Deck 7: Operations Management and Quality

ملء الشاشة (f)
exit full mode
سؤال
The master production schedule shows which products will be produced and when the production will take place.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Follow-up means checking to ensure that production decisions are being implemented and is a key and ongoing facet of operations.
سؤال
Total quality management includes all the activities necessary for getting quality goods and services into the marketplace.
سؤال
In a low-contact system,the customer need not be a part of the system to receive the service.
سؤال
A firm's capacity depends on both how many people it employs and the number and size of its facilities.
سؤال
ISO 9000 is a certification program attesting to the fact that a factory,laboratory,or office has improved its environmental performance.
سؤال
The American Society for Quality defines quality in terms of manufactured goods,rather than including services.
سؤال
Getting a haircut and having your lawn mowed are both examples of low-contact services.
سؤال
Operations managers do not always work in production facilities; farmers,for example,can be considered operations managers.
سؤال
Reengineering is the process by which a company implements the best practices from its own past performance and those of other companies to improve its own products.
سؤال
If parts A,B,and C must be produced this week,a detailed schedule will indicate the sequence of work.
سؤال
Over time,firms tend to achieve more than one competence.
سؤال
Quality improvement teams are groups of employees from various work areas who define,analyze,and solve common production problems.
سؤال
Materials management is the process of monitoring production performance by comparing results with plans and taking corrective action when needed.
سؤال
Business process reengineering focuses on improving all steps of business processes.
سؤال
Operations managers never directly control costs or inventory.
سؤال
Intangibles are not used in judging service quality; instead,a consumer's focus is on tangibles.
سؤال
Each stage in the supply chain adds value for the final customer.
سؤال
Firms that make tangible projects are engaged in goods production.
سؤال
The amount of a product that a company can produce under normal working conditions is its capacity.
سؤال
JIT production systems normally require large amounts of "safety stock" to be maintained in a firm's warehouse.
سؤال
By turning raw materials into finished goods,production creates form utility.
سؤال
An assembly line is an example of a custom-products layout.
سؤال
In a same-steps layout,equipment and people are set up to produce one type of good in a fixed sequence of steps and are arranged according to its production requirements.
سؤال
A process flow chart identifies the sequence of production activities,movements of materials,and work performed at each stage of the process.
سؤال
Materials management involves the flow of materials inside of the production facility,while distribution management involves the flow of finished goods.
سؤال
When a company turns out ornaments in time for Christmas,it creates time utility.
سؤال
Successful companies,such as 3M and FedEx,use the same operations strategy.
سؤال
Staff schedules identify which products will be produced and when.
سؤال
Operations capability is a special ability that production does especially well to outperform the competition.
سؤال
Japanese companies adapted the concept of quality circles from quality improvement teams used by U.S.companies.
سؤال
The goal of supply chain management is better overall flow in the system.
سؤال
An example of make-to-order operations is a hand-knit Irish sweater purchased in an upscale department store.
سؤال
Make-to-order shops are also called job shops.
سؤال
Services are typically characterized by a high degree of unstorability.
سؤال
ISO 9000 is a certification program attesting that a factory,laboratory,or office has met the rigorous requirements set by the International Organization for Standardization.
سؤال
Services are more tangible,more customized,and less storable than most products.
سؤال
The goal of supply chain management is to reduce the number of links in the channel.
سؤال
A Gantt chart breaks down large projects into steps to be performed and the time required to perform each is left up to the project manager.
سؤال
A company typically selects the kind of production used by most of its competitors.
سؤال
Quality planning involves a push toward the continued improvement of both products and production methods.
سؤال
Because supply chain strategy is based on the collective effort of a number of firms,no one firm in the chain gains a competitive advantage.
سؤال
ISO 14000 may result in a recycling program at a company.
سؤال
Managers of Restaurant A eat at a competing restaurant in order to identify desirable improvements in their own operations; this illustrates quality ownership.
سؤال
Even excellent firms focus on one competence at a time.
سؤال
Value-added analysis might focus on both the elimination of waste and cost minimization.
سؤال
The term ________ refers to all the activities involved in making products,goods and services,for customers.

A) operations
B) processes
C) planning
D) scheduling
سؤال
A value chain includes an entire network of firms ,beginning with suppliers and ending when production is complete.
سؤال
The sales department relies on the engineering department to send samples and quotes to prospective customers on a timely basis; the sales department may be considered the engineering department's internal customer.
سؤال
________ is the ability of a product to satisfy a human want.

