سؤال
Collaboration involves ________.

A) modifying activities to meet needs
B) sharing resources
C) exchanging information
D) All of the above
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
________ is an example of coordination.

A) Interdepartmental committees ensuring that goals are met
B) A task force organizing the activities of different agencies
C) The exchange of resources
D) Both a and b
سؤال
________ is collaborative.

A) A multi-disciplinary research team
B) A transdisciplinary research team
C) Independent research
D) Both a and b
سؤال
One disadvantage of collaboration is that ________.

A) a large proportion of the stakeholders will be unhappy with the outcome
B) it is a top-down approach
C) the common denominator is not always a good long-term decision
D) All of the above
سؤال
Manitoba's 1998 Sustainable Development Act explicitly recognizes ________ as an important component of sustainable development.

A) public responsibility
B) government participation
C) industrial responsibility
D) public participation
سؤال
In 2015, one of the principles outlined for sustainable development in Quebec focuses on _______.

A) identifying critical issues based on discussions with key stakeholders
B) participation and commitment from both citizens and citizen groups to develop a vision to facilitate environmental, social, and economic sustainability
C) commitment to ongoing, positive, and constructive dialogue with those in the tourism industry
D) creating forums for consultation and meaningful participation in decision-making processes
سؤال
Vernacular knowledge is developed through ________.

A) formal education
B) participatory processes
C) appropriate signage
D) information packages
سؤال
Power-sharing in environmental management can NOT ________.

A) achieve inter- and intra-generational equity
B) decrease self-determination
C) raise questions about accountability and responsibility
D) undermine regulatory authority
سؤال
In the 1980s, environmental management decisions ________.

A) became less likely to consider the advice of only one expert in the process
B) had become more complex
C) were criticized for not including enough factors
D) All of the above
سؤال
Specifically, Abu et al. (2019) used the concept of __________ to examine bringing together Western science and Indigenous knowledge by verifying accuracy and filling in knowledge gaps in each kind of understanding, without either being subsumed by the other.

A) participatory processes
B) two-eyed seeing
C) co-management
D) coordination
سؤال
________ approaches management as an experiment from which we learn by trial and error so that we can cope with the uncertain, the unexpected, and the unknown.

A) Adaptive environmental management
B) Risk assessment
C) Ecosystem management
D) Both a and c
سؤال
An example of a stakeholder is ________.

A) interested citizens
B) community groups
C) Indigenous peoples
D) All of the above
سؤال
The approach in which local citizens are genuinely allocated responsibility and authority for certain aspects of resource and environmental management is called ________.

A) authoritative management
B) selective management
C) co-management
D) targeted initiatives
سؤال
Asking the question "What do we not know, and why are we uncertain?" is an example of ________.

A) learning by doing
B) effective communication
C) an impact assessment
D) the participatory approach
سؤال
In Arnstein's ladder of citizen participation, ________ provides a high degree of citizen power, while ________ is essentially non-participatory.

A) delegation; therapy
B) delegation; placation
C) information; manipulation
D) consultation; information
سؤال
According to Arnstein's ladder of citizen participation, ________ indicates increasing citizen involvement.

A) manipulation, therapy, partnership, placation
B) manipulation, consultation, delegation, partnership
C) manipulation, consultation, partnership, delegation
D) information, delegation, partnership, citizen control
سؤال
The rung on the ladder of citizen participation in which citizens are given management responsibility for all or for parts of programs is called ________.

A) delegation
B) consultation
C) placation
D) citizen control
سؤال
According to Scott et al., (2000), the main purpose of communication is NOT ________.

A) to confer understanding
B) to raise awareness
C) to direct and influence
D) to motivate action
سؤال
Carpenter (1995) identifies the fact that ________ as being important to consider when communicating scientific information.

A) much of the public does not understand science
B) the media does not deal well with changes in scientific information
C) the public does not understand probability
D) All of the above
سؤال
One of the first steps in effectively communicating scientific understanding is ________.

A) to hold a press conference and getting the message out through the media
B) to recognize that different target audiences have different levels of understanding
C) to call a large public meeting for all interested parties
D) All of the above
سؤال
In 1980, Trist stated that there is no such thing as the future, only ________.

