.The Lava model requires 4.2 labor-hours in fabrication and 3.6 labor-hours in finishing.The company operates 6 days a week.It makes a per unit profit of $40 on the Graystone model and $60 on the Lava model.   What will be the total profit contribution from Graystone surfboards?</strong> A)$ 391.30 B)$ 521.74 C)$ 130.43 D)$ 276.65 <div style=padding-top: 35px>
What will be the total profit contribution from Graystone surfboards?

A)$ 391.30
B)$ 521.74
C)$ 130.43
D)$ 276.65
سؤال
Which of the following best defines constraints in an optimization problem?

A)They are limitations, requirements, or other restrictions that are imposed on any solution.
B)They are quantities that an optimization model seeks to maximize or minimize.
C)They are quantities for which no feasible solutions exist.
D)They are unknown values that the model seeks to determine.
سؤال
Use the following information to answer the following question(s), using the SUMPRODUCT function.
Stone Age Surfboards is a small manufacturer of two types of popular high-tide surfboards, the Rockwell and the Limestone models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 15 skilled workers, each of whom works 5 hours per day.The finishing department has 5 workers, who also work a 5-hour shift.Each pair of Rockwell surfboards requires 3 labor hours in the fabrication department and 1.5 labor hours in finishing.The Limestone model requires 4.5 labor-hours in fabrication and 2 labor-hours in finishing.The company operates 6 days a week.It makes a per-unit profit of $60 on the Rockwell model and $75 on the Limestone model.Approximately 4.1 Rockwell models and 8.4 Limestone models are produced per day.
<strong>Use the following information to answer the following question(s), using the SUMPRODUCT function. Stone Age Surfboards is a small manufacturer of two types of popular high-tide surfboards, the Rockwell and the Limestone models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 15 skilled workers, each of whom works 5 hours per day.The finishing department has 5 workers, who also work a 5-hour shift.Each pair of Rockwell surfboards requires 3 labor hours in the fabrication department and 1.5 labor hours in finishing.The Limestone model requires 4.5 labor-hours in fabrication and 2 labor-hours in finishing.The company operates 6 days a week.It makes a per-unit profit of $60 on the Rockwell model and $75 on the Limestone model.Approximately 4.1 Rockwell models and 8.4 Limestone models are produced per day.   What is the total profit generated?</strong> A)$ 876.00 B)$ 675.50 C)$ 480.50 D)$ 965.00 <div style=padding-top: 35px>
What is the total profit generated?

A)$ 876.00
B)$ 675.50
C)$ 480.50
D)$ 965.00
سؤال
Consider the spreadsheet for Stone Age Surfboards provided below.Use this data to answer the following question(s), using the Standard Solver.
Stone Age Surfboards is a small manufacturer of two types of popular low-tide surfboards, the Graystone and the Lava models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 8 skilled workers, each of whom works 9.25 hours per day.The finishing department has 5 workers, each of whom works a 6-hour shift per day.Each pair of Graystone surfboards requires 2.5 labor hours in the fabrication department and 2 labor hours in finishing.The Lava model requires 4.2 labor-hours in fabrication and 3.6 labor-hours in finishing.The company operates 6 days a week.It makes a per unit profit of $40 on the Graystone model and $60 on the Lava model.
<strong>Consider the spreadsheet for Stone Age Surfboards provided below.Use this data to answer the following question(s), using the Standard Solver. Stone Age Surfboards is a small manufacturer of two types of popular low-tide surfboards, the Graystone and the Lava models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 8 skilled workers, each of whom works 9.25 hours per day.The finishing department has 5 workers, each of whom works a 6-hour shift per day.Each pair of Graystone surfboards requires 2.5 labor hours in the fabrication department and 2 labor hours in finishing.The Lava model requires 4.2 labor-hours in fabrication and 3.6 labor-hours in finishing.The company operates 6 days a week.It makes a per unit profit of $40 on the Graystone model and $60 on the Lava model.   What is the total number of hours used for fabrication?</strong> A)54.5 B)30.0 C)35.5 D)43.8 <div style=padding-top: 35px>
What is the total number of hours used for fabrication?

A)54.5
B)30.0
C)35.5
D)43.8
سؤال
Consider the spreadsheet for Stone Age Surfboards provided below.Use this data to answer the following question(s), using the Standard Solver.
Stone Age Surfboards is a small manufacturer of two types of popular low-tide surfboards, the Graystone and the Lava models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 8 skilled workers, each of whom works 9.25 hours per day.The finishing department has 5 workers, each of whom works a 6-hour shift per day.Each pair of Graystone surfboards requires 2.5 labor hours in the fabrication department and 2 labor hours in finishing.The Lava model requires 4.2 labor-hours in fabrication and 3.6 labor-hours in finishing.The company operates 6 days a week.It makes a per unit profit of $40 on the Graystone model and $60 on the Lava model.
<strong>Consider the spreadsheet for Stone Age Surfboards provided below.Use this data to answer the following question(s), using the Standard Solver. Stone Age Surfboards is a small manufacturer of two types of popular low-tide surfboards, the Graystone and the Lava models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 8 skilled workers, each of whom works 9.25 hours per day.The finishing department has 5 workers, each of whom works a 6-hour shift per day.Each pair of Graystone surfboards requires 2.5 labor hours in the fabrication department and 2 labor hours in finishing.The Lava model requires 4.2 labor-hours in fabrication and 3.6 labor-hours in finishing.The company operates 6 days a week.It makes a per unit profit of $40 on the Graystone model and $60 on the Lava model.   If the unit profit on Graystone surfboards is increased by $10, what is the Allowable Decrease for Lava surfboards?</strong> A)30.00 B)85.00 C)16.67 D)58.75 <div style=padding-top: 35px>
If the unit profit on Graystone surfboards is increased by $10, what is the Allowable Decrease for Lava surfboards?

A)30.00
B)85.00
C)16.67
D)58.75
سؤال
Consider the spreadsheet for Stone Age Surfboards provided below.Use this data to answer the following question(s), using the Standard Solver.
Stone Age Surfboards is a small manufacturer of two types of popular low-tide surfboards, the Graystone and the Lava models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 8 skilled workers, each of whom works 9.25 hours per day.The finishing department has 5 workers, each of whom works a 6-hour shift per day.Each pair of Graystone surfboards requires 2.5 labor hours in the fabrication department and 2 labor hours in finishing.The Lava model requires 4.2 labor-hours in fabrication and 3.6 labor-hours in finishing.The company operates 6 days a week.It makes a per unit profit of $40 on the Graystone model and $60 on the Lava model.
<strong>Consider the spreadsheet for Stone Age Surfboards provided below.Use this data to answer the following question(s), using the Standard Solver. Stone Age Surfboards is a small manufacturer of two types of popular low-tide surfboards, the Graystone and the Lava models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 8 skilled workers, each of whom works 9.25 hours per day.The finishing department has 5 workers, each of whom works a 6-hour shift per day.Each pair of Graystone surfboards requires 2.5 labor hours in the fabrication department and 2 labor hours in finishing.The Lava model requires 4.2 labor-hours in fabrication and 3.6 labor-hours in finishing.The company operates 6 days a week.It makes a per unit profit of $40 on the Graystone model and $60 on the Lava model.   What is the total profit generated?</strong> A)$ 675.68 B)$ 920.57 C)$ 521.74 D)$ 788.32 <div style=padding-top: 35px>
What is the total profit generated?

A)$ 675.68
B)$ 920.57
C)$ 521.74
D)$ 788.32
سؤال
Consider the spreadsheet for Stone Age Surfboards provided below.Use this data to answer the following question(s), using the Standard Solver.
Stone Age Surfboards is a small manufacturer of two types of popular low-tide surfboards, the Graystone and the Lava models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 8 skilled workers, each of whom works 9.25 hours per day.The finishing department has 5 workers, each of whom works a 6-hour shift per day.Each pair of Graystone surfboards requires 2.5 labor hours in the fabrication department and 2 labor hours in finishing.The Lava model requires 4.2 labor-hours in fabrication and 3.6 labor-hours in finishing.The company operates 6 days a week.It makes a per unit profit of $40 on the Graystone model and $60 on the Lava model.
<strong>Consider the spreadsheet for Stone Age Surfboards provided below.Use this data to answer the following question(s), using the Standard Solver. Stone Age Surfboards is a small manufacturer of two types of popular low-tide surfboards, the Graystone and the Lava models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 8 skilled workers, each of whom works 9.25 hours per day.The finishing department has 5 workers, each of whom works a 6-hour shift per day.Each pair of Graystone surfboards requires 2.5 labor hours in the fabrication department and 2 labor hours in finishing.The Lava model requires 4.2 labor-hours in fabrication and 3.6 labor-hours in finishing.The company operates 6 days a week.It makes a per unit profit of $40 on the Graystone model and $60 on the Lava model.   What is the total number of hours used for the finishing operation?</strong> A)18.7 B)30.0 C)35.5 D)24.2 <div style=padding-top: 35px>
What is the total number of hours used for the finishing operation?

A)18.7
B)30.0
C)35.5
D)24.2
سؤال
Consider the spreadsheet for Stone Age Surfboards provided below.Use this data to answer the following question(s), using the Standard Solver.
Stone Age Surfboards is a small manufacturer of two types of popular low-tide surfboards, the Graystone and the Lava models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 8 skilled workers, each of whom works 9.25 hours per day.The finishing department has 5 workers, each of whom works a 6-hour shift per day.Each pair of Graystone surfboards requires 2.5 labor hours in the fabrication department and 2 labor hours in finishing.The Lava model requires 4.2 labor-hours in fabrication and 3.6 labor-hours in finishing.The company operates 6 days a week.It makes a per unit profit of $40 on the Graystone model and $60 on the Lava model.
<strong>Consider the spreadsheet for Stone Age Surfboards provided below.Use this data to answer the following question(s), using the Standard Solver. Stone Age Surfboards is a small manufacturer of two types of popular low-tide surfboards, the Graystone and the Lava models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 8 skilled workers, each of whom works 9.25 hours per day.The finishing department has 5 workers, each of whom works a 6-hour shift per day.Each pair of Graystone surfboards requires 2.5 labor hours in the fabrication department and 2 labor hours in finishing.The Lava model requires 4.2 labor-hours in fabrication and 3.6 labor-hours in finishing.The company operates 6 days a week.It makes a per unit profit of $40 on the Graystone model and $60 on the Lava model.   What will be the total profit contribution from Lava surfboards?</strong> A)$ 391.30 B)$ 521.74 C)$ 130.43 D)$ 276.65 <div style=padding-top: 35px>
What will be the total profit contribution from Lava surfboards?