A) Utility
B) Relative advantage
C) Content
D) Satisfaction
سؤال
The biggest challenge of TQM is motivating employees throughout the company to achieve quality goals.
سؤال
________ utility is created when a company makes products available when consumers want them.

A) Time
B) Place
C) Possession
D) Form
سؤال
Operations control includes materials management and quality control.
سؤال
According to the text,to ensure that truckloads of merchandise flow quickly to stores (regarded as customers),Wal-Mart distribution centers are located near the hundreds of stores that they supply,not near the companies that supply them.
سؤال
For manufacturing firms,typical materials costs make up 50 to 75 percent of total product costs.
سؤال
A detailed schedule will indicate how many employees will be working on a given shift.
سؤال
________ is the systematic direction and control of the processes that transform resources into finished products.

A) Marketing
B) Operations management
C) Control
D) Methods management
سؤال
Most service operations provide combinations of ________.

A) low- and high-contact systems
B) make-to-stock and make-to-order operations
C) high and low quality levels
D) goods and services
سؤال
Long-range capacity planning considers both current and future capacity requirements.
سؤال
________ utility is created when a company makes products available where consumers want them.

A) Time
B) Place
C) Possession
D) Form
سؤال
________ refers to the sameness of product quality from unit to unit.

A) Consistency
B) Reliability
C) Performance
D) Quality control
سؤال
Which of the following is NOT a component of materials management?

A) supplier selection
B) transportation
C) advertising
D) warehousing
سؤال
A ________ breaks down large projects into steps to be performed and specifies the time required to perform each one.

A) Myers graphic
B) critical path chart
C) Gantt chart
D) process analysis graph
سؤال
________ refers to how well the product does what it is supposed to do.

A) Consistency
B) Reliability
C) Performance
D) Quality control
سؤال
________ is the acquisition of the raw materials a company needs to produce its products.

A) Development
B) Purchasing
C) Goods control
D) Quality control
سؤال
The customer must be present in ________.

A) a low-contact system
B) a high-contact system
C) a service operation
D) any system
سؤال
Which of the following is a major objective of JIT production?

A) reduction of goods in process
B) elimination of disruptions by continuous improvement
C) unnecessary inventory levels
D) all of the above
سؤال
Operations control requires production managers to monitor production performance by ________.

A) comparing results with detailed plans and schedules
B) checking on each worker on the production floor
C) observing activities from a platform above the workers
D) constantly talking with employees involved
سؤال
In a ________ layout for production,equipment and people are grouped according to function.

A) cellular
B) same-steps
C) custom-products
D) service
سؤال
Examining step-by-step procedures to reduce inefficiency involves an approach called ________.

A) operations scheduling
B) reengineering
C) value-added analysis
D) methods improvement
سؤال
In a ________ system,the customer does not need to be a part of the system to receive the service.

A) high-contact
B) low-contact
C) conversion
D) quality
سؤال
Thousands of empty jugs move down a conveyor belt at Colgate-Palmolive before stopping to be filled and moving on to be labeled.What type of layout is utilized?

A) same-steps
B) custom-products
C) hybrid
D) fixed-position
سؤال
At XYZ Enterprises,cloth is cut in the front room of the facility.The cut cloth then moves to the sewing department in the back room.What type of layout is utilized?

A) product
B) custom-products
C) same-steps
D) fixed-position
سؤال
In ________,products are made according to customer specifications.

A) make-to-stock operations
B) make-to-order operations
C) a low-contact system
D) a value chain
سؤال
________ systems are designed for smooth production flow that avoid inefficiencies,eliminate unnecessary inventories,and continuously improve production processes.

A) Lean
B) Managed
C) Production
D) Flexible
سؤال
A(n)________ is a set of methods and technologies used in the production of a good or service.

A) operations process
B) production episode
C) reduction
D) methods plan
سؤال
In a ________ system,the customer is part of the system during service delivery.

A) high-contact
B) low-contact
C) customer
D) quality
سؤال
________ is a special ability that production does especially well to outperform the competition.

A) Supply chain management
B) Total quality management
C) Process engineering
D) Operations capability
سؤال
The amount of a product that a company can produce under normal working conditions is its ________.

A) capacity
B) output
C) efficiency
D) burden
سؤال
________ includes the receiving,storing,handling,and counting of all raw materials,partly finished goods,and finished goods.

