The documents which should be completed after the addition of a ring final circuit to an existing installation are

A) Minor works certificate and a condition report
B) Schedule of tests and an electrical installation report
C) Electrical installation report, Schedule of test results and a schedule of inspections
D) Electrical installation condition report, Condition report schedule of inspections and a schedule of test results
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
The statutory document which relates to the DNO

A) Electricity at work regulations
B) Electrical supply act
C) Health and safety at work act
D) Electrical safety, quality and continuity regulations
سؤال
Who should be consulted with regards to the extent and limitations when carrying out a periodic inspection which has been requested on a licensed property?

A) The client and the DNO
B) The DNO and the insurance company
C) The insurance company and the fire brigade
D) The local licensing authority and the landlord
سؤال
When and where should the extent and limitations of a periodic inspection be recorded?

A) Before starting work and on an electrical installation condition report
B) On completion of the work and on an electrical installation condition report
C) Before starting work and on an electrical installation certificate
D) Before starting work and on a periodic inspection report
سؤال
List in the correct sequence the first three tests to be carried out on a new 3 phase industrial cooker circuit

A) Continuity of cpc, insulation resistance an polarity
B) Polarity, continuity of cpc and insulation resistance
C) Visual inspection, earth fault loop and continuity of cpc
D) Polarity, earth fault loop impedance and insulation resistance
سؤال
What would be the most appropriate way to verify the continuity of a 45m long 10mm2 protective bonding conductor

A) Use method 2
B) Visual inspection
C) Use method 1
D) R1 + R2 method
سؤال
The maximum length of 10mm2 cable which has a resistance of 1.83mO per mtr which can be used for main protective bonding is

A) 20mΩ
B) 27mΩ
C) 29mΩ
D) 25mΩ
سؤال
When carrying out the 1st stage of a ring final circuit test the most likely reason for the cpc resistance value being higher than the live conductors is

A) The csa is greater
B) The conductor is longer
C) The csa is smaller
D) The conductor is shorter
سؤال
Stage one of a ring final circuit test gives the values of the live conductors as 0.6O and the cpc as 0.99O. The tests carried out at stage 2 and stage 3 should provide the following values at each socket on the ring

A) 0.3Ω and 0.397Ω
B) 0.6Ω and 0.397Ω
C) 0.397Ω and 0.8Ω
D) 0.3Ω and 0.3Ω
سؤال
The effect on the measured value of insulation resistance and conductor resistance when the length of the conductor is increased is

A) Insulation resistance will reduce and the conductor resistance will increase
B) Insulation resistance will reduce and the conductor resistance will reduce
C) Insulation resistance will increase and the conductor resistance will increase
D) Insulation resistance will not change and the conductor resistance will increase
سؤال
The measured value of insulation resistance when a circuit is tested together with ten other circuits will

A) Not change
B) Increase
C) Reduce
D) Be ten times greater
سؤال
An insulation resistance test carried out on a circuit containing a surge protection device, the test voltage used and minimum insulation resistance value is

A) 500v d.c. and 1 MO
B) 250v d.c. and 1 MO
C) 250v d.c. and 0.5MO
D) 250v d.c. and 1 mO
سؤال
One effect of a circuit protective device connected in to the neutral conductor only would be

A) The device will operate on a neutral to earth fault
B) The device will not operate on overload
C) The circuit will remain live after an overload
D) The device will not operate during a short circuit
سؤال
Two special locations which are divided into zones are

A) A restrictive conductive location and a room containing a bath or shower
B) A Sauna and a Construction site
C) A Marina and a Caravan site
D) A Sauna and a room containing a bath or shower
سؤال
The recommended IP rating for equipment installed in Zone 1 of a Bathroom is

A) IPX4
B) IP4X
C) IPXXD
D) IP5X
سؤال
Electrical equipment installed in a wet room which is cleaned by the use of a hose should have a minimum IP rating of

A) IP5X
B) IPX5
C) IPX4
D) IPX8
سؤال
Using the circuit data provided
Ze 0.32O
Conductor resistance 7.41mO/m
Circuit length 38 m
The measured earth fault loop impedance for the circuit would be

A) 0.563Ω
B) 0.883Ω
C) 0.442Ω
D) 0.281Ω
سؤال
What is the maximum percentage voltage drop permitted for a 230 volt lighting circuit

A) 6.9%
B) 11.9%
C) 5%
D) 3%
سؤال
The maximum volt drop permitted for a 230v ring circuit is

A) 6.9v
B) 11.5v
C) 5v
D) 3v
سؤال
The type of inspection and test most likely to require verification of volt drop is

A) Initial verification
B) Installation where no documentation is available
C) Periodic inspection and test
D) Industrial
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/20
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 5: Earth Electrode Testing
1
The documents which should be completed after the addition of a ring final circuit to an existing installation are

A) Minor works certificate and a condition report
B) Schedule of tests and an electrical installation report
C) Electrical installation report, Schedule of test results and a schedule of inspections
D) Electrical installation condition report, Condition report schedule of inspections and a schedule of test results
C
2
The statutory document which relates to the DNO

A) Electricity at work regulations
B) Electrical supply act
C) Health and safety at work act
D) Electrical safety, quality and continuity regulations
D
3
Who should be consulted with regards to the extent and limitations when carrying out a periodic inspection which has been requested on a licensed property?

