Deck 10: Manufacturingproduction Analytics

ملء الشاشة (f)
exit full mode
سؤال
Name an example of a total quality improvement program for a manufacturer: _______________
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
What is the purpose of total quality management (TQM)?
سؤال
When analytics are used to explore the past of the supply chain what are examples of key performance indicators?
سؤال
Value chain firms utilize analytics to explore all the following except?

A) problems of supply chain fluctuations
B) costs of assets
C) flexibility of operations
D) interface with others in the supply chain
E) all of the above are utilized by value chain firms
سؤال
When analytics are used to explore the current situation it can explore bottlenecks, truck rerouting, equipment concerns, and inventory controls.
سؤال
When exploring the past, a manager would explore forecasting demand, capacity planning for a factory, and exploring alternate inventory supplies.
سؤال
The supply chain evaluation process starts with problem identification- which is normally an inefficiency that is going to be reduced or determining the optimal inventory rate to save money through minimizing carrying costs.
سؤال
The key for proper manufacturing and production is ______________.
سؤال
Define an ensemble forecast.
سؤال
How can robots streamline the manufacturing process?
سؤال
Bringing in supplies is the most important part of the manufacturing process.
سؤال
Japan developed its own quality program to revolutionize its manufacturing process.
سؤال
Marketing is an important phase of the manufacturing process.
سؤال
Customer research is not typically a stage of the manufacturing process.
سؤال
Define product sampling.
سؤال
Density, volume, and strength of the materials were some of the important factors considered during testing and material evaluation for moonwalker.
سؤال
Nike uses a 10-page labor audit that examined over 250 areas to evaluate labor conditions at its factories.
سؤال
Nike examines only what goes on in its factories to make sure they meet production deadlines.
سؤال
The cost of travel and logistics of remote production have forced strategic changes in many of the traditional ways to set up and produce on site. What are some of these changes?
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/19
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 10: Manufacturingproduction Analytics
1
Name an example of a total quality improvement program for a manufacturer: _______________
Lean manufacturing or Six-Sigma
2
What is the purpose of total quality management (TQM)?
TQM is designed to lead to continuous process improvement, reliable decision making, quick response to problems, and reducing overall costs.
3
When analytics are used to explore the past of the supply chain what are examples of key performance indicators?
The number of orders, defect rate, and asset utilization are examples of KPIs.
4
Value chain firms utilize analytics to explore all the following except?

A) problems of supply chain fluctuations
B) costs of assets
C) flexibility of operations
D) interface with others in the supply chain
E) all of the above are utilized by value chain firms
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 19 في هذه المجموعة.
فتح الحزمة
k this deck
5
When analytics are used to explore the current situation it can explore bottlenecks, truck rerouting, equipment concerns, and inventory controls.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 19 في هذه المجموعة.
فتح الحزمة
k this deck
6
When exploring the past, a manager would explore forecasting demand, capacity planning for a factory, and exploring alternate inventory supplies.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 19 في هذه المجموعة.
فتح الحزمة
k this deck
7
The supply chain evaluation process starts with problem identification- which is normally an inefficiency that is going to be reduced or determining the optimal inventory rate to save money through minimizing carrying costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 19 في هذه المجموعة.
فتح الحزمة
k this deck
8
The key for proper manufacturing and production is ______________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 19 في هذه المجموعة.
فتح الحزمة
k this deck
9
Define an ensemble forecast.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 19 في هذه المجموعة.
فتح الحزمة
k this deck
10
How can robots streamline the manufacturing process?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 19 في هذه المجموعة.
فتح الحزمة
k this deck
11
Bringing in supplies is the most important part of the manufacturing process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 19 في هذه المجموعة.
فتح الحزمة
k this deck
12
Japan developed its own quality program to revolutionize its manufacturing process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 19 في هذه المجموعة.
فتح الحزمة
k this deck
13
Marketing is an important phase of the manufacturing process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 19 في هذه المجموعة.
فتح الحزمة
k this deck
14
Customer research is not typically a stage of the manufacturing process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 19 في هذه المجموعة.
فتح الحزمة
k this deck
15
Define product sampling.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 19 في هذه المجموعة.
فتح الحزمة
k this deck
16
Density, volume, and strength of the materials were some of the important factors considered during testing and material evaluation for moonwalker.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 19 في هذه المجموعة.
فتح الحزمة
k this deck
17
Nike uses a 10-page labor audit that examined over 250 areas to evaluate labor conditions at its factories.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 19 في هذه المجموعة.
فتح الحزمة
k this deck
18
Nike examines only what goes on in its factories to make sure they meet production deadlines.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 19 في هذه المجموعة.
فتح الحزمة
k this deck
19
The cost of travel and logistics of remote production have forced strategic changes in many of the traditional ways to set up and produce on site. What are some of these changes?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 19 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 19 في هذه المجموعة.