A) Materials handling
B) Inventory control
C) Quality control
D) None of the above
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/199
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 7: Operations Management and Quality
1
The master production schedule shows which products will be produced and when the production will take place.
True
2
Follow-up means checking to ensure that production decisions are being implemented and is a key and ongoing facet of operations.
True
3
Total quality management includes all the activities necessary for getting quality goods and services into the marketplace.
True
4
In a low-contact system,the customer need not be a part of the system to receive the service.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 199 في هذه المجموعة.
فتح الحزمة
k this deck
5
A firm's capacity depends on both how many people it employs and the number and size of its facilities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 199 في هذه المجموعة.
فتح الحزمة
k this deck
6
ISO 9000 is a certification program attesting to the fact that a factory,laboratory,or office has improved its environmental performance.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 199 في هذه المجموعة.
فتح الحزمة
k this deck
7
The American Society for Quality defines quality in terms of manufactured goods,rather than including services.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 199 في هذه المجموعة.
فتح الحزمة
k this deck
8
Getting a haircut and having your lawn mowed are both examples of low-contact services.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 199 في هذه المجموعة.
فتح الحزمة
k this deck
9
Operations managers do not always work in production facilities; farmers,for example,can be considered operations managers.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 199 في هذه المجموعة.
فتح الحزمة
k this deck
10
Reengineering is the process by which a company implements the best practices from its own past performance and those of other companies to improve its own products.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 199 في هذه المجموعة.
فتح الحزمة
k this deck
11
If parts A,B,and C must be produced this week,a detailed schedule will indicate the sequence of work.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 199 في هذه المجموعة.
فتح الحزمة
k this deck
12
Over time,firms tend to achieve more than one competence.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 199 في هذه المجموعة.
فتح الحزمة
k this deck
13
Quality improvement teams are groups of employees from various work areas who define,analyze,and solve common production problems.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 199 في هذه المجموعة.
فتح الحزمة
k this deck
14
Materials management is the process of monitoring production performance by comparing results with plans and taking corrective action when needed.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 199 في هذه المجموعة.
فتح الحزمة
k this deck
15
Business process reengineering focuses on improving all steps of business processes.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 199 في هذه المجموعة.
فتح الحزمة
k this deck
16
Operations managers never directly control costs or inventory.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 199 في هذه المجموعة.
فتح الحزمة
k this deck
17
Intangibles are not used in judging service quality; instead,a consumer's focus is on tangibles.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 199 في هذه المجموعة.
فتح الحزمة
k this deck
18
Each stage in the supply chain adds value for the final customer.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 199 في هذه المجموعة.
فتح الحزمة
k this deck
19
Firms that make tangible projects are engaged in goods production.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 199 في هذه المجموعة.
فتح الحزمة
k this deck
20
The amount of a product that a company can produce under normal working conditions is its capacity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 199 في هذه المجموعة.
فتح الحزمة
k this deck
21
JIT production systems normally require large amounts of "safety stock" to be maintained in a firm's warehouse.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 199 في هذه المجموعة.
فتح الحزمة
k this deck
22
By turning raw materials into finished goods,production creates form utility.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 199 في هذه المجموعة.
فتح الحزمة
k this deck
23
An assembly line is an example of a custom-products layout.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 199 في هذه المجموعة.
فتح الحزمة
k this deck
24
In a same-steps layout,equipment and people are set up to produce one type of good in a fixed sequence of steps and are arranged according to its production requirements.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 199 في هذه المجموعة.
فتح الحزمة
k this deck
25
A process flow chart identifies the sequence of production activities,movements of materials,and work performed at each stage of the process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 199 في هذه المجموعة.
فتح الحزمة
k this deck
26
Materials management involves the flow of materials inside of the production facility,while distribution management involves the flow of finished goods.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 199 في هذه المجموعة.
فتح الحزمة
k this deck
27
When a company turns out ornaments in time for Christmas,it creates time utility.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 199 في هذه المجموعة.
فتح الحزمة
k this deck
28
Successful companies,such as 3M and FedEx,use the same operations strategy.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 199 في هذه المجموعة.
فتح الحزمة
k this deck
29
Staff schedules identify which products will be produced and when.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 199 في هذه المجموعة.
فتح الحزمة
k this deck
30
Operations capability is a special ability that production does especially well to outperform the competition.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 199 في هذه المجموعة.
فتح الحزمة
k this deck
31
Japanese companies adapted the concept of quality circles from quality improvement teams used by U.S.companies.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 199 في هذه المجموعة.
فتح الحزمة
k this deck
32
The goal of supply chain management is better overall flow in the system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 199 في هذه المجموعة.
فتح الحزمة
k this deck
33
An example of make-to-order operations is a hand-knit Irish sweater purchased in an upscale department store.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 199 في هذه المجموعة.
فتح الحزمة
k this deck
34
Make-to-order shops are also called job shops.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 199 في هذه المجموعة.
فتح الحزمة
k this deck
35
Services are typically characterized by a high degree of unstorability.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 199 في هذه المجموعة.
فتح الحزمة
k this deck
36
ISO 9000 is a certification program attesting that a factory,laboratory,or office has met the rigorous requirements set by the International Organization for Standardization.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 199 في هذه المجموعة.
فتح الحزمة
k this deck
37
Services are more tangible,more customized,and less storable than most products.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 199 في هذه المجموعة.
فتح الحزمة
k this deck
38
The goal of supply chain management is to reduce the number of links in the channel.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 199 في هذه المجموعة.
فتح الحزمة
k this deck
39
A Gantt chart breaks down large projects into steps to be performed and the time required to perform each is left up to the project manager.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 199 في هذه المجموعة.
فتح الحزمة
k this deck
40
A company typically selects the kind of production used by most of its competitors.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 199 في هذه المجموعة.
فتح الحزمة
k this deck
41
Quality planning involves a push toward the continued improvement of both products and production methods.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 199 في هذه المجموعة.
فتح الحزمة
k this deck
42
Because supply chain strategy is based on the collective effort of a number of firms,no one firm in the chain gains a competitive advantage.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 199 في هذه المجموعة.
فتح الحزمة
k this deck
43
ISO 14000 may result in a recycling program at a company.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 199 في هذه المجموعة.
فتح الحزمة
k this deck
44
Managers of Restaurant A eat at a competing restaurant in order to identify desirable improvements in their own operations; this illustrates quality ownership.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 199 في هذه المجموعة.
فتح الحزمة
k this deck
45
Even excellent firms focus on one competence at a time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 199 في هذه المجموعة.
فتح الحزمة
k this deck
46
Value-added analysis might focus on both the elimination of waste and cost minimization.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 199 في هذه المجموعة.
فتح الحزمة
k this deck
47
The term ________ refers to all the activities involved in making products,goods and services,for customers.

