The maximum possible output of an operation is known as the ______________?

A) Effective capacity
B) Design capacity
C) Theoretical capacity
D) Expected capacity
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
The actual output from an operation is known as the __________________?

A) Effective capacity
B) Design capacity
C) Achieved capacity
D) Expected capacity
سؤال
How is the efficiency of an operation measured?

A) Achieved capacity/Design capacity
B) Effective capacity/ Design capacity
C) Achieved capacity/Effective capacity
D) Effective capacity/Achieved capacity
سؤال
If an operation has a design capacity of 168 hours, a planned downtime of 42 hours and an unplanned downtime of 6 hours, what is its efficiency?

A) 71.4%
B) 95.2%
C) 85.1%
D) 75.3%
سؤال
A measure which takes into account availability of equipment, performance output and the quality of output is called _________________?

A) Overall Machine Efficiency
B) Overall Machine Utilization
C) Overall Equipment Effectiveness
D) Overall Design Effectiveness
سؤال
A qualitative method of forecasting demand is ________________?

A) Moving average
B) Exponential smoothing
C) Delphi method
D) Regression analysis
سؤال
A method of looking back at previous data to predict the future demand is _______________________?

A) Moving average
B) Scenario planning
C) Delphi method
D) Regression analysis
سؤال
Which of the following is an advantage of a level capacity strategy?

A) Output levels can be varied in line with demand
B) Output levels are predictable
C) Customer order levels are predictable
D) There is always enough capacity to meet demand
سؤال
Arranging flexible working shifts for employees in a retail operation is an example of ____________________?

A) A chase demand strategy
B) A demand management strategy
C) A level capacity strategy
D) A capacity lagging strategy
سؤال
Advertising certain products at reduced prices is an example of which type of capacity strategy?

A) Level capacity
B) Chase demand
C) Demand management
D) Capacity leading
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/10
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 7: Managing Capacity and Demand
1
The maximum possible output of an operation is known as the ______________?

A) Effective capacity
B) Design capacity
C) Theoretical capacity
D) Expected capacity
B
2
The actual output from an operation is known as the __________________?

A) Effective capacity
B) Design capacity
C) Achieved capacity
D) Expected capacity
C
3
How is the efficiency of an operation measured?

A) Achieved capacity/Design capacity
B) Effective capacity/ Design capacity
C) Achieved capacity/Effective capacity
D) Effective capacity/Achieved capacity
C
4
If an operation has a design capacity of 168 hours, a planned downtime of 42 hours and an unplanned downtime of 6 hours, what is its efficiency?

A) 71.4%
B) 95.2%
C) 85.1%
D) 75.3%
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
5
A measure which takes into account availability of equipment, performance output and the quality of output is called _________________?

A) Overall Machine Efficiency
B) Overall Machine Utilization
C) Overall Equipment Effectiveness
D) Overall Design Effectiveness
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
6
A qualitative method of forecasting demand is ________________?

A) Moving average
B) Exponential smoothing
C) Delphi method
D) Regression analysis
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
7
A method of looking back at previous data to predict the future demand is _______________________?

A) Moving average
B) Scenario planning
C) Delphi method
D) Regression analysis
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
8
Which of the following is an advantage of a level capacity strategy?

A) Output levels can be varied in line with demand
B) Output levels are predictable
C) Customer order levels are predictable
D) There is always enough capacity to meet demand
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
9
Arranging flexible working shifts for employees in a retail operation is an example of ____________________?

A) A chase demand strategy
B) A demand management strategy
C) A level capacity strategy
D) A capacity lagging strategy
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
10
Advertising certain products at reduced prices is an example of which type of capacity strategy?

A) Level capacity
B) Chase demand
C) Demand management
D) Capacity leading