A) forecasting
B) alternative realities
C) alternative possible futures
D) past predictions
سؤال
One challenge in making choices and taking initiative is that ________ conditions have become increasingly prevalent.

A) ecosystem
B) homeostatic
C) static
D) turbulent
سؤال
Effective trial-and-error management has preconditions that "________" is NOT one of them.

A) the experiment must provide evidence
B) the experiment should not cause irreversible, negative changes to the environment
C) the experiment should not destroy the experimenter
D) the experimenter must have the will and capability to try again if the first experiment "fails"
سؤال
This statement about adaptive management is NOT true: ________.

A) surprise, uncertainty, and the unexpected are normal
B) expectations are not stated so that knowledge is derived from measurements
C) errors can lead to actions and plans
D) policies are experiments, and failed experiments generate knowledge
سؤال
Adaptive co-management features ________.

A) integration of different knowledge systems
B) learning by doing
C) collaboration and power-sharing
D) All of the above
سؤال
When used in adaptive co-management, the visioning process should promote ________.

A) transformability
B) existing policies
C) uncertainty
D) specific structures
سؤال
The risk of reliance on transformational leaders in adaptive co-management is that ________.

A) they might not consider all viewpoints
B) the initiative becomes vulnerable if they leave
C) they might be wrong
D) they may take over all control of the initiative
سؤال
Environmental impact assessments were NOT developed in response to ________.

A) increasing size and complexity of projects
B) growing demands by the public to become more involved in decision-making
C) government concerns over environmental degradation
D) greater uncertainty in predicting impacts
سؤال
Initially, environmental impact assessments focused on ________.

A) economic factors
B) policy outcomes
C) social concerns
D) biophysical impacts
سؤال
The process that focuses on determining the likelihood of an environmentally-negative event of special magnitude and the costs of dealing with the consequences is called ________.

A) risk assessment
B) the precautionary principle
C) adaptive management
D) environmental impact assessment
سؤال
An example of environmental risk assessment is ________.

A) establishing inclusion of a stakeholder group in negotiations if it is believed they will hold up a proposed development
B) deciding on a specific tool to use for logging to encourage ease of use and maximize efficiency
C) determining the probability that a songbird species will be extirpated due to the creation of a new dam
D) All of the above
سؤال
An example of the "precautionary principle" is ________.

A) doing nothing until more scientific evidence has been accumulated
B) acting on something if the bulk of scientific evidence suggests that action is needed, even if some knowledge is incomplete
C) taking small steps to mitigate the effects of the problem, rather than taking large radical steps that will solve or prevent the problem
D) taking action now to obtain full scientific evidence
سؤال
"Err on the side of caution" is another way of stating the ________.

A) cautionary tale
B) strategy of risk assessment
C) precautionary principle
D) concept of carrying capacity
سؤال
Environmental impact assessments are carried out for developments that ________.

A) have the potential for significant social impacts
B) have readily identifiable stakeholders that might be affected
C) have the potential for significant environmental impacts
D) All of the above
سؤال
Impact assessments for policies and programs are called ________.

A) strategic environmental assessments
B) precautionary assessments
C) strategic risk assessments
D) environmental impact assessments
سؤال
Impact assessments should be done ________.

A) after a project is complete
B) to determine best mitigation practices
C) early in the project planning process
D) once development has begun
سؤال
The Quebec provincial government engaging with the Innu First Nations over 30 years to reach an agreement for development in the two administrative regions of Saguenay-Lac-Saint-Jean and Côte-Nord is an example of _________.

A) traditional scientific knowledge
B) impact assessment
C) co-management
D) traditional ecological knowledge
سؤال
Public involvement benefits environmental impact analysis because ________.

A) it can contribute to positive social change
B) it helps broaden the range of issues and potential resolutions
C) it helps to make the process fair
D) All of the above
سؤال
If we are to improve our knowledge of the resiliency and recuperative powers of ecosystems, ________ is essential.

A) impact assessment
B) strong policies
C) monitoring
D) public participation
سؤال
The research facility in Northwestern Ontario famous for its work on eutrophication and acidification is called the ________.