A) operations
B) processes
C) planning
D) scheduling
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 199 في هذه المجموعة.
فتح الحزمة
k this deck
48
A value chain includes an entire network of firms ,beginning with suppliers and ending when production is complete.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 199 في هذه المجموعة.
فتح الحزمة
k this deck
49
The sales department relies on the engineering department to send samples and quotes to prospective customers on a timely basis; the sales department may be considered the engineering department's internal customer.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 199 في هذه المجموعة.
فتح الحزمة
k this deck
50
________ is the ability of a product to satisfy a human want.

A) Utility
B) Relative advantage
C) Content
D) Satisfaction
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 199 في هذه المجموعة.
فتح الحزمة
k this deck
51
The biggest challenge of TQM is motivating employees throughout the company to achieve quality goals.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 199 في هذه المجموعة.
فتح الحزمة
k this deck
52
________ utility is created when a company makes products available when consumers want them.

A) Time
B) Place
C) Possession
D) Form
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 199 في هذه المجموعة.
فتح الحزمة
k this deck
53
Operations control includes materials management and quality control.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 199 في هذه المجموعة.
فتح الحزمة
k this deck
54
According to the text,to ensure that truckloads of merchandise flow quickly to stores (regarded as customers),Wal-Mart distribution centers are located near the hundreds of stores that they supply,not near the companies that supply them.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 199 في هذه المجموعة.
فتح الحزمة
k this deck
55
For manufacturing firms,typical materials costs make up 50 to 75 percent of total product costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 199 في هذه المجموعة.
فتح الحزمة
k this deck
56
A detailed schedule will indicate how many employees will be working on a given shift.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 199 في هذه المجموعة.
فتح الحزمة
k this deck
57
________ is the systematic direction and control of the processes that transform resources into finished products.

A) Marketing
B) Operations management
C) Control
D) Methods management
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 199 في هذه المجموعة.
فتح الحزمة
k this deck
58
Most service operations provide combinations of ________.

A) low- and high-contact systems
B) make-to-stock and make-to-order operations
C) high and low quality levels
D) goods and services
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 199 في هذه المجموعة.
فتح الحزمة
k this deck
59
Long-range capacity planning considers both current and future capacity requirements.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 199 في هذه المجموعة.
فتح الحزمة
k this deck
60
________ utility is created when a company makes products available where consumers want them.