A)$ 391.30
B)$ 521.74
C)$ 130.43
D)$ 276.65
سؤال
Consider the spreadsheet for Stone Age Surfboards provided below.Use this data to answer the following question(s), using the Standard Solver.
Stone Age Surfboards is a small manufacturer of two types of popular low-tide surfboards, the Graystone and the Lava models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 8 skilled workers, each of whom works 9.25 hours per day.The finishing department has 5 workers, each of whom works a 6-hour shift per day.Each pair of Graystone surfboards requires 2.5 labor hours in the fabrication department and 2 labor hours in finishing.The Lava model requires 4.2 labor-hours in fabrication and 3.6 labor-hours in finishing.The company operates 6 days a week.It makes a per unit profit of $40 on the Graystone model and $60 on the Lava model.
<strong>Consider the spreadsheet for Stone Age Surfboards provided below.Use this data to answer the following question(s), using the Standard Solver. Stone Age Surfboards is a small manufacturer of two types of popular low-tide surfboards, the Graystone and the Lava models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 8 skilled workers, each of whom works 9.25 hours per day.The finishing department has 5 workers, each of whom works a 6-hour shift per day.Each pair of Graystone surfboards requires 2.5 labor hours in the fabrication department and 2 labor hours in finishing.The Lava model requires 4.2 labor-hours in fabrication and 3.6 labor-hours in finishing.The company operates 6 days a week.It makes a per unit profit of $40 on the Graystone model and $60 on the Lava model.   If the unit profit on Graystone surfboards is increased by $10, what is the Allowable Increase for Lava surfboards?</strong> A)30.00 B)85.00 C)16.67 D)58.75 <div style=padding-top: 35px>
If the unit profit on Graystone surfboards is increased by $10, what is the Allowable Increase for Lava surfboards?

A)30.00
B)85.00
C)16.67
D)58.75
سؤال
Consider the spreadsheet for Stone Age Surfboards provided below.Use this data to answer the following question(s), using the Standard Solver.
Stone Age Surfboards is a small manufacturer of two types of popular low-tide surfboards, the Graystone and the Lava models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 8 skilled workers, each of whom works 9.25 hours per day.The finishing department has 5 workers, each of whom works a 6-hour shift per day.Each pair of Graystone surfboards requires 2.5 labor hours in the fabrication department and 2 labor hours in finishing.The Lava model requires 4.2 labor-hours in fabrication and 3.6 labor-hours in finishing.The company operates 6 days a week.It makes a per unit profit of $40 on the Graystone model and $60 on the Lava model.
<strong>Consider the spreadsheet for Stone Age Surfboards provided below.Use this data to answer the following question(s), using the Standard Solver. Stone Age Surfboards is a small manufacturer of two types of popular low-tide surfboards, the Graystone and the Lava models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 8 skilled workers, each of whom works 9.25 hours per day.The finishing department has 5 workers, each of whom works a 6-hour shift per day.Each pair of Graystone surfboards requires 2.5 labor hours in the fabrication department and 2 labor hours in finishing.The Lava model requires 4.2 labor-hours in fabrication and 3.6 labor-hours in finishing.The company operates 6 days a week.It makes a per unit profit of $40 on the Graystone model and $60 on the Lava model.   What is the shadow price for the finishing hours used?</strong> A)32.46 B)17.39 C)8)33 D)6)67 <div style=padding-top: 35px>
What is the shadow price for the finishing hours used?

A)32.46
B)17.39
C)8)33
D)6)67
سؤال
Which of the following best defines objective functions?

A)They are limitations, requirements, or other restrictions that are imposed on any solution in an optimization model.
B)They are quantities that an optimization model seeks to maximize or minimize.
C)They are quantities for which no feasible solutions exist in an optimization model.
D)They are unknown values that an optimization model seeks to determine.
سؤال
An infeasible problem is one for which ________.

A)the objective is maximized or minimized by more than one combination of decision variables
B)there is no solution that simultaneously satisfies all the constraints
C)the objective can be increased or decreased to infinity or negative infinity
D)there is exactly one solution that will result in the maximum or minimum objective
سؤال
Consider the spreadsheet for Stone Age Surfboards provided below.Use this data to answer the following question(s), using the Standard Solver.
Stone Age Surfboards is a small manufacturer of two types of popular low-tide surfboards, the Graystone and the Lava models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 8 skilled workers, each of whom works 9.25 hours per day.The finishing department has 5 workers, each of whom works a 6-hour shift per day.Each pair of Graystone surfboards requires 2.5 labor hours in the fabrication department and 2 labor hours in finishing.The Lava model requires 4.2 labor-hours in fabrication and 3.6 labor-hours in finishing.The company operates 6 days a week.It makes a per unit profit of $40 on the Graystone model and $60 on the Lava model.
<strong>Consider the spreadsheet for Stone Age Surfboards provided below.Use this data to answer the following question(s), using the Standard Solver. Stone Age Surfboards is a small manufacturer of two types of popular low-tide surfboards, the Graystone and the Lava models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 8 skilled workers, each of whom works 9.25 hours per day.The finishing department has 5 workers, each of whom works a 6-hour shift per day.Each pair of Graystone surfboards requires 2.5 labor hours in the fabrication department and 2 labor hours in finishing.The Lava model requires 4.2 labor-hours in fabrication and 3.6 labor-hours in finishing.The company operates 6 days a week.It makes a per unit profit of $40 on the Graystone model and $60 on the Lava model.   Due to decreasing profits, if the production of Graystone surfboards is stopped, compute the total profit the firm can earn.</strong> A)$ 521.74 B)$ 489.13 C)$ 423.91 D)$ 456.52 <div style=padding-top: 35px>
Due to decreasing profits, if the production of Graystone surfboards is stopped, compute the total profit the firm can earn.

A)$ 521.74
B)$ 489.13
C)$ 423.91
D)$ 456.52
سؤال
If a model has alternative optimal solutions, ________.

A)the objective is maximized or minimized by more than one combination of decision variables
B)there is no solution that simultaneously satisfies all the constraints
C)the objective can be increased or decreased to infinity or negative infinity
D)there is exactly one solution that will result in the maximum or minimum objective
سؤال
Use the following information to answer the question(s)below.
Cerebro Manufacturing produces four types of structural support fittings-plugs, rails, rivets, and clips-which are machined on two CNC machining centers.The machining centers have a capacity of 250,000 minutes per year.The gross margin per unit and machining requirements are shown in the spreadsheet below.
<strong>Use the following information to answer the question(s)below. Cerebro Manufacturing produces four types of structural support fittings-plugs, rails, rivets, and clips-which are machined on two CNC machining centers.The machining centers have a capacity of 250,000 minutes per year.The gross margin per unit and machining requirements are shown in the spreadsheet below.   What is the total profit generated from the manufacture of only plugs?</strong> A)$ 66,666.67 B)$ 100,000.00 C)$ 183,333.33 D)$ 150,000.00 <div style=padding-top: 35px>
What is the total profit generated from the manufacture of only plugs?

A)$ 66,666.67
B)$ 100,000.00
C)$ 183,333.33
D)$ 150,000.00
سؤال
When a model has a unique optimal solution, it means that ________.

A)the objective is maximized or minimized by more than one combination of decision variables
B)there is no solution that simultaneously satisfies all the constraints
C)the Allowable Increase or Allowable Decrease values for changing cells are zero
D)there is exactly one solution that will result in the maximum or minimum objective
سؤال
Use the following information to answer the question(s)below.
Cerebro Manufacturing produces four types of structural support fittings-plugs, rails, rivets, and clips-which are machined on two CNC machining centers.The machining centers have a capacity of 250,000 minutes per year.The gross margin per unit and machining requirements are shown in the spreadsheet below.
<strong>Use the following information to answer the question(s)below. Cerebro Manufacturing produces four types of structural support fittings-plugs, rails, rivets, and clips-which are machined on two CNC machining centers.The machining centers have a capacity of 250,000 minutes per year.The gross margin per unit and machining requirements are shown in the spreadsheet below.   What is the maximum production of clips based on the machine capacity?</strong> A)250,000.00 B)83,333.33 C)166,666.67 D)125,000.00 <div style=padding-top: 35px>
What is the maximum production of clips based on the machine capacity?

A)250,000.00
B)83,333.33
C)166,666.67
D)125,000.00
سؤال
An unbounded problem is one for which ________.