A) Experimental Lakes Facility
B) Experimental Reservoir Area
C) Experimental Laboratory Area
D) Experimental Lakes Area
سؤال
From an environmental perspective, it is true that conflict ________.

A) can result in practical solutions to problems
B) can lead to misunderstandings and reinforce biases
C) can create stronger obstacles for the future
D) All of the above
سؤال
A sustainability assessment attempts to ________.

A) develop a greater number of resources on sustainability on the internet
B) more closely monitor courts, government agencies, and individuals
C) adopt sustainability objectives as core guides for evaluations and decisions
D) make engagement more accessible
سؤال
Sustainability assessment criteria does NOT include ________.

A) socio-ecological system integrity
B) financial responsibility
C) immediate and long-term integration
D) intragenerational equity
سؤال
The Taseko New Prosperity Mine project was rejected in 2010 as a result of _________.

A) international policy
B) environmental assessment
C) financial disputes
D) co-management
سؤال
After much conflict, the Alberta cabinet retaining authority of the oil sands ignored the opportunity of _________.

A) financial responsibility
B) resource management
C) public engagement
D) dispute resolution
سؤال
The traditional way of dealing with disputes in our society is ________.

A) judicial
B) administrative
C) public opinion
D) Both a and b
سؤال
________ is NOT an attribute of alternative dispute resolution.

A) The attainment of a long-lasting settlement
B) Assigning of blame that results in small to moderate legal punishment
C) Emphasizing issues and interests of involved parties
D) Constructive communication and improved understanding
سؤال
If resource managers can link recommendations to land-use plans, then ________.

A) there is no need to have a resource management plan
B) impacts statements are not necessary
C) it will reduce the number of agencies involved in implementing recommendations
D) there is a greater likelihood they will be implemented
سؤال
Negotiation, mediation, and arbitration are all ________.

A) similar to public consultation
B) types of alternative dispute resolution
C) standard for handling dispute resolution in Canada
D) last-minute approaches used only when necessary
سؤال
The challenges associated with moving from plans to implementation are referred to as the ________.

A) application divide
B) implementation divergence
C) action barrier
D) implementation gap
سؤال
Collaboration can contribute to solutions to which stakeholders feel committed.
سؤال
Coordination must occur before collaboration can begin.
سؤال
Collaboration and coordination are means to an end, not ends in themselves.
سؤال
Done well, collaboration involves sharing information and insight to achieve multiple goals.
سؤال
On the ladder of participation, consultation occurs when citizens are heard but not necessarily heeded.
سؤال
If scientists ignore or obscure uncertainties and are shown to be wrong, their credibility is at risk.
سؤال
Rapidly increased melting of sea ice in the Arctic and Antarctic over the past decade came as a surprise to many people.
سؤال
"Turbulent" conditions are becoming increasingly prevalent.
سؤال
Environmental impacts are common to all development initiatives.
سؤال
The precautionary principle suggests that decision-makers should use their discretion regarding whether or not to err on the side of caution.
سؤال
There is usually a specific "right" answer when it comes to using impact assessments.
سؤال
Many small developments in aggregate can have large cumulative environmental impacts.
سؤال
Monitoring is part of measuring the success of mitigation measures suggested by an impact assessment.
سؤال
Researchers at the Experimental Lakes Area discovered methane and CO2 emissions from reservoirs while testing for the impacts of hydroelectric generation.
سؤال
Both the provincial and federal environmental assessments conducted for the proposed mine near Fish Lake and Williams Lake, British Columbia, resulted in a rejection of the proposal.
سؤال
Explain collaboration and coordination. Why are they both necessary for effective resource management?
سؤال
What are stakeholders? How has the role of stakeholders evolved in recent decades?
سؤال
Outline the different rungs on Arnstein's Ladder of Citizen Participation.
سؤال
What are some of the difficulties involved with communicating scientific information to the public?
سؤال
What can be done to overcome the challenges of communicating science to a variety of different target audiences?
سؤال
What are the key features of adaptive co-management?
سؤال
What is the precautionary principle? Give an example of how the precautionary principle has NOT been implemented.
سؤال
Outline the Taseko Mines conflict in Fish Lake, B.C.. Why did this conflict occur?
سؤال
What are the strengths and weaknesses of the judicial method of dispute resolution? What dispute resolution methods could be used instead?
سؤال
Outline the alternative dispute resolution techniques.
1.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/75
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 7: Planning and Management: Processes and Methods
1
Collaboration involves ________.