A) The client and the DNO
B) The DNO and the insurance company
C) The insurance company and the fire brigade
D) The local licensing authority and the landlord
D
4
When and where should the extent and limitations of a periodic inspection be recorded?

A) Before starting work and on an electrical installation condition report
B) On completion of the work and on an electrical installation condition report
C) Before starting work and on an electrical installation certificate
D) Before starting work and on a periodic inspection report
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
5
List in the correct sequence the first three tests to be carried out on a new 3 phase industrial cooker circuit

A) Continuity of cpc, insulation resistance an polarity
B) Polarity, continuity of cpc and insulation resistance
C) Visual inspection, earth fault loop and continuity of cpc
D) Polarity, earth fault loop impedance and insulation resistance
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
6
What would be the most appropriate way to verify the continuity of a 45m long 10mm2 protective bonding conductor

A) Use method 2
B) Visual inspection
C) Use method 1
D) R1 + R2 method
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
7
The maximum length of 10mm2 cable which has a resistance of 1.83mO per mtr which can be used for main protective bonding is

A) 20mΩ
B) 27mΩ
C) 29mΩ
D) 25mΩ
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
8
When carrying out the 1st stage of a ring final circuit test the most likely reason for the cpc resistance value being higher than the live conductors is

A) The csa is greater
B) The conductor is longer
C) The csa is smaller
D) The conductor is shorter
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
9
Stage one of a ring final circuit test gives the values of the live conductors as 0.6O and the cpc as 0.99O. The tests carried out at stage 2 and stage 3 should provide the following values at each socket on the ring

A) 0.3Ω and 0.397Ω
B) 0.6Ω and 0.397Ω
C) 0.397Ω and 0.8Ω
D) 0.3Ω and 0.3Ω
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
10
The effect on the measured value of insulation resistance and conductor resistance when the length of the conductor is increased is

A) Insulation resistance will reduce and the conductor resistance will increase
B) Insulation resistance will reduce and the conductor resistance will reduce
C) Insulation resistance will increase and the conductor resistance will increase
D) Insulation resistance will not change and the conductor resistance will increase
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
11
The measured value of insulation resistance when a circuit is tested together with ten other circuits will

A) Not change
B) Increase
C) Reduce
D) Be ten times greater
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
12
An insulation resistance test carried out on a circuit containing a surge protection device, the test voltage used and minimum insulation resistance value is

A) 500v d.c. and 1 MO
B) 250v d.c. and 1 MO
C) 250v d.c. and 0.5MO
D) 250v d.c. and 1 mO
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
13
One effect of a circuit protective device connected in to the neutral conductor only would be

A) The device will operate on a neutral to earth fault
B) The device will not operate on overload
C) The circuit will remain live after an overload
D) The device will not operate during a short circuit
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
14
Two special locations which are divided into zones are

A) A restrictive conductive location and a room containing a bath or shower
B) A Sauna and a Construction site
C) A Marina and a Caravan site
D) A Sauna and a room containing a bath or shower
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
15
The recommended IP rating for equipment installed in Zone 1 of a Bathroom is

A) IPX4
B) IP4X
C) IPXXD
D) IP5X
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
16
Electrical equipment installed in a wet room which is cleaned by the use of a hose should have a minimum IP rating of

A) IP5X
B) IPX5
C) IPX4
D) IPX8
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
17
Using the circuit data provided
Ze 0.32O
Conductor resistance 7.41mO/m
Circuit length 38 m
The measured earth fault loop impedance for the circuit would be

A) 0.563Ω
B) 0.883Ω
C) 0.442Ω
D) 0.281Ω
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
18
What is the maximum percentage voltage drop permitted for a 230 volt lighting circuit

A) 6.9%
B) 11.9%
C) 5%
D) 3%
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
19
The maximum volt drop permitted for a 230v ring circuit is

A) 6.9v
B) 11.5v
C) 5v
D) 3v
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
20
The type of inspection and test most likely to require verification of volt drop is

A) Initial verification
B) Installation where no documentation is available
C) Periodic inspection and test
D) Industrial
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.