A)the objective is maximized or minimized by more than one combination of decision variables
B)there is no solution that simultaneously satisfies all the constraints
C)the objective can be increased or decreased to infinity or negative infinity while the solution remains feasible
D)there is exactly one solution that will result in the maximum or minimum objective
سؤال
Consider the spreadsheet for Stone Age Surfboards provided below.Use this data to answer the following question(s), using the Standard Solver.
Stone Age Surfboards is a small manufacturer of two types of popular low-tide surfboards, the Graystone and the Lava models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 8 skilled workers, each of whom works 9.25 hours per day.The finishing department has 5 workers, each of whom works a 6-hour shift per day.Each pair of Graystone surfboards requires 2.5 labor hours in the fabrication department and 2 labor hours in finishing.The Lava model requires 4.2 labor-hours in fabrication and 3.6 labor-hours in finishing.The company operates 6 days a week.It makes a per unit profit of $40 on the Graystone model and $60 on the Lava model.
<strong>Consider the spreadsheet for Stone Age Surfboards provided below.Use this data to answer the following question(s), using the Standard Solver. Stone Age Surfboards is a small manufacturer of two types of popular low-tide surfboards, the Graystone and the Lava models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 8 skilled workers, each of whom works 9.25 hours per day.The finishing department has 5 workers, each of whom works a 6-hour shift per day.Each pair of Graystone surfboards requires 2.5 labor hours in the fabrication department and 2 labor hours in finishing.The Lava model requires 4.2 labor-hours in fabrication and 3.6 labor-hours in finishing.The company operates 6 days a week.It makes a per unit profit of $40 on the Graystone model and $60 on the Lava model.   If the unit profit on both Graystone and Lava surfboards is increased by $10, what is the shadow price for the finishing hours used?</strong> A)-4.35 B)8)33 C)20.65 D)32.46 <div style=padding-top: 35px>
If the unit profit on both Graystone and Lava surfboards is increased by $10, what is the shadow price for the finishing hours used?

A)-4.35
B)8)33
C)20.65
D)32.46
سؤال
Use the following information to answer the question(s)below.
Cerebro Manufacturing produces four types of structural support fittings-plugs, rails, rivets, and clips-which are machined on two CNC machining centers.The machining centers have a capacity of 250,000 minutes per year.The gross margin per unit and machining requirements are shown in the spreadsheet below.
<strong>Use the following information to answer the question(s)below. Cerebro Manufacturing produces four types of structural support fittings-plugs, rails, rivets, and clips-which are machined on two CNC machining centers.The machining centers have a capacity of 250,000 minutes per year.The gross margin per unit and machining requirements are shown in the spreadsheet below.   Which of the following options is used if Solver gives an error message that linearity is not satisfied?</strong> A)Ignore Integer Constraints B)Show Iteration Results C)Use Automatic Scaling D)Use Multistart <div style=padding-top: 35px>
Which of the following options is used if Solver gives an error message that linearity is not satisfied?

A)Ignore Integer Constraints
B)Show Iteration Results
C)Use Automatic Scaling
D)Use Multistart
سؤال
Use the following information to answer the question(s)below.
Cerebro Manufacturing produces four types of structural support fittings-plugs, rails, rivets, and clips-which are machined on two CNC machining centers.The machining centers have a capacity of 250,000 minutes per year.The gross margin per unit and machining requirements are shown in the spreadsheet below.
<strong>Use the following information to answer the question(s)below. Cerebro Manufacturing produces four types of structural support fittings-plugs, rails, rivets, and clips-which are machined on two CNC machining centers.The machining centers have a capacity of 250,000 minutes per year.The gross margin per unit and machining requirements are shown in the spreadsheet below.   What is the gross margin per minute of plugs manufactured?</strong> A)$ 0.60 B)$ 0.73 C)$ 0.40 D)$ 0.27 <div style=padding-top: 35px>
What is the gross margin per minute of plugs manufactured?

A)$ 0.60
B)$ 0.73
C)$ 0.40
D)$ 0.27
سؤال
Use the following information to answer the question(s)below.
Cerebro Manufacturing produces four types of structural support fittings-plugs, rails, rivets, and clips-which are machined on two CNC machining centers.The machining centers have a capacity of 250,000 minutes per year.The gross margin per unit and machining requirements are shown in the spreadsheet below.
<strong>Use the following information to answer the question(s)below. Cerebro Manufacturing produces four types of structural support fittings-plugs, rails, rivets, and clips-which are machined on two CNC machining centers.The machining centers have a capacity of 250,000 minutes per year.The gross margin per unit and machining requirements are shown in the spreadsheet below.   What is the gross margin per minute of rivets manufactured?</strong> A)$ 0.60 B)$ 0.73 C)$ 0.40 D)$ 0.27 <div style=padding-top: 35px>
What is the gross margin per minute of rivets manufactured?

A)$ 0.60
B)$ 0.73
C)$ 0.40
D)$ 0.27
سؤال
Which of the following solving methods is selected in the Solver dialog for linear and linear integer optimization problems?

A)GRG Nonlinear
B)Simplex LP
C)SOCP Barrier Engine
D)Evolutionary
سؤال
Use the following information to answer the question(s)below.
Cerebro Manufacturing produces four types of structural support fittings-plugs, rails, rivets, and clips-which are machined on two CNC machining centers.The machining centers have a capacity of 250,000 minutes per year.The gross margin per unit and machining requirements are shown in the spreadsheet below.
<strong>Use the following information to answer the question(s)below. Cerebro Manufacturing produces four types of structural support fittings-plugs, rails, rivets, and clips-which are machined on two CNC machining centers.The machining centers have a capacity of 250,000 minutes per year.The gross margin per unit and machining requirements are shown in the spreadsheet below.   What is the total profit generated from the manufacture of rivets?</strong> A)$ 66,666.67 B)$ 100,000.00 C)$ 183,333.33 D)$ 150,000.00 <div style=padding-top: 35px>
What is the total profit generated from the manufacture of rivets?

A)$ 66,666.67
B)$ 100,000.00
C)$ 183,333.33
D)$ 150,000.00
سؤال
Consider the spreadsheet for Stone Age Surfboards provided below.Use this data to answer the following question(s), using the Standard Solver.
Stone Age Surfboards is a small manufacturer of two types of popular low-tide surfboards, the Graystone and the Lava models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 8 skilled workers, each of whom works 9.25 hours per day.The finishing department has 5 workers, each of whom works a 6-hour shift per day.Each pair of Graystone surfboards requires 2.5 labor hours in the fabrication department and 2 labor hours in finishing.The Lava model requires 4.2 labor-hours in fabrication and 3.6 labor-hours in finishing.The company operates 6 days a week.It makes a per unit profit of $40 on the Graystone model and $60 on the Lava model.
<strong>Consider the spreadsheet for Stone Age Surfboards provided below.Use this data to answer the following question(s), using the Standard Solver. Stone Age Surfboards is a small manufacturer of two types of popular low-tide surfboards, the Graystone and the Lava models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 8 skilled workers, each of whom works 9.25 hours per day.The finishing department has 5 workers, each of whom works a 6-hour shift per day.Each pair of Graystone surfboards requires 2.5 labor hours in the fabrication department and 2 labor hours in finishing.The Lava model requires 4.2 labor-hours in fabrication and 3.6 labor-hours in finishing.The company operates 6 days a week.It makes a per unit profit of $40 on the Graystone model and $60 on the Lava model.   If the unit profit on Graystone surfboards is increased by $10, what is the shadow price for the finishing hours used?</strong> A)18.48 B)17.39 C)15.42 D)14.15 <div style=padding-top: 35px>
If the unit profit on Graystone surfboards is increased by $10, what is the shadow price for the finishing hours used?

A)18.48
B)17.39
C)15.42
D)14.15
سؤال
Consider the spreadsheet for Stone Age Surfboards provided below.Use this data to answer the following question(s), using the Standard Solver.
Stone Age Surfboards is a small manufacturer of two types of popular low-tide surfboards, the Graystone and the Lava models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 8 skilled workers, each of whom works 9.25 hours per day.The finishing department has 5 workers, each of whom works a 6-hour shift per day.Each pair of Graystone surfboards requires 2.5 labor hours in the fabrication department and 2 labor hours in finishing.The Lava model requires 4.2 labor-hours in fabrication and 3.6 labor-hours in finishing.The company operates 6 days a week.It makes a per unit profit of $40 on the Graystone model and $60 on the Lava model.
<strong>Consider the spreadsheet for Stone Age Surfboards provided below.Use this data to answer the following question(s), using the Standard Solver. Stone Age Surfboards is a small manufacturer of two types of popular low-tide surfboards, the Graystone and the Lava models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 8 skilled workers, each of whom works 9.25 hours per day.The finishing department has 5 workers, each of whom works a 6-hour shift per day.Each pair of Graystone surfboards requires 2.5 labor hours in the fabrication department and 2 labor hours in finishing.The Lava model requires 4.2 labor-hours in fabrication and 3.6 labor-hours in finishing.The company operates 6 days a week.It makes a per unit profit of $40 on the Graystone model and $60 on the Lava model.   If the unit profit on both Graystone and Lava surfboards is increased by $10, what is the Allowable Decrease for Lava surfboards?</strong> A)95.00 B)38.46 C)20.00 D)11.11 <div style=padding-top: 35px>
If the unit profit on both Graystone and Lava surfboards is increased by $10, what is the Allowable Decrease for Lava surfboards?

A)95.00
B)38.46
C)20.00
D)11.11
سؤال
Which of the following approaches provided by the Risk Solver Platform can automatically run multiple optimizations while varying model parameters within a predefined range?