A) modifying activities to meet needs
B) sharing resources
C) exchanging information
D) All of the above
D
2
________ is an example of coordination.

A) Interdepartmental committees ensuring that goals are met
B) A task force organizing the activities of different agencies
C) The exchange of resources
D) Both a and b
D
3
________ is collaborative.

A) A multi-disciplinary research team
B) A transdisciplinary research team
C) Independent research
D) Both a and b
D
4
One disadvantage of collaboration is that ________.

A) a large proportion of the stakeholders will be unhappy with the outcome
B) it is a top-down approach
C) the common denominator is not always a good long-term decision
D) All of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
5
Manitoba's 1998 Sustainable Development Act explicitly recognizes ________ as an important component of sustainable development.

A) public responsibility
B) government participation
C) industrial responsibility
D) public participation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
6
In 2015, one of the principles outlined for sustainable development in Quebec focuses on _______.

A) identifying critical issues based on discussions with key stakeholders
B) participation and commitment from both citizens and citizen groups to develop a vision to facilitate environmental, social, and economic sustainability
C) commitment to ongoing, positive, and constructive dialogue with those in the tourism industry
D) creating forums for consultation and meaningful participation in decision-making processes
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
7
Vernacular knowledge is developed through ________.

A) formal education
B) participatory processes
C) appropriate signage
D) information packages
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
8
Power-sharing in environmental management can NOT ________.

A) achieve inter- and intra-generational equity
B) decrease self-determination
C) raise questions about accountability and responsibility
D) undermine regulatory authority
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
9
In the 1980s, environmental management decisions ________.

A) became less likely to consider the advice of only one expert in the process
B) had become more complex
C) were criticized for not including enough factors
D) All of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
10
Specifically, Abu et al. (2019) used the concept of __________ to examine bringing together Western science and Indigenous knowledge by verifying accuracy and filling in knowledge gaps in each kind of understanding, without either being subsumed by the other.

A) participatory processes
B) two-eyed seeing
C) co-management
D) coordination
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
11
________ approaches management as an experiment from which we learn by trial and error so that we can cope with the uncertain, the unexpected, and the unknown.

A) Adaptive environmental management
B) Risk assessment
C) Ecosystem management
D) Both a and c
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
12
An example of a stakeholder is ________.

A) interested citizens
B) community groups
C) Indigenous peoples
D) All of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
13
The approach in which local citizens are genuinely allocated responsibility and authority for certain aspects of resource and environmental management is called ________.

A) authoritative management
B) selective management
C) co-management
D) targeted initiatives
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
14
Asking the question "What do we not know, and why are we uncertain?" is an example of ________.

A) learning by doing
B) effective communication
C) an impact assessment
D) the participatory approach
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
15
In Arnstein's ladder of citizen participation, ________ provides a high degree of citizen power, while ________ is essentially non-participatory.

A) delegation; therapy
B) delegation; placation
C) information; manipulation
D) consultation; information
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
16
According to Arnstein's ladder of citizen participation, ________ indicates increasing citizen involvement.

A) manipulation, therapy, partnership, placation
B) manipulation, consultation, delegation, partnership
C) manipulation, consultation, partnership, delegation
D) information, delegation, partnership, citizen control
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
17
The rung on the ladder of citizen participation in which citizens are given management responsibility for all or for parts of programs is called ________.

A) delegation
B) consultation
C) placation
D) citizen control
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
18
According to Scott et al., (2000), the main purpose of communication is NOT ________.

A) to confer understanding
B) to raise awareness
C) to direct and influence
D) to motivate action
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
19
Carpenter (1995) identifies the fact that ________ as being important to consider when communicating scientific information.

A) much of the public does not understand science
B) the media does not deal well with changes in scientific information
C) the public does not understand probability
D) All of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
20
One of the first steps in effectively communicating scientific understanding is ________.

A) to hold a press conference and getting the message out through the media
B) to recognize that different target audiences have different levels of understanding
C) to call a large public meeting for all interested parties
D) All of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
21
In 1980, Trist stated that there is no such thing as the future, only ________.