A) Time
B) Place
C) Possession
D) Form
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 199 في هذه المجموعة.
فتح الحزمة
k this deck
61
________ refers to the sameness of product quality from unit to unit.

A) Consistency
B) Reliability
C) Performance
D) Quality control
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 199 في هذه المجموعة.
فتح الحزمة
k this deck
62
Which of the following is NOT a component of materials management?

A) supplier selection
B) transportation
C) advertising
D) warehousing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 199 في هذه المجموعة.
فتح الحزمة
k this deck
63
A ________ breaks down large projects into steps to be performed and specifies the time required to perform each one.

A) Myers graphic
B) critical path chart
C) Gantt chart
D) process analysis graph
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 199 في هذه المجموعة.
فتح الحزمة
k this deck
64
________ refers to how well the product does what it is supposed to do.

A) Consistency
B) Reliability
C) Performance
D) Quality control
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 199 في هذه المجموعة.
فتح الحزمة
k this deck
65
________ is the acquisition of the raw materials a company needs to produce its products.

A) Development
B) Purchasing
C) Goods control
D) Quality control
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 199 في هذه المجموعة.
فتح الحزمة
k this deck
66
The customer must be present in ________.

A) a low-contact system
B) a high-contact system
C) a service operation
D) any system
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 199 في هذه المجموعة.
فتح الحزمة
k this deck
67
Which of the following is a major objective of JIT production?

A) reduction of goods in process
B) elimination of disruptions by continuous improvement
C) unnecessary inventory levels
D) all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 199 في هذه المجموعة.
فتح الحزمة
k this deck
68
Operations control requires production managers to monitor production performance by ________.

A) comparing results with detailed plans and schedules
B) checking on each worker on the production floor
C) observing activities from a platform above the workers
D) constantly talking with employees involved
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 199 في هذه المجموعة.
فتح الحزمة
k this deck
69
In a ________ layout for production,equipment and people are grouped according to function.

A) cellular
B) same-steps
C) custom-products
D) service
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 199 في هذه المجموعة.
فتح الحزمة
k this deck
70
Examining step-by-step procedures to reduce inefficiency involves an approach called ________.

A) operations scheduling
B) reengineering
C) value-added analysis
D) methods improvement
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 199 في هذه المجموعة.
فتح الحزمة
k this deck
71
In a ________ system,the customer does not need to be a part of the system to receive the service.

A) high-contact
B) low-contact
C) conversion
D) quality
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 199 في هذه المجموعة.
فتح الحزمة
k this deck
72
Thousands of empty jugs move down a conveyor belt at Colgate-Palmolive before stopping to be filled and moving on to be labeled.What type of layout is utilized?

A) same-steps
B) custom-products
C) hybrid
D) fixed-position
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 199 في هذه المجموعة.
فتح الحزمة
k this deck
73
At XYZ Enterprises,cloth is cut in the front room of the facility.The cut cloth then moves to the sewing department in the back room.What type of layout is utilized?

A) product
B) custom-products
C) same-steps
D) fixed-position
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 199 في هذه المجموعة.
فتح الحزمة
k this deck
74
In ________,products are made according to customer specifications.

A) make-to-stock operations
B) make-to-order operations
C) a low-contact system
D) a value chain
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 199 في هذه المجموعة.
فتح الحزمة
k this deck
75
________ systems are designed for smooth production flow that avoid inefficiencies,eliminate unnecessary inventories,and continuously improve production processes.

A) Lean
B) Managed
C) Production
D) Flexible
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 199 في هذه المجموعة.
فتح الحزمة
k this deck
76
A(n)________ is a set of methods and technologies used in the production of a good or service.

A) operations process
B) production episode
C) reduction
D) methods plan
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 199 في هذه المجموعة.
فتح الحزمة
k this deck
77
In a ________ system,the customer is part of the system during service delivery.

A) high-contact
B) low-contact
C) customer
D) quality
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 199 في هذه المجموعة.
فتح الحزمة
k this deck
78
________ is a special ability that production does especially well to outperform the competition.

A) Supply chain management
B) Total quality management
C) Process engineering
D) Operations capability
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 199 في هذه المجموعة.
فتح الحزمة
k this deck
79
The amount of a product that a company can produce under normal working conditions is its ________.

A) capacity
B) output
C) efficiency
D) burden
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 199 في هذه المجموعة.
فتح الحزمة
k this deck
80
________ includes the receiving,storing,handling,and counting of all raw materials,partly finished goods,and finished goods.

A) Materials handling
B) Inventory control
C) Quality control
D) None of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 199 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 199 في هذه المجموعة.