A)sensitivity analysis
B)breakdown analysis
C)parameter analysis
D)uncertainty analysis
سؤال
Consider the spreadsheet for Stone Age Surfboards provided below.Use this data to answer the following question(s), using the Standard Solver.
Stone Age Surfboards is a small manufacturer of two types of popular low-tide surfboards, the Graystone and the Lava models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 8 skilled workers, each of whom works 9.25 hours per day.The finishing department has 5 workers, each of whom works a 6-hour shift per day.Each pair of Graystone surfboards requires 2.5 labor hours in the fabrication department and 2 labor hours in finishing.The Lava model requires 4.2 labor-hours in fabrication and 3.6 labor-hours in finishing.The company operates 6 days a week.It makes a per unit profit of $40 on the Graystone model and $60 on the Lava model.
<strong>Consider the spreadsheet for Stone Age Surfboards provided below.Use this data to answer the following question(s), using the Standard Solver. Stone Age Surfboards is a small manufacturer of two types of popular low-tide surfboards, the Graystone and the Lava models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 8 skilled workers, each of whom works 9.25 hours per day.The finishing department has 5 workers, each of whom works a 6-hour shift per day.Each pair of Graystone surfboards requires 2.5 labor hours in the fabrication department and 2 labor hours in finishing.The Lava model requires 4.2 labor-hours in fabrication and 3.6 labor-hours in finishing.The company operates 6 days a week.It makes a per unit profit of $40 on the Graystone model and $60 on the Lava model.   If the unit profit on both Graystone and Lava surfboards is increased by $10, what is the total profit generated?</strong> A)$ 521.74 B)$ 505.43 C)$ 423.91 D)$ 619.57 <div style=padding-top: 35px>
If the unit profit on both Graystone and Lava surfboards is increased by $10, what is the total profit generated?

A)$ 521.74
B)$ 505.43
C)$ 423.91
D)$ 619.57
سؤال
Alternate optimal solutions exist when the ________.

A)reduced cost is equal to the shadow price
B)ratio of the objective coefficient to the constraint coefficient is one
C)Allowable Increase values for changing cells are zero
D)final value of the changing cells is greater than that of the constraints
سؤال
Use the following information to answer the question(s)below.
Cerebro Manufacturing produces four types of structural support fittings-plugs, rails, rivets, and clips-which are machined on two CNC machining centers.The machining centers have a capacity of 250,000 minutes per year.The gross margin per unit and machining requirements are shown in the spreadsheet below.
<strong>Use the following information to answer the question(s)below. Cerebro Manufacturing produces four types of structural support fittings-plugs, rails, rivets, and clips-which are machined on two CNC machining centers.The machining centers have a capacity of 250,000 minutes per year.The gross margin per unit and machining requirements are shown in the spreadsheet below.   What is the maximum possible production of rails based on the machine capacity?</strong> A)250,000.00 B)83,333.33 C)166,666.67 D)125,000.00 <div style=padding-top: 35px>
What is the maximum possible production of rails based on the machine capacity?

A)250,000.00
B)83,333.33
C)166,666.67
D)125,000.00
سؤال
The ________ indicates how much the value of the objective function will change as the right-hand side of a constraint is increased by 1.

A)objective coefficient
B)shadow price
C)binding constraint
D)reduced cost
سؤال
A constraint function is a function of the decision variables in the problem.
سؤال
What are the Excel functions to avoid in linear optimization?
سؤال
What are the two basic properties of a linear optimization model?
سؤال
Explain the simplex method used by Solver.
سؤال
What are the four possible outcomes that can be obtained by solving a linear optimization model?
سؤال
Infeasible problems can occur when the demand requirement is higher than the available capacity.
سؤال
Whenever a constraint has positive slack, the shadow price is equal to one.
سؤال
What is the importance of Shadow Price in the Sensitivity Report?
سؤال
A binding constraint is one for which the Cell Value is greater than the right-hand side of the value of the constraint.
سؤال
Any solution that satisfies all constraints of a problem is called a feasible solution.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/50
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 13: Linear Optimization
1
Use the following information to answer the following question(s), using the SUMPRODUCT function.
Stone Age Surfboards is a small manufacturer of two types of popular high-tide surfboards, the Rockwell and the Limestone models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 15 skilled workers, each of whom works 5 hours per day.The finishing department has 5 workers, who also work a 5-hour shift.Each pair of Rockwell surfboards requires 3 labor hours in the fabrication department and 1.5 labor hours in finishing.The Limestone model requires 4.5 labor-hours in fabrication and 2 labor-hours in finishing.The company operates 6 days a week.It makes a per-unit profit of $60 on the Rockwell model and $75 on the Limestone model.Approximately 4.1 Rockwell models and 8.4 Limestone models are produced per day.
<strong>Use the following information to answer the following question(s), using the SUMPRODUCT function. Stone Age Surfboards is a small manufacturer of two types of popular high-tide surfboards, the Rockwell and the Limestone models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 15 skilled workers, each of whom works 5 hours per day.The finishing department has 5 workers, who also work a 5-hour shift.Each pair of Rockwell surfboards requires 3 labor hours in the fabrication department and 1.5 labor hours in finishing.The Limestone model requires 4.5 labor-hours in fabrication and 2 labor-hours in finishing.The company operates 6 days a week.It makes a per-unit profit of $60 on the Rockwell model and $75 on the Limestone model.Approximately 4.1 Rockwell models and 8.4 Limestone models are produced per day.   What is the total number of hours used for the finishing operation?</strong> A)42.58 B)50.10 C)35.64 D)22.95
What is the total number of hours used for the finishing operation?

A)42.58
B)50.10
C)35.64
D)22.95
D
2
Consider the spreadsheet for Stone Age Surfboards provided below.Use this data to answer the following question(s), using the Standard Solver.
Stone Age Surfboards is a small manufacturer of two types of popular low-tide surfboards, the Graystone and the Lava models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 8 skilled workers, each of whom works 9.25 hours per day.The finishing department has 5 workers, each of whom works a 6-hour shift per day.Each pair of Graystone surfboards requires 2.5 labor hours in the fabrication department and 2 labor hours in finishing.The Lava model requires 4.2 labor-hours in fabrication and 3.6 labor-hours in finishing.The company operates 6 days a week.It makes a per unit profit of $40 on the Graystone model and $60 on the Lava model.
<strong>Consider the spreadsheet for Stone Age Surfboards provided below.Use this data to answer the following question(s), using the Standard Solver. Stone Age Surfboards is a small manufacturer of two types of popular low-tide surfboards, the Graystone and the Lava models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 8 skilled workers, each of whom works 9.25 hours per day.The finishing department has 5 workers, each of whom works a 6-hour shift per day.Each pair of Graystone surfboards requires 2.5 labor hours in the fabrication department and 2 labor hours in finishing.The Lava model requires 4.2 labor-hours in fabrication and 3.6 labor-hours in finishing.The company operates 6 days a week.It makes a per unit profit of $40 on the Graystone model and $60 on the Lava model.   What is the Allowable Decrease for Graystone surfboards produced?</strong> A)30.74 B)80.00 C)12.33 D)6)67
What is the Allowable Decrease for Graystone surfboards produced?

A)30.74
B)80.00
C)12.33
D)6)67
D
3
Consider the spreadsheet for Stone Age Surfboards provided below.Use this data to answer the following question(s), using the Standard Solver.
Stone Age Surfboards is a small manufacturer of two types of popular low-tide surfboards, the Graystone and the Lava models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 8 skilled workers, each of whom works 9.25 hours per day.The finishing department has 5 workers, each of whom works a 6-hour shift per day.Each pair of Graystone surfboards requires 2.5 labor hours in the fabrication department and 2 labor hours in finishing.The Lava model requires 4.2 labor-hours in fabrication and 3.6 labor-hours in finishing.The company operates 6 days a week.It makes a per unit profit of $40 on the Graystone model and $60 on the Lava model.
<strong>Consider the spreadsheet for Stone Age Surfboards provided below.Use this data to answer the following question(s), using the Standard Solver. Stone Age Surfboards is a small manufacturer of two types of popular low-tide surfboards, the Graystone and the Lava models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 8 skilled workers, each of whom works 9.25 hours per day.The finishing department has 5 workers, each of whom works a 6-hour shift per day.Each pair of Graystone surfboards requires 2.5 labor hours in the fabrication department and 2 labor hours in finishing.The Lava model requires 4.2 labor-hours in fabrication and 3.6 labor-hours in finishing.The company operates 6 days a week.It makes a per unit profit of $40 on the Graystone model and $60 on the Lava model.   What is the Allowable Increase for Lava surfboards produced?</strong> A)30 B)24 C)12 D)18
What is the Allowable Increase for Lava surfboards produced?

A)30
B)24
C)12
D)18
C
4
Consider the spreadsheet for Stone Age Surfboards provided below.Use this data to answer the following question(s), using the Standard Solver.
Stone Age Surfboards is a small manufacturer of two types of popular low-tide surfboards, the Graystone and the Lava models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 8 skilled workers, each of whom works 9.25 hours per day.The finishing department has 5 workers, each of whom works a 6-hour shift per day.Each pair of Graystone surfboards requires 2.5 labor hours in the fabrication department and 2 labor hours in finishing.The Lava model requires 4.2 labor-hours in fabrication and 3.6 labor-hours in finishing.The company operates 6 days a week.It makes a per unit profit of $40 on the Graystone model and $60 on the Lava model.
<strong>Consider the spreadsheet for Stone Age Surfboards provided below.Use this data to answer the following question(s), using the Standard Solver. Stone Age Surfboards is a small manufacturer of two types of popular low-tide surfboards, the Graystone and the Lava models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 8 skilled workers, each of whom works 9.25 hours per day.The finishing department has 5 workers, each of whom works a 6-hour shift per day.Each pair of Graystone surfboards requires 2.5 labor hours in the fabrication department and 2 labor hours in finishing.The Lava model requires 4.2 labor-hours in fabrication and 3.6 labor-hours in finishing.The company operates 6 days a week.It makes a per unit profit of $40 on the Graystone model and $60 on the Lava model.   If the unit profit on Graystone surfboards is increased by $10, what is the total profit generated?</strong> A)$ 489.13 B)$ 521.74 C)$ 423.91 D)$ 554.35
If the unit profit on Graystone surfboards is increased by $10, what is the total profit generated?

