Deck 11: Practical Applications of Public Health Emergency Management

ملء الشاشة (f)
exit full mode
سؤال
When an objective of the response is met, what unit begins assessing whether resources can be sent home?

A) Resources Unit
B) Situation Unit
C) Demobilization Unit
D) Documentation Unit
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Which of the following serves as a conduit of information between agencies or organizations supporting the response?

A) Liaison officer
B) Incident commander
C) Deputy incident commander
D) Public information officer
سؤال
For which section of the ICS, communication includes radios, frequencies, and other communications equipment such as Wi-Fi devices, computers, and fax machines?

A) Operations Section
B) Planning Section
C) Logistics Section
D) Administrative/Finance Section
سؤال
If there are more than how many direct reports per supervisor, then they can be broken down into strike teams, tasks forces, and groups to allow for better supervision and accountability of personnel and resources?

A) Four
B) Five
C) Six
D) Seven
سؤال
The Fogging Operations Unit should be activated if which of the following is unable to be treated or eliminated after a disaster?

A) Debris
B) Pollution
C) Standing water
D) Wildfires
سؤال
If something happens during an event, it can then become an incident.
سؤال
The basic ICS structure contains a command group and a general staff group.
سؤال
The public information officer provides advice to the incident commander on the safety of responders and works with others within the ICS.
سؤال
Span of control means that there are usually three to seven persons working for one supervisor.
سؤال
All that is needed for an ICS to be activated is an incident commander.
سؤال
What member of the ICS command group will approve of all materials that are to be released by the response or briefed to the public or media?

A) Liaison officer
B) Incident commander
C) Deputy incident commander
D) Public information officer
سؤال
What section of the General Staff of the ICS usually has the most assets?

A) Operations Section
B) Planning Section
C) Logistics Section
D) Administrative/Financial Section
سؤال
Span of control means that there are usually how many persons working for one supervisor?

A) 1 to 3
B) 3 to 7
C) 7 to 10
D) 11 to 15
سؤال
The major units of what section of the General Staff of the ICS are the Resources Unit, the Situation Unit, the Demobilization Unit, the Documentation Unit, and the Technical Specialists?

A) Operations Section
B) Planning Section
C) Logistics Section
D) Administrative/Financial Section
سؤال
The Incident Command System (ICS) is a standardized system that can be used in any type of disaster.
سؤال
An event is something that happens that requires us to respond, whereas an incident is something we plan for in advance.
سؤال
Usually, the Logistics Section is the first section activated and to have assets assigned to the response.
سؤال
Human-caused disasters can include a biological, chemical, radiological, or nuclear attack.
سؤال
All community partners should be involved in the determination of threats and hazards.
سؤال
Which of the following is all that is needed for an ICS to be activated?

A) Liaison officer
B) Incident commander
C) Deputy incident commander
D) Public information officer
سؤال
The Fogging Operations unit will work with what Section to determine the best areas for street routing for foggers in the potentially affected area?

A) Operations Section
B) Planning Section
C) Logistics Section
D) Administrative/Finance Section
سؤال
Which of the following refers to something we can plan for in advance?

A) Event
B) Incident
C) Threat
D) Hazard
سؤال
Principals from what system would later become the ICS?

A) BioSense
B) BioWatch
C) ESSENCE
D) FIRESCOPE
سؤال
What unit within the Planning Section is responsible for collecting, analyzing, and displaying information for the response?

A) Resources Unit
B) Situation Unit
C) Demobilization Unit
D) Documentation Unit
سؤال
The idea behind the ICS is that the system is expandable or contractible based on the needs of the response.
سؤال
The Logistics Section is responsible for directing and coordinating all of the actual operations within the response.
سؤال
The optimal number for supervision in the Incident Command System is three direct reports per supervisor.
سؤال
The Resources Unit not only tracks personnel, but also tracks all of the equipment used during the response.
سؤال
Demobilization planning begins as soon as the response begins.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/29
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 11: Practical Applications of Public Health Emergency Management
1
When an objective of the response is met, what unit begins assessing whether resources can be sent home?

A) Resources Unit
B) Situation Unit
C) Demobilization Unit
D) Documentation Unit
C
2
Which of the following serves as a conduit of information between agencies or organizations supporting the response?

A) Liaison officer
B) Incident commander
C) Deputy incident commander
D) Public information officer
A
3
For which section of the ICS, communication includes radios, frequencies, and other communications equipment such as Wi-Fi devices, computers, and fax machines?

A) Operations Section
B) Planning Section
C) Logistics Section
D) Administrative/Finance Section
C
4
If there are more than how many direct reports per supervisor, then they can be broken down into strike teams, tasks forces, and groups to allow for better supervision and accountability of personnel and resources?

A) Four
B) Five
C) Six
D) Seven
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
5
The Fogging Operations Unit should be activated if which of the following is unable to be treated or eliminated after a disaster?

A) Debris
B) Pollution
C) Standing water
D) Wildfires
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
6
If something happens during an event, it can then become an incident.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
7
The basic ICS structure contains a command group and a general staff group.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
8
The public information officer provides advice to the incident commander on the safety of responders and works with others within the ICS.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
9
Span of control means that there are usually three to seven persons working for one supervisor.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
10
All that is needed for an ICS to be activated is an incident commander.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
11
What member of the ICS command group will approve of all materials that are to be released by the response or briefed to the public or media?

A) Liaison officer
B) Incident commander
C) Deputy incident commander
D) Public information officer
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
12
What section of the General Staff of the ICS usually has the most assets?

A) Operations Section
B) Planning Section
C) Logistics Section
D) Administrative/Financial Section
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
13
Span of control means that there are usually how many persons working for one supervisor?

A) 1 to 3
B) 3 to 7
C) 7 to 10
D) 11 to 15
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
14
The major units of what section of the General Staff of the ICS are the Resources Unit, the Situation Unit, the Demobilization Unit, the Documentation Unit, and the Technical Specialists?

A) Operations Section
B) Planning Section
C) Logistics Section
D) Administrative/Financial Section
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
15
The Incident Command System (ICS) is a standardized system that can be used in any type of disaster.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
16
An event is something that happens that requires us to respond, whereas an incident is something we plan for in advance.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
17
Usually, the Logistics Section is the first section activated and to have assets assigned to the response.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
18
Human-caused disasters can include a biological, chemical, radiological, or nuclear attack.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
19
All community partners should be involved in the determination of threats and hazards.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
20
Which of the following is all that is needed for an ICS to be activated?

A) Liaison officer
B) Incident commander
C) Deputy incident commander
D) Public information officer
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
21
The Fogging Operations unit will work with what Section to determine the best areas for street routing for foggers in the potentially affected area?

A) Operations Section
B) Planning Section
C) Logistics Section
D) Administrative/Finance Section
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
22
Which of the following refers to something we can plan for in advance?

A) Event
B) Incident
C) Threat
D) Hazard
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
23
Principals from what system would later become the ICS?

A) BioSense
B) BioWatch
C) ESSENCE
D) FIRESCOPE
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
24
What unit within the Planning Section is responsible for collecting, analyzing, and displaying information for the response?

A) Resources Unit
B) Situation Unit
C) Demobilization Unit
D) Documentation Unit
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
25
The idea behind the ICS is that the system is expandable or contractible based on the needs of the response.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
26
The Logistics Section is responsible for directing and coordinating all of the actual operations within the response.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
27
The optimal number for supervision in the Incident Command System is three direct reports per supervisor.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
28
The Resources Unit not only tracks personnel, but also tracks all of the equipment used during the response.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
29
Demobilization planning begins as soon as the response begins.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 29 في هذه المجموعة.