A) forecasting
B) alternative realities
C) alternative possible futures
D) past predictions
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
22
One challenge in making choices and taking initiative is that ________ conditions have become increasingly prevalent.

A) ecosystem
B) homeostatic
C) static
D) turbulent
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
23
Effective trial-and-error management has preconditions that "________" is NOT one of them.

A) the experiment must provide evidence
B) the experiment should not cause irreversible, negative changes to the environment
C) the experiment should not destroy the experimenter
D) the experimenter must have the will and capability to try again if the first experiment "fails"
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
24
This statement about adaptive management is NOT true: ________.

A) surprise, uncertainty, and the unexpected are normal
B) expectations are not stated so that knowledge is derived from measurements
C) errors can lead to actions and plans
D) policies are experiments, and failed experiments generate knowledge
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
25
Adaptive co-management features ________.

A) integration of different knowledge systems
B) learning by doing
C) collaboration and power-sharing
D) All of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
26
When used in adaptive co-management, the visioning process should promote ________.

A) transformability
B) existing policies
C) uncertainty
D) specific structures
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
27
The risk of reliance on transformational leaders in adaptive co-management is that ________.

A) they might not consider all viewpoints
B) the initiative becomes vulnerable if they leave
C) they might be wrong
D) they may take over all control of the initiative
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
28
Environmental impact assessments were NOT developed in response to ________.

A) increasing size and complexity of projects
B) growing demands by the public to become more involved in decision-making
C) government concerns over environmental degradation
D) greater uncertainty in predicting impacts
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
29
Initially, environmental impact assessments focused on ________.

A) economic factors
B) policy outcomes
C) social concerns
D) biophysical impacts
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
30
The process that focuses on determining the likelihood of an environmentally-negative event of special magnitude and the costs of dealing with the consequences is called ________.

A) risk assessment
B) the precautionary principle
C) adaptive management
D) environmental impact assessment
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
31
An example of environmental risk assessment is ________.

A) establishing inclusion of a stakeholder group in negotiations if it is believed they will hold up a proposed development
B) deciding on a specific tool to use for logging to encourage ease of use and maximize efficiency
C) determining the probability that a songbird species will be extirpated due to the creation of a new dam
D) All of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
32
An example of the "precautionary principle" is ________.

A) doing nothing until more scientific evidence has been accumulated
B) acting on something if the bulk of scientific evidence suggests that action is needed, even if some knowledge is incomplete
C) taking small steps to mitigate the effects of the problem, rather than taking large radical steps that will solve or prevent the problem
D) taking action now to obtain full scientific evidence
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
33
"Err on the side of caution" is another way of stating the ________.

A) cautionary tale
B) strategy of risk assessment
C) precautionary principle
D) concept of carrying capacity
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
34
Environmental impact assessments are carried out for developments that ________.

A) have the potential for significant social impacts
B) have readily identifiable stakeholders that might be affected
C) have the potential for significant environmental impacts
D) All of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
35
Impact assessments for policies and programs are called ________.

A) strategic environmental assessments
B) precautionary assessments
C) strategic risk assessments
D) environmental impact assessments
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
36
Impact assessments should be done ________.

A) after a project is complete
B) to determine best mitigation practices
C) early in the project planning process
D) once development has begun
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
37
The Quebec provincial government engaging with the Innu First Nations over 30 years to reach an agreement for development in the two administrative regions of Saguenay-Lac-Saint-Jean and Côte-Nord is an example of _________.

A) traditional scientific knowledge
B) impact assessment
C) co-management
D) traditional ecological knowledge
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
38
Public involvement benefits environmental impact analysis because ________.

A) it can contribute to positive social change
B) it helps broaden the range of issues and potential resolutions
C) it helps to make the process fair
D) All of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
39
If we are to improve our knowledge of the resiliency and recuperative powers of ecosystems, ________ is essential.

A) impact assessment
B) strong policies
C) monitoring
D) public participation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
40
The research facility in Northwestern Ontario famous for its work on eutrophication and acidification is called the ________.