A)$ 489.13
B)$ 521.74
C)$ 423.91
D)$ 554.35
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
5
Consider the spreadsheet for Stone Age Surfboards provided below.Use this data to answer the following question(s), using the Standard Solver.
Stone Age Surfboards is a small manufacturer of two types of popular low-tide surfboards, the Graystone and the Lava models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 8 skilled workers, each of whom works 9.25 hours per day.The finishing department has 5 workers, each of whom works a 6-hour shift per day.Each pair of Graystone surfboards requires 2.5 labor hours in the fabrication department and 2 labor hours in finishing.The Lava model requires 4.2 labor-hours in fabrication and 3.6 labor-hours in finishing.The company operates 6 days a week.It makes a per unit profit of $40 on the Graystone model and $60 on the Lava model.
<strong>Consider the spreadsheet for Stone Age Surfboards provided below.Use this data to answer the following question(s), using the Standard Solver. Stone Age Surfboards is a small manufacturer of two types of popular low-tide surfboards, the Graystone and the Lava models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 8 skilled workers, each of whom works 9.25 hours per day.The finishing department has 5 workers, each of whom works a 6-hour shift per day.Each pair of Graystone surfboards requires 2.5 labor hours in the fabrication department and 2 labor hours in finishing.The Lava model requires 4.2 labor-hours in fabrication and 3.6 labor-hours in finishing.The company operates 6 days a week.It makes a per unit profit of $40 on the Graystone model and $60 on the Lava model.   What is the Allowable Decrease in the fabrication hours used?</strong> A)26.84 B)16.67 C)8)33 D)38.46
What is the Allowable Decrease in the fabrication hours used?

A)26.84
B)16.67
C)8)33
D)38.46
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
6
Use the following information to answer the following question(s), using the SUMPRODUCT function.
Stone Age Surfboards is a small manufacturer of two types of popular high-tide surfboards, the Rockwell and the Limestone models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 15 skilled workers, each of whom works 5 hours per day.The finishing department has 5 workers, who also work a 5-hour shift.Each pair of Rockwell surfboards requires 3 labor hours in the fabrication department and 1.5 labor hours in finishing.The Limestone model requires 4.5 labor-hours in fabrication and 2 labor-hours in finishing.The company operates 6 days a week.It makes a per-unit profit of $60 on the Rockwell model and $75 on the Limestone model.Approximately 4.1 Rockwell models and 8.4 Limestone models are produced per day.
<strong>Use the following information to answer the following question(s), using the SUMPRODUCT function. Stone Age Surfboards is a small manufacturer of two types of popular high-tide surfboards, the Rockwell and the Limestone models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 15 skilled workers, each of whom works 5 hours per day.The finishing department has 5 workers, who also work a 5-hour shift.Each pair of Rockwell surfboards requires 3 labor hours in the fabrication department and 1.5 labor hours in finishing.The Limestone model requires 4.5 labor-hours in fabrication and 2 labor-hours in finishing.The company operates 6 days a week.It makes a per-unit profit of $60 on the Rockwell model and $75 on the Limestone model.Approximately 4.1 Rockwell models and 8.4 Limestone models are produced per day.   What is the total number of hours used for fabrication?</strong> A)42.58 B)50.10 C)35.64 D)22.95
What is the total number of hours used for fabrication?

A)42.58
B)50.10
C)35.64
D)22.95
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
7
Which of the following best defines decision variables in an optimization model?

A)They are limitations, requirements, or other restrictions that are imposed on any solution.
B)They are the quantities that the model seeks to maximize or minimize.
C)They are quantities for which no feasible solutions exist.
D)They are unknown values that the model seeks to determine.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
8
Consider the spreadsheet for Stone Age Surfboards provided below.Use this data to answer the following question(s), using the Standard Solver.
Stone Age Surfboards is a small manufacturer of two types of popular low-tide surfboards, the Graystone and the Lava models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 8 skilled workers, each of whom works 9.25 hours per day.The finishing department has 5 workers, each of whom works a 6-hour shift per day.Each pair of Graystone surfboards requires 2.5 labor hours in the fabrication department and 2 labor hours in finishing.The Lava model requires 4.2 labor-hours in fabrication and 3.6 labor-hours in finishing.The company operates 6 days a week.It makes a per unit profit of $40 on the Graystone model and $60 on the Lava model.
<strong>Consider the spreadsheet for Stone Age Surfboards provided below.Use this data to answer the following question(s), using the Standard Solver. Stone Age Surfboards is a small manufacturer of two types of popular low-tide surfboards, the Graystone and the Lava models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 8 skilled workers, each of whom works 9.25 hours per day.The finishing department has 5 workers, each of whom works a 6-hour shift per day.Each pair of Graystone surfboards requires 2.5 labor hours in the fabrication department and 2 labor hours in finishing.The Lava model requires 4.2 labor-hours in fabrication and 3.6 labor-hours in finishing.The company operates 6 days a week.It makes a per unit profit of $40 on the Graystone model and $60 on the Lava model.   What is the value of slack obtained from the answer report?</strong> A)46.78 B)38.46 C)59.24 D)23.85
What is the value of slack obtained from the answer report?

A)46.78
B)38.46
C)59.24
D)23.85
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
9
Consider the spreadsheet for Stone Age Surfboards provided below.Use this data to answer the following question(s), using the Standard Solver.
Stone Age Surfboards is a small manufacturer of two types of popular low-tide surfboards, the Graystone and the Lava models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 8 skilled workers, each of whom works 9.25 hours per day.The finishing department has 5 workers, each of whom works a 6-hour shift per day.Each pair of Graystone surfboards requires 2.5 labor hours in the fabrication department and 2 labor hours in finishing.The Lava model requires 4.2 labor-hours in fabrication and 3.6 labor-hours in finishing.The company operates 6 days a week.It makes a per unit profit of $40 on the Graystone model and $60 on the Lava model.
<strong>Consider the spreadsheet for Stone Age Surfboards provided below.Use this data to answer the following question(s), using the Standard Solver. Stone Age Surfboards is a small manufacturer of two types of popular low-tide surfboards, the Graystone and the Lava models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 8 skilled workers, each of whom works 9.25 hours per day.The finishing department has 5 workers, each of whom works a 6-hour shift per day.Each pair of Graystone surfboards requires 2.5 labor hours in the fabrication department and 2 labor hours in finishing.The Lava model requires 4.2 labor-hours in fabrication and 3.6 labor-hours in finishing.The company operates 6 days a week.It makes a per unit profit of $40 on the Graystone model and $60 on the Lava model.   What is the Allowable Increase in the finishing hours used?</strong> A)32.46 B)8)33 C)26.84 D)16.67
What is the Allowable Increase in the finishing hours used?

A)32.46
B)8)33
C)26.84
D)16.67
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
10
Consider the spreadsheet for Stone Age Surfboards provided below.Use this data to answer the following question(s), using the Standard Solver.
Stone Age Surfboards is a small manufacturer of two types of popular low-tide surfboards, the Graystone and the Lava models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 8 skilled workers, each of whom works 9.25 hours per day.The finishing department has 5 workers, each of whom works a 6-hour shift per day.Each pair of Graystone surfboards requires 2.5 labor hours in the fabrication department and 2 labor hours in finishing.The Lava model requires 4.2 labor-hours in fabrication and 3.6 labor-hours in finishing.The company operates 6 days a week.It makes a per unit profit of $40 on the Graystone model and $60 on the Lava model.
<strong>Consider the spreadsheet for Stone Age Surfboards provided below.Use this data to answer the following question(s), using the Standard Solver. Stone Age Surfboards is a small manufacturer of two types of popular low-tide surfboards, the Graystone and the Lava models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 8 skilled workers, each of whom works 9.25 hours per day.The finishing department has 5 workers, each of whom works a 6-hour shift per day.Each pair of Graystone surfboards requires 2.5 labor hours in the fabrication department and 2 labor hours in finishing.The Lava model requires 4.2 labor-hours in fabrication and 3.6 labor-hours in finishing.The company operates 6 days a week.It makes a per unit profit of $40 on the Graystone model and $60 on the Lava model.   What will be the total profit contribution from Graystone surfboards?</strong> A)$ 391.30 B)$ 521.74 C)$ 130.43 D)$ 276.65
What will be the total profit contribution from Graystone surfboards?

A)$ 391.30
B)$ 521.74
C)$ 130.43
D)$ 276.65
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
11
Which of the following best defines constraints in an optimization problem?

A)They are limitations, requirements, or other restrictions that are imposed on any solution.
B)They are quantities that an optimization model seeks to maximize or minimize.
C)They are quantities for which no feasible solutions exist.
D)They are unknown values that the model seeks to determine.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
12
Use the following information to answer the following question(s), using the SUMPRODUCT function.
Stone Age Surfboards is a small manufacturer of two types of popular high-tide surfboards, the Rockwell and the Limestone models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 15 skilled workers, each of whom works 5 hours per day.The finishing department has 5 workers, who also work a 5-hour shift.Each pair of Rockwell surfboards requires 3 labor hours in the fabrication department and 1.5 labor hours in finishing.The Limestone model requires 4.5 labor-hours in fabrication and 2 labor-hours in finishing.The company operates 6 days a week.It makes a per-unit profit of $60 on the Rockwell model and $75 on the Limestone model.Approximately 4.1 Rockwell models and 8.4 Limestone models are produced per day.
<strong>Use the following information to answer the following question(s), using the SUMPRODUCT function. Stone Age Surfboards is a small manufacturer of two types of popular high-tide surfboards, the Rockwell and the Limestone models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 15 skilled workers, each of whom works 5 hours per day.The finishing department has 5 workers, who also work a 5-hour shift.Each pair of Rockwell surfboards requires 3 labor hours in the fabrication department and 1.5 labor hours in finishing.The Limestone model requires 4.5 labor-hours in fabrication and 2 labor-hours in finishing.The company operates 6 days a week.It makes a per-unit profit of $60 on the Rockwell model and $75 on the Limestone model.Approximately 4.1 Rockwell models and 8.4 Limestone models are produced per day.   What is the total profit generated?</strong> A)$ 876.00 B)$ 675.50 C)$ 480.50 D)$ 965.00
What is the total profit generated?

