Deck 4: Locating, Designing, and Managing Facilities

ملء الشاشة (f)
exit full mode
سؤال
Which of these is not a primary factor for locating a manufacturing facility such as an automotive assembly plant

A) Access to raw materials
B) Access to labour
C) Availability of energy supply
D) Proximity of customers
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Which of these operations would consider the proximity of customers as a primary factor in choosing a location?

A) A domestic appliance manufacturer
B) An oil refinery
C) A solicitor's office
D) An insurance company headquarters
سؤال
What technique would a supermarket choose in order to locate one of their distribution centres?

A) Weighted factor analysis
B) Location intelligence
C) Centre of gravity method
D) Regression modelling
سؤال
The four layout choices for a typical materials processing operation are fixed position, process, product, and _________ layout?

A) Flexible
B) Cell
C) Linear
D) Variable position
سؤال
Which type of layout would be required for a shipbuilding operation?

A) Fixed position
B) Process
C) Cell
D) Product
سؤال
Which type of layout would be most suitable for a domestic appliance assembly operation?

A) Fixed position
B) Process
C) Cell
D) Product
سؤال
In a flight catering kitchen what is the main benefit for changing from a product layout to a cell layout?

A) Increased speed
B) Improved quality
C) Improved cost
D) Reduced labour
سؤال
The Servicescape is the term used to describe ______________?

A) The ambience at the entrance to an operation
B) The ambience at the exit from an operation
C) The physical and psychological environment of the operation
D) The signs and signals used to orient customers around an operation
سؤال
Deciding to get another company to manufacture goods originally made by your company is called __________________?

A) Procurement
B) Outsourcing
C) Offshoring
D) Logistics
سؤال
The separation of the front of house activities from the back of house activities, such as the central production of food for a number of schools is called _______________?

A) Decentralisation
B) Delayering
C) Disintermediating
D) Decoupling
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/10
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 4: Locating, Designing, and Managing Facilities
1
Which of these is not a primary factor for locating a manufacturing facility such as an automotive assembly plant

A) Access to raw materials
B) Access to labour
C) Availability of energy supply
D) Proximity of customers
D
2
Which of these operations would consider the proximity of customers as a primary factor in choosing a location?

A) A domestic appliance manufacturer
B) An oil refinery
C) A solicitor's office
D) An insurance company headquarters
C
3
What technique would a supermarket choose in order to locate one of their distribution centres?

A) Weighted factor analysis
B) Location intelligence
C) Centre of gravity method
D) Regression modelling
C
4
The four layout choices for a typical materials processing operation are fixed position, process, product, and _________ layout?

A) Flexible
B) Cell
C) Linear
D) Variable position
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
5
Which type of layout would be required for a shipbuilding operation?

A) Fixed position
B) Process
C) Cell
D) Product
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
6
Which type of layout would be most suitable for a domestic appliance assembly operation?

A) Fixed position
B) Process
C) Cell
D) Product
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
7
In a flight catering kitchen what is the main benefit for changing from a product layout to a cell layout?

A) Increased speed
B) Improved quality
C) Improved cost
D) Reduced labour
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
8
The Servicescape is the term used to describe ______________?

A) The ambience at the entrance to an operation
B) The ambience at the exit from an operation
C) The physical and psychological environment of the operation
D) The signs and signals used to orient customers around an operation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
9
Deciding to get another company to manufacture goods originally made by your company is called __________________?

A) Procurement
B) Outsourcing
C) Offshoring
D) Logistics
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
10
The separation of the front of house activities from the back of house activities, such as the central production of food for a number of schools is called _______________?

A) Decentralisation
B) Delayering
C) Disintermediating
D) Decoupling
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.