A) Experimental Lakes Facility
B) Experimental Reservoir Area
C) Experimental Laboratory Area
D) Experimental Lakes Area
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
41
From an environmental perspective, it is true that conflict ________.

A) can result in practical solutions to problems
B) can lead to misunderstandings and reinforce biases
C) can create stronger obstacles for the future
D) All of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
42
A sustainability assessment attempts to ________.

A) develop a greater number of resources on sustainability on the internet
B) more closely monitor courts, government agencies, and individuals
C) adopt sustainability objectives as core guides for evaluations and decisions
D) make engagement more accessible
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
43
Sustainability assessment criteria does NOT include ________.

A) socio-ecological system integrity
B) financial responsibility
C) immediate and long-term integration
D) intragenerational equity
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
44
The Taseko New Prosperity Mine project was rejected in 2010 as a result of _________.

A) international policy
B) environmental assessment
C) financial disputes
D) co-management
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
45
After much conflict, the Alberta cabinet retaining authority of the oil sands ignored the opportunity of _________.

A) financial responsibility
B) resource management
C) public engagement
D) dispute resolution
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
46
The traditional way of dealing with disputes in our society is ________.

A) judicial
B) administrative
C) public opinion
D) Both a and b
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
47
________ is NOT an attribute of alternative dispute resolution.

A) The attainment of a long-lasting settlement
B) Assigning of blame that results in small to moderate legal punishment
C) Emphasizing issues and interests of involved parties
D) Constructive communication and improved understanding
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
48
If resource managers can link recommendations to land-use plans, then ________.

A) there is no need to have a resource management plan
B) impacts statements are not necessary
C) it will reduce the number of agencies involved in implementing recommendations
D) there is a greater likelihood they will be implemented
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
49
Negotiation, mediation, and arbitration are all ________.

A) similar to public consultation
B) types of alternative dispute resolution
C) standard for handling dispute resolution in Canada
D) last-minute approaches used only when necessary
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
50
The challenges associated with moving from plans to implementation are referred to as the ________.

A) application divide
B) implementation divergence
C) action barrier
D) implementation gap
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
51
Collaboration can contribute to solutions to which stakeholders feel committed.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
52
Coordination must occur before collaboration can begin.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
53
Collaboration and coordination are means to an end, not ends in themselves.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
54
Done well, collaboration involves sharing information and insight to achieve multiple goals.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
55
On the ladder of participation, consultation occurs when citizens are heard but not necessarily heeded.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
56
If scientists ignore or obscure uncertainties and are shown to be wrong, their credibility is at risk.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
57
Rapidly increased melting of sea ice in the Arctic and Antarctic over the past decade came as a surprise to many people.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
58
"Turbulent" conditions are becoming increasingly prevalent.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
59
Environmental impacts are common to all development initiatives.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
60
The precautionary principle suggests that decision-makers should use their discretion regarding whether or not to err on the side of caution.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
61
There is usually a specific "right" answer when it comes to using impact assessments.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
62
Many small developments in aggregate can have large cumulative environmental impacts.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
63
Monitoring is part of measuring the success of mitigation measures suggested by an impact assessment.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
64
Researchers at the Experimental Lakes Area discovered methane and CO2 emissions from reservoirs while testing for the impacts of hydroelectric generation.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
65
Both the provincial and federal environmental assessments conducted for the proposed mine near Fish Lake and Williams Lake, British Columbia, resulted in a rejection of the proposal.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
66
Explain collaboration and coordination. Why are they both necessary for effective resource management?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
67
What are stakeholders? How has the role of stakeholders evolved in recent decades?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
68
Outline the different rungs on Arnstein's Ladder of Citizen Participation.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
69
What are some of the difficulties involved with communicating scientific information to the public?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
70
What can be done to overcome the challenges of communicating science to a variety of different target audiences?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
71
What are the key features of adaptive co-management?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
72
What is the precautionary principle? Give an example of how the precautionary principle has NOT been implemented.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
73
Outline the Taseko Mines conflict in Fish Lake, B.C.. Why did this conflict occur?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
74
What are the strengths and weaknesses of the judicial method of dispute resolution? What dispute resolution methods could be used instead?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 75 في هذه المجموعة.
فتح الحزمة
k this deck
75
Outline the alternative dispute resolution techniques.