A)$ 876.00
B)$ 675.50
C)$ 480.50
D)$ 965.00
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
13
Consider the spreadsheet for Stone Age Surfboards provided below.Use this data to answer the following question(s), using the Standard Solver.
Stone Age Surfboards is a small manufacturer of two types of popular low-tide surfboards, the Graystone and the Lava models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 8 skilled workers, each of whom works 9.25 hours per day.The finishing department has 5 workers, each of whom works a 6-hour shift per day.Each pair of Graystone surfboards requires 2.5 labor hours in the fabrication department and 2 labor hours in finishing.The Lava model requires 4.2 labor-hours in fabrication and 3.6 labor-hours in finishing.The company operates 6 days a week.It makes a per unit profit of $40 on the Graystone model and $60 on the Lava model.
<strong>Consider the spreadsheet for Stone Age Surfboards provided below.Use this data to answer the following question(s), using the Standard Solver. Stone Age Surfboards is a small manufacturer of two types of popular low-tide surfboards, the Graystone and the Lava models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 8 skilled workers, each of whom works 9.25 hours per day.The finishing department has 5 workers, each of whom works a 6-hour shift per day.Each pair of Graystone surfboards requires 2.5 labor hours in the fabrication department and 2 labor hours in finishing.The Lava model requires 4.2 labor-hours in fabrication and 3.6 labor-hours in finishing.The company operates 6 days a week.It makes a per unit profit of $40 on the Graystone model and $60 on the Lava model.   What is the total number of hours used for fabrication?</strong> A)54.5 B)30.0 C)35.5 D)43.8
What is the total number of hours used for fabrication?

A)54.5
B)30.0
C)35.5
D)43.8
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
14
Consider the spreadsheet for Stone Age Surfboards provided below.Use this data to answer the following question(s), using the Standard Solver.
Stone Age Surfboards is a small manufacturer of two types of popular low-tide surfboards, the Graystone and the Lava models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 8 skilled workers, each of whom works 9.25 hours per day.The finishing department has 5 workers, each of whom works a 6-hour shift per day.Each pair of Graystone surfboards requires 2.5 labor hours in the fabrication department and 2 labor hours in finishing.The Lava model requires 4.2 labor-hours in fabrication and 3.6 labor-hours in finishing.The company operates 6 days a week.It makes a per unit profit of $40 on the Graystone model and $60 on the Lava model.
<strong>Consider the spreadsheet for Stone Age Surfboards provided below.Use this data to answer the following question(s), using the Standard Solver. Stone Age Surfboards is a small manufacturer of two types of popular low-tide surfboards, the Graystone and the Lava models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 8 skilled workers, each of whom works 9.25 hours per day.The finishing department has 5 workers, each of whom works a 6-hour shift per day.Each pair of Graystone surfboards requires 2.5 labor hours in the fabrication department and 2 labor hours in finishing.The Lava model requires 4.2 labor-hours in fabrication and 3.6 labor-hours in finishing.The company operates 6 days a week.It makes a per unit profit of $40 on the Graystone model and $60 on the Lava model.   If the unit profit on Graystone surfboards is increased by $10, what is the Allowable Decrease for Lava surfboards?</strong> A)30.00 B)85.00 C)16.67 D)58.75
If the unit profit on Graystone surfboards is increased by $10, what is the Allowable Decrease for Lava surfboards?

A)30.00
B)85.00
C)16.67
D)58.75
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
15
Consider the spreadsheet for Stone Age Surfboards provided below.Use this data to answer the following question(s), using the Standard Solver.
Stone Age Surfboards is a small manufacturer of two types of popular low-tide surfboards, the Graystone and the Lava models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 8 skilled workers, each of whom works 9.25 hours per day.The finishing department has 5 workers, each of whom works a 6-hour shift per day.Each pair of Graystone surfboards requires 2.5 labor hours in the fabrication department and 2 labor hours in finishing.The Lava model requires 4.2 labor-hours in fabrication and 3.6 labor-hours in finishing.The company operates 6 days a week.It makes a per unit profit of $40 on the Graystone model and $60 on the Lava model.
<strong>Consider the spreadsheet for Stone Age Surfboards provided below.Use this data to answer the following question(s), using the Standard Solver. Stone Age Surfboards is a small manufacturer of two types of popular low-tide surfboards, the Graystone and the Lava models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 8 skilled workers, each of whom works 9.25 hours per day.The finishing department has 5 workers, each of whom works a 6-hour shift per day.Each pair of Graystone surfboards requires 2.5 labor hours in the fabrication department and 2 labor hours in finishing.The Lava model requires 4.2 labor-hours in fabrication and 3.6 labor-hours in finishing.The company operates 6 days a week.It makes a per unit profit of $40 on the Graystone model and $60 on the Lava model.   What is the total profit generated?</strong> A)$ 675.68 B)$ 920.57 C)$ 521.74 D)$ 788.32
What is the total profit generated?

A)$ 675.68
B)$ 920.57
C)$ 521.74
D)$ 788.32
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
16
Consider the spreadsheet for Stone Age Surfboards provided below.Use this data to answer the following question(s), using the Standard Solver.
Stone Age Surfboards is a small manufacturer of two types of popular low-tide surfboards, the Graystone and the Lava models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 8 skilled workers, each of whom works 9.25 hours per day.The finishing department has 5 workers, each of whom works a 6-hour shift per day.Each pair of Graystone surfboards requires 2.5 labor hours in the fabrication department and 2 labor hours in finishing.The Lava model requires 4.2 labor-hours in fabrication and 3.6 labor-hours in finishing.The company operates 6 days a week.It makes a per unit profit of $40 on the Graystone model and $60 on the Lava model.
<strong>Consider the spreadsheet for Stone Age Surfboards provided below.Use this data to answer the following question(s), using the Standard Solver. Stone Age Surfboards is a small manufacturer of two types of popular low-tide surfboards, the Graystone and the Lava models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 8 skilled workers, each of whom works 9.25 hours per day.The finishing department has 5 workers, each of whom works a 6-hour shift per day.Each pair of Graystone surfboards requires 2.5 labor hours in the fabrication department and 2 labor hours in finishing.The Lava model requires 4.2 labor-hours in fabrication and 3.6 labor-hours in finishing.The company operates 6 days a week.It makes a per unit profit of $40 on the Graystone model and $60 on the Lava model.   What is the total number of hours used for the finishing operation?</strong> A)18.7 B)30.0 C)35.5 D)24.2
What is the total number of hours used for the finishing operation?

A)18.7
B)30.0
C)35.5
D)24.2
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
17
Consider the spreadsheet for Stone Age Surfboards provided below.Use this data to answer the following question(s), using the Standard Solver.
Stone Age Surfboards is a small manufacturer of two types of popular low-tide surfboards, the Graystone and the Lava models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 8 skilled workers, each of whom works 9.25 hours per day.The finishing department has 5 workers, each of whom works a 6-hour shift per day.Each pair of Graystone surfboards requires 2.5 labor hours in the fabrication department and 2 labor hours in finishing.The Lava model requires 4.2 labor-hours in fabrication and 3.6 labor-hours in finishing.The company operates 6 days a week.It makes a per unit profit of $40 on the Graystone model and $60 on the Lava model.
<strong>Consider the spreadsheet for Stone Age Surfboards provided below.Use this data to answer the following question(s), using the Standard Solver. Stone Age Surfboards is a small manufacturer of two types of popular low-tide surfboards, the Graystone and the Lava models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 8 skilled workers, each of whom works 9.25 hours per day.The finishing department has 5 workers, each of whom works a 6-hour shift per day.Each pair of Graystone surfboards requires 2.5 labor hours in the fabrication department and 2 labor hours in finishing.The Lava model requires 4.2 labor-hours in fabrication and 3.6 labor-hours in finishing.The company operates 6 days a week.It makes a per unit profit of $40 on the Graystone model and $60 on the Lava model.   What will be the total profit contribution from Lava surfboards?</strong> A)$ 391.30 B)$ 521.74 C)$ 130.43 D)$ 276.65
What will be the total profit contribution from Lava surfboards?

A)$ 391.30
B)$ 521.74
C)$ 130.43
D)$ 276.65
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
18
Consider the spreadsheet for Stone Age Surfboards provided below.Use this data to answer the following question(s), using the Standard Solver.
Stone Age Surfboards is a small manufacturer of two types of popular low-tide surfboards, the Graystone and the Lava models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 8 skilled workers, each of whom works 9.25 hours per day.The finishing department has 5 workers, each of whom works a 6-hour shift per day.Each pair of Graystone surfboards requires 2.5 labor hours in the fabrication department and 2 labor hours in finishing.The Lava model requires 4.2 labor-hours in fabrication and 3.6 labor-hours in finishing.The company operates 6 days a week.It makes a per unit profit of $40 on the Graystone model and $60 on the Lava model.
<strong>Consider the spreadsheet for Stone Age Surfboards provided below.Use this data to answer the following question(s), using the Standard Solver. Stone Age Surfboards is a small manufacturer of two types of popular low-tide surfboards, the Graystone and the Lava models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 8 skilled workers, each of whom works 9.25 hours per day.The finishing department has 5 workers, each of whom works a 6-hour shift per day.Each pair of Graystone surfboards requires 2.5 labor hours in the fabrication department and 2 labor hours in finishing.The Lava model requires 4.2 labor-hours in fabrication and 3.6 labor-hours in finishing.The company operates 6 days a week.It makes a per unit profit of $40 on the Graystone model and $60 on the Lava model.   If the unit profit on Graystone surfboards is increased by $10, what is the Allowable Increase for Lava surfboards?</strong> A)30.00 B)85.00 C)16.67 D)58.75
If the unit profit on Graystone surfboards is increased by $10, what is the Allowable Increase for Lava surfboards?

