Deck 5: Project Management: Planning, Design, and Construction
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/14
العب
ملء الشاشة (f)
Deck 5: Project Management: Planning, Design, and Construction
1
1 The principles of project management include all of the following EXCEPT:
A) Costs
B) Scheduling
C) Event management
D) SMARTER objectives
A) Costs
B) Scheduling
C) Event management
D) SMARTER objectives
C
Explanation: Choice C (event management) is not one of the four principles of project management. The four principles are costs, scheduling, quality management, and developing SMARTER objectives.
Explanation: Choice C (event management) is not one of the four principles of project management. The four principles are costs, scheduling, quality management, and developing SMARTER objectives.
2
2 What type of chart listed below is typically designed through the use of project management software?
A) Ant Charts
B) Gantt Charts
C) Plant Charts
D) Map Charts
A) Ant Charts
B) Gantt Charts
C) Plant Charts
D) Map Charts
B
Explanation: Choice B (Gantt Chart) is the only correct answer. A Gantt chart is a horizontal bar chart that graphically displays the time relationship of the steps of the project, where each step of the project is represented by a line on the chart indicating the time period to be undertaken. When a Gantt Chart is completed, the sport facility manager can see the minimum total time for each task, the proper sequence of tasks, which tasks are completed at the same time, and which are connected.
Explanation: Choice B (Gantt Chart) is the only correct answer. A Gantt chart is a horizontal bar chart that graphically displays the time relationship of the steps of the project, where each step of the project is represented by a line on the chart indicating the time period to be undertaken. When a Gantt Chart is completed, the sport facility manager can see the minimum total time for each task, the proper sequence of tasks, which tasks are completed at the same time, and which are connected.
3
3 The first step in any preliminary planning is:
A) Conducting a Program Analysis and Feasibility Study
B) Commissioning a Planning Committee
C) Select an Architect
D) Developing the Master Plan
A) Conducting a Program Analysis and Feasibility Study
B) Commissioning a Planning Committee
C) Select an Architect
D) Developing the Master Plan
A
Explanation: Choice A (program analysis) because the first step to any preliminary planning is to conduct a review on the need for the facility in terms of the programs that are either already established or are planned to be established, which is normally articulated through the feasibility study. The planning committee (Choice B), architect (Choice C), and master plan (Choice D) cannot be developed or commissioned without this initial information from the program analysis and feasibility study.
Explanation: Choice A (program analysis) because the first step to any preliminary planning is to conduct a review on the need for the facility in terms of the programs that are either already established or are planned to be established, which is normally articulated through the feasibility study. The planning committee (Choice B), architect (Choice C), and master plan (Choice D) cannot be developed or commissioned without this initial information from the program analysis and feasibility study.
4
4 When conducting a feasibility study, which of the following impacts is considered?
A) Economic Impact
B) Societal Impact
C) Sport Impact
D) All of the Above
A) Economic Impact
B) Societal Impact
C) Sport Impact
D) All of the Above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 14 في هذه المجموعة.
فتح الحزمة
k this deck
5
5 Which of the following is NOT the responsibility of an architect?
A) Drawing Drafts
B) Building Scale Models
C) Acting as the Main Builder/Renovator for the Facility
D) Aiding is Securing Zoning and Building Permits
A) Drawing Drafts
B) Building Scale Models
C) Acting as the Main Builder/Renovator for the Facility
D) Aiding is Securing Zoning and Building Permits
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 14 في هذه المجموعة.
فتح الحزمة
k this deck
6
6 The ________________ is used to review the major components of the project, market the project to gain financial and general support for the project, and serve as a framework document for the design and construction of the sport facility.
A) Master Plan
B) Program Statement
C) Feasibility Study
D) Timetable
A) Master Plan
B) Program Statement
C) Feasibility Study
D) Timetable
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 14 في هذه المجموعة.
فتح الحزمة
k this deck
7
7 Which of the following statements about timelines is TRUE?
A) Contractors are responsible for the creation and management of timetables
B) Timetables are living documents that are always consulted, evaluated, and modified.
C) Items in a timetable are never "fast tracked", regardless of need, environmental situations, or delay.
D) A timetable for design does not affect the design and implementation of management and operations functions.
A) Contractors are responsible for the creation and management of timetables
B) Timetables are living documents that are always consulted, evaluated, and modified.
C) Items in a timetable are never "fast tracked", regardless of need, environmental situations, or delay.
D) A timetable for design does not affect the design and implementation of management and operations functions.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 14 في هذه المجموعة.
فتح الحزمة
k this deck
8
8 Considerations for site selection include all of the following EXCEPT:
A) Attractiveness of location
B) Natural and environmental conditions
C) Community support
D) None of the Above (i.e., all are considerations)
A) Attractiveness of location
B) Natural and environmental conditions
C) Community support
D) None of the Above (i.e., all are considerations)
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 14 في هذه المجموعة.
فتح الحزمة
k this deck
9
9 Which of the following is TRUE about the creation of detailed shop drawings for a facility?
A) The architect must work closely with the contractor during this phase to ensure that all essential parts of the facility are included.
B) Shop drawings address all aspect of the facility including appearance, performance aspects, and governing principles.
C) Shop drawings include any modifications, additions, or deletions that have been made based on the recommendations of the architect and/or contractor.
D) All of the Above
A) The architect must work closely with the contractor during this phase to ensure that all essential parts of the facility are included.
B) Shop drawings address all aspect of the facility including appearance, performance aspects, and governing principles.
C) Shop drawings include any modifications, additions, or deletions that have been made based on the recommendations of the architect and/or contractor.
D) All of the Above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 14 في هذه المجموعة.
فتح الحزمة
k this deck
10
10 Throughout the construction process, and especially when construction is nearing completion, the focus turns to the management and operation of the sport facility. Included in this process is all of the following EXCEPT:
A) Preparing the facility management infrastructure.
B) Attracting events to be staged in the facility.
C) Conduct a groundbreaking ceremony.
D) Preparing an event management infrastructure.
A) Preparing the facility management infrastructure.
B) Attracting events to be staged in the facility.
C) Conduct a groundbreaking ceremony.
D) Preparing an event management infrastructure.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 14 في هذه المجموعة.
فتح الحزمة
k this deck
11
Define what would be involved in conducting a feasibility study for a new football facility in a suburban town of your choice.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 14 في هذه المجموعة.
فتح الحزمة
k this deck
12
Develop a program statement for a new golf course.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 14 في هذه المجموعة.
فتح الحزمة
k this deck
13
You have been charged with developing a cost estimate for a renovation to a 50-year old local recreation facility that includes four multipurpose courts, a fitness center, and a swimming pool/aquatic center. What would you include in this estimate?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 14 في هذه المجموعة.
فتح الحزمة
k this deck
14
Create a groundbreaking task timeline for a new multipurpose recreation facility in your hometown by creating a Gantt Chart with Microsoft Project or another project management software.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 14 في هذه المجموعة.
فتح الحزمة
k this deck