A)30.00
B)85.00
C)16.67
D)58.75
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
19
Consider the spreadsheet for Stone Age Surfboards provided below.Use this data to answer the following question(s), using the Standard Solver.
Stone Age Surfboards is a small manufacturer of two types of popular low-tide surfboards, the Graystone and the Lava models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 8 skilled workers, each of whom works 9.25 hours per day.The finishing department has 5 workers, each of whom works a 6-hour shift per day.Each pair of Graystone surfboards requires 2.5 labor hours in the fabrication department and 2 labor hours in finishing.The Lava model requires 4.2 labor-hours in fabrication and 3.6 labor-hours in finishing.The company operates 6 days a week.It makes a per unit profit of $40 on the Graystone model and $60 on the Lava model.
<strong>Consider the spreadsheet for Stone Age Surfboards provided below.Use this data to answer the following question(s), using the Standard Solver. Stone Age Surfboards is a small manufacturer of two types of popular low-tide surfboards, the Graystone and the Lava models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 8 skilled workers, each of whom works 9.25 hours per day.The finishing department has 5 workers, each of whom works a 6-hour shift per day.Each pair of Graystone surfboards requires 2.5 labor hours in the fabrication department and 2 labor hours in finishing.The Lava model requires 4.2 labor-hours in fabrication and 3.6 labor-hours in finishing.The company operates 6 days a week.It makes a per unit profit of $40 on the Graystone model and $60 on the Lava model.   What is the shadow price for the finishing hours used?</strong> A)32.46 B)17.39 C)8)33 D)6)67
What is the shadow price for the finishing hours used?

A)32.46
B)17.39
C)8)33
D)6)67
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
20
Which of the following best defines objective functions?

A)They are limitations, requirements, or other restrictions that are imposed on any solution in an optimization model.
B)They are quantities that an optimization model seeks to maximize or minimize.
C)They are quantities for which no feasible solutions exist in an optimization model.
D)They are unknown values that an optimization model seeks to determine.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
21
An infeasible problem is one for which ________.

A)the objective is maximized or minimized by more than one combination of decision variables
B)there is no solution that simultaneously satisfies all the constraints
C)the objective can be increased or decreased to infinity or negative infinity
D)there is exactly one solution that will result in the maximum or minimum objective
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
22
Consider the spreadsheet for Stone Age Surfboards provided below.Use this data to answer the following question(s), using the Standard Solver.
Stone Age Surfboards is a small manufacturer of two types of popular low-tide surfboards, the Graystone and the Lava models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 8 skilled workers, each of whom works 9.25 hours per day.The finishing department has 5 workers, each of whom works a 6-hour shift per day.Each pair of Graystone surfboards requires 2.5 labor hours in the fabrication department and 2 labor hours in finishing.The Lava model requires 4.2 labor-hours in fabrication and 3.6 labor-hours in finishing.The company operates 6 days a week.It makes a per unit profit of $40 on the Graystone model and $60 on the Lava model.
<strong>Consider the spreadsheet for Stone Age Surfboards provided below.Use this data to answer the following question(s), using the Standard Solver. Stone Age Surfboards is a small manufacturer of two types of popular low-tide surfboards, the Graystone and the Lava models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 8 skilled workers, each of whom works 9.25 hours per day.The finishing department has 5 workers, each of whom works a 6-hour shift per day.Each pair of Graystone surfboards requires 2.5 labor hours in the fabrication department and 2 labor hours in finishing.The Lava model requires 4.2 labor-hours in fabrication and 3.6 labor-hours in finishing.The company operates 6 days a week.It makes a per unit profit of $40 on the Graystone model and $60 on the Lava model.   Due to decreasing profits, if the production of Graystone surfboards is stopped, compute the total profit the firm can earn.</strong> A)$ 521.74 B)$ 489.13 C)$ 423.91 D)$ 456.52
Due to decreasing profits, if the production of Graystone surfboards is stopped, compute the total profit the firm can earn.

A)$ 521.74
B)$ 489.13
C)$ 423.91
D)$ 456.52
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
23
If a model has alternative optimal solutions, ________.

A)the objective is maximized or minimized by more than one combination of decision variables
B)there is no solution that simultaneously satisfies all the constraints
C)the objective can be increased or decreased to infinity or negative infinity
D)there is exactly one solution that will result in the maximum or minimum objective
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
24
Use the following information to answer the question(s)below.
Cerebro Manufacturing produces four types of structural support fittings-plugs, rails, rivets, and clips-which are machined on two CNC machining centers.The machining centers have a capacity of 250,000 minutes per year.The gross margin per unit and machining requirements are shown in the spreadsheet below.
<strong>Use the following information to answer the question(s)below. Cerebro Manufacturing produces four types of structural support fittings-plugs, rails, rivets, and clips-which are machined on two CNC machining centers.The machining centers have a capacity of 250,000 minutes per year.The gross margin per unit and machining requirements are shown in the spreadsheet below.   What is the total profit generated from the manufacture of only plugs?</strong> A)$ 66,666.67 B)$ 100,000.00 C)$ 183,333.33 D)$ 150,000.00
What is the total profit generated from the manufacture of only plugs?

A)$ 66,666.67
B)$ 100,000.00
C)$ 183,333.33
D)$ 150,000.00
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
25
When a model has a unique optimal solution, it means that ________.

A)the objective is maximized or minimized by more than one combination of decision variables
B)there is no solution that simultaneously satisfies all the constraints
C)the Allowable Increase or Allowable Decrease values for changing cells are zero
D)there is exactly one solution that will result in the maximum or minimum objective
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
26
Use the following information to answer the question(s)below.
Cerebro Manufacturing produces four types of structural support fittings-plugs, rails, rivets, and clips-which are machined on two CNC machining centers.The machining centers have a capacity of 250,000 minutes per year.The gross margin per unit and machining requirements are shown in the spreadsheet below.
<strong>Use the following information to answer the question(s)below. Cerebro Manufacturing produces four types of structural support fittings-plugs, rails, rivets, and clips-which are machined on two CNC machining centers.The machining centers have a capacity of 250,000 minutes per year.The gross margin per unit and machining requirements are shown in the spreadsheet below.   What is the maximum production of clips based on the machine capacity?</strong> A)250,000.00 B)83,333.33 C)166,666.67 D)125,000.00
What is the maximum production of clips based on the machine capacity?

A)250,000.00
B)83,333.33
C)166,666.67
D)125,000.00
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
27
An unbounded problem is one for which ________.

A)the objective is maximized or minimized by more than one combination of decision variables
B)there is no solution that simultaneously satisfies all the constraints
C)the objective can be increased or decreased to infinity or negative infinity while the solution remains feasible
D)there is exactly one solution that will result in the maximum or minimum objective
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
28
Consider the spreadsheet for Stone Age Surfboards provided below.Use this data to answer the following question(s), using the Standard Solver.
Stone Age Surfboards is a small manufacturer of two types of popular low-tide surfboards, the Graystone and the Lava models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 8 skilled workers, each of whom works 9.25 hours per day.The finishing department has 5 workers, each of whom works a 6-hour shift per day.Each pair of Graystone surfboards requires 2.5 labor hours in the fabrication department and 2 labor hours in finishing.The Lava model requires 4.2 labor-hours in fabrication and 3.6 labor-hours in finishing.The company operates 6 days a week.It makes a per unit profit of $40 on the Graystone model and $60 on the Lava model.
<strong>Consider the spreadsheet for Stone Age Surfboards provided below.Use this data to answer the following question(s), using the Standard Solver. Stone Age Surfboards is a small manufacturer of two types of popular low-tide surfboards, the Graystone and the Lava models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 8 skilled workers, each of whom works 9.25 hours per day.The finishing department has 5 workers, each of whom works a 6-hour shift per day.Each pair of Graystone surfboards requires 2.5 labor hours in the fabrication department and 2 labor hours in finishing.The Lava model requires 4.2 labor-hours in fabrication and 3.6 labor-hours in finishing.The company operates 6 days a week.It makes a per unit profit of $40 on the Graystone model and $60 on the Lava model.   If the unit profit on both Graystone and Lava surfboards is increased by $10, what is the shadow price for the finishing hours used?</strong> A)-4.35 B)8)33 C)20.65 D)32.46
If the unit profit on both Graystone and Lava surfboards is increased by $10, what is the shadow price for the finishing hours used?

A)-4.35
B)8)33
C)20.65
D)32.46
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
29
Use the following information to answer the question(s)below.
Cerebro Manufacturing produces four types of structural support fittings-plugs, rails, rivets, and clips-which are machined on two CNC machining centers.The machining centers have a capacity of 250,000 minutes per year.The gross margin per unit and machining requirements are shown in the spreadsheet below.
<strong>Use the following information to answer the question(s)below. Cerebro Manufacturing produces four types of structural support fittings-plugs, rails, rivets, and clips-which are machined on two CNC machining centers.The machining centers have a capacity of 250,000 minutes per year.The gross margin per unit and machining requirements are shown in the spreadsheet below.   Which of the following options is used if Solver gives an error message that linearity is not satisfied?</strong> A)Ignore Integer Constraints B)Show Iteration Results C)Use Automatic Scaling D)Use Multistart
Which of the following options is used if Solver gives an error message that linearity is not satisfied?

A)Ignore Integer Constraints
B)Show Iteration Results
C)Use Automatic Scaling
D)Use Multistart
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
30
Use the following information to answer the question(s)below.
Cerebro Manufacturing produces four types of structural support fittings-plugs, rails, rivets, and clips-which are machined on two CNC machining centers.The machining centers have a capacity of 250,000 minutes per year.The gross margin per unit and machining requirements are shown in the spreadsheet below.
<strong>Use the following information to answer the question(s)below. Cerebro Manufacturing produces four types of structural support fittings-plugs, rails, rivets, and clips-which are machined on two CNC machining centers.The machining centers have a capacity of 250,000 minutes per year.The gross margin per unit and machining requirements are shown in the spreadsheet below.   What is the gross margin per minute of plugs manufactured?</strong> A)$ 0.60 B)$ 0.73 C)$ 0.40 D)$ 0.27
What is the gross margin per minute of plugs manufactured?

A)$ 0.60
B)$ 0.73
C)$ 0.40
D)$ 0.27
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
31
Use the following information to answer the question(s)below.
Cerebro Manufacturing produces four types of structural support fittings-plugs, rails, rivets, and clips-which are machined on two CNC machining centers.The machining centers have a capacity of 250,000 minutes per year.The gross margin per unit and machining requirements are shown in the spreadsheet below.
<strong>Use the following information to answer the question(s)below. Cerebro Manufacturing produces four types of structural support fittings-plugs, rails, rivets, and clips-which are machined on two CNC machining centers.The machining centers have a capacity of 250,000 minutes per year.The gross margin per unit and machining requirements are shown in the spreadsheet below.   What is the gross margin per minute of rivets manufactured?</strong> A)$ 0.60 B)$ 0.73 C)$ 0.40 D)$ 0.27
What is the gross margin per minute of rivets manufactured?

A)$ 0.60
B)$ 0.73
C)$ 0.40
D)$ 0.27
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
32
Which of the following solving methods is selected in the Solver dialog for linear and linear integer optimization problems?

A)GRG Nonlinear
B)Simplex LP
C)SOCP Barrier Engine
D)Evolutionary
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
33
Use the following information to answer the question(s)below.
Cerebro Manufacturing produces four types of structural support fittings-plugs, rails, rivets, and clips-which are machined on two CNC machining centers.The machining centers have a capacity of 250,000 minutes per year.The gross margin per unit and machining requirements are shown in the spreadsheet below.
<strong>Use the following information to answer the question(s)below. Cerebro Manufacturing produces four types of structural support fittings-plugs, rails, rivets, and clips-which are machined on two CNC machining centers.The machining centers have a capacity of 250,000 minutes per year.The gross margin per unit and machining requirements are shown in the spreadsheet below.   What is the total profit generated from the manufacture of rivets?</strong> A)$ 66,666.67 B)$ 100,000.00 C)$ 183,333.33 D)$ 150,000.00
What is the total profit generated from the manufacture of rivets?

A)$ 66,666.67
B)$ 100,000.00
C)$ 183,333.33
D)$ 150,000.00
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
34
Consider the spreadsheet for Stone Age Surfboards provided below.Use this data to answer the following question(s), using the Standard Solver.
Stone Age Surfboards is a small manufacturer of two types of popular low-tide surfboards, the Graystone and the Lava models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 8 skilled workers, each of whom works 9.25 hours per day.The finishing department has 5 workers, each of whom works a 6-hour shift per day.Each pair of Graystone surfboards requires 2.5 labor hours in the fabrication department and 2 labor hours in finishing.The Lava model requires 4.2 labor-hours in fabrication and 3.6 labor-hours in finishing.The company operates 6 days a week.It makes a per unit profit of $40 on the Graystone model and $60 on the Lava model.
<strong>Consider the spreadsheet for Stone Age Surfboards provided below.Use this data to answer the following question(s), using the Standard Solver. Stone Age Surfboards is a small manufacturer of two types of popular low-tide surfboards, the Graystone and the Lava models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 8 skilled workers, each of whom works 9.25 hours per day.The finishing department has 5 workers, each of whom works a 6-hour shift per day.Each pair of Graystone surfboards requires 2.5 labor hours in the fabrication department and 2 labor hours in finishing.The Lava model requires 4.2 labor-hours in fabrication and 3.6 labor-hours in finishing.The company operates 6 days a week.It makes a per unit profit of $40 on the Graystone model and $60 on the Lava model.   If the unit profit on Graystone surfboards is increased by $10, what is the shadow price for the finishing hours used?</strong> A)18.48 B)17.39 C)15.42 D)14.15
If the unit profit on Graystone surfboards is increased by $10, what is the shadow price for the finishing hours used?

A)18.48
B)17.39
C)15.42
D)14.15
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
35
Consider the spreadsheet for Stone Age Surfboards provided below.Use this data to answer the following question(s), using the Standard Solver.
Stone Age Surfboards is a small manufacturer of two types of popular low-tide surfboards, the Graystone and the Lava models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 8 skilled workers, each of whom works 9.25 hours per day.The finishing department has 5 workers, each of whom works a 6-hour shift per day.Each pair of Graystone surfboards requires 2.5 labor hours in the fabrication department and 2 labor hours in finishing.The Lava model requires 4.2 labor-hours in fabrication and 3.6 labor-hours in finishing.The company operates 6 days a week.It makes a per unit profit of $40 on the Graystone model and $60 on the Lava model.
<strong>Consider the spreadsheet for Stone Age Surfboards provided below.Use this data to answer the following question(s), using the Standard Solver. Stone Age Surfboards is a small manufacturer of two types of popular low-tide surfboards, the Graystone and the Lava models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 8 skilled workers, each of whom works 9.25 hours per day.The finishing department has 5 workers, each of whom works a 6-hour shift per day.Each pair of Graystone surfboards requires 2.5 labor hours in the fabrication department and 2 labor hours in finishing.The Lava model requires 4.2 labor-hours in fabrication and 3.6 labor-hours in finishing.The company operates 6 days a week.It makes a per unit profit of $40 on the Graystone model and $60 on the Lava model.   If the unit profit on both Graystone and Lava surfboards is increased by $10, what is the Allowable Decrease for Lava surfboards?</strong> A)95.00 B)38.46 C)20.00 D)11.11
If the unit profit on both Graystone and Lava surfboards is increased by $10, what is the Allowable Decrease for Lava surfboards?

A)95.00
B)38.46
C)20.00
D)11.11
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
36
Which of the following approaches provided by the Risk Solver Platform can automatically run multiple optimizations while varying model parameters within a predefined range?

A)sensitivity analysis
B)breakdown analysis
C)parameter analysis
D)uncertainty analysis
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
37
Consider the spreadsheet for Stone Age Surfboards provided below.Use this data to answer the following question(s), using the Standard Solver.
Stone Age Surfboards is a small manufacturer of two types of popular low-tide surfboards, the Graystone and the Lava models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 8 skilled workers, each of whom works 9.25 hours per day.The finishing department has 5 workers, each of whom works a 6-hour shift per day.Each pair of Graystone surfboards requires 2.5 labor hours in the fabrication department and 2 labor hours in finishing.The Lava model requires 4.2 labor-hours in fabrication and 3.6 labor-hours in finishing.The company operates 6 days a week.It makes a per unit profit of $40 on the Graystone model and $60 on the Lava model.
<strong>Consider the spreadsheet for Stone Age Surfboards provided below.Use this data to answer the following question(s), using the Standard Solver. Stone Age Surfboards is a small manufacturer of two types of popular low-tide surfboards, the Graystone and the Lava models.The manufacturing process consists of two departments: fabrication and finishing.The fabrication department has 8 skilled workers, each of whom works 9.25 hours per day.The finishing department has 5 workers, each of whom works a 6-hour shift per day.Each pair of Graystone surfboards requires 2.5 labor hours in the fabrication department and 2 labor hours in finishing.The Lava model requires 4.2 labor-hours in fabrication and 3.6 labor-hours in finishing.The company operates 6 days a week.It makes a per unit profit of $40 on the Graystone model and $60 on the Lava model.   If the unit profit on both Graystone and Lava surfboards is increased by $10, what is the total profit generated?</strong> A)$ 521.74 B)$ 505.43 C)$ 423.91 D)$ 619.57
If the unit profit on both Graystone and Lava surfboards is increased by $10, what is the total profit generated?

A)$ 521.74
B)$ 505.43
C)$ 423.91
D)$ 619.57
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
38
Alternate optimal solutions exist when the ________.

A)reduced cost is equal to the shadow price
B)ratio of the objective coefficient to the constraint coefficient is one
C)Allowable Increase values for changing cells are zero
D)final value of the changing cells is greater than that of the constraints
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
39
Use the following information to answer the question(s)below.
Cerebro Manufacturing produces four types of structural support fittings-plugs, rails, rivets, and clips-which are machined on two CNC machining centers.The machining centers have a capacity of 250,000 minutes per year.The gross margin per unit and machining requirements are shown in the spreadsheet below.
<strong>Use the following information to answer the question(s)below. Cerebro Manufacturing produces four types of structural support fittings-plugs, rails, rivets, and clips-which are machined on two CNC machining centers.The machining centers have a capacity of 250,000 minutes per year.The gross margin per unit and machining requirements are shown in the spreadsheet below.   What is the maximum possible production of rails based on the machine capacity?</strong> A)250,000.00 B)83,333.33 C)166,666.67 D)125,000.00
What is the maximum possible production of rails based on the machine capacity?

A)250,000.00
B)83,333.33
C)166,666.67
D)125,000.00
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
40
The ________ indicates how much the value of the objective function will change as the right-hand side of a constraint is increased by 1.

A)objective coefficient
B)shadow price
C)binding constraint
D)reduced cost
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
41
A constraint function is a function of the decision variables in the problem.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
42
What are the Excel functions to avoid in linear optimization?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
43
What are the two basic properties of a linear optimization model?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
44
Explain the simplex method used by Solver.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
45
What are the four possible outcomes that can be obtained by solving a linear optimization model?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
46
Infeasible problems can occur when the demand requirement is higher than the available capacity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
47
Whenever a constraint has positive slack, the shadow price is equal to one.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
48
What is the importance of Shadow Price in the Sensitivity Report?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
49
A binding constraint is one for which the Cell Value is greater than the right-hand side of the value of the constraint.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
50
Any solution that satisfies all constraints of a problem is called a feasible solution.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.