Deck 3: Business continuity plan (BCP) Strategy

ملء الشاشة (f)
exit full mode
سؤال
A problem with risk management at large firms is that it is often:

A)Completely ignored
B)Siloed
C)Too frequent
D)Too aggressive
E)All of the above
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Jerry was in the midst of assessing his risk for a project at a well-known real estate firm when the stock market collapsed, sending shockwaves throughout his company and his project. The market crashing can be classified as what type of risk:

A)Foreseeable
B)Internal
C)Technical
D)External
E)Unimaginable
سؤال
Which of the following could be an example of hedging? Select all that apply:

A)Buying oil futures
B)Hiring a strategy consultant
C)Protecting against fluctuating exchange rates
D)Changing back-office processors
E)Playing two hands of blackjack at once
سؤال
Ted is negotiating a 10-year contract with the U.S. government to provide educational services. The government wants a fixed price project. However, Ted is extremely concerned about the possibility of inflation given the increase in government spending. Ted should suggest what time of contract?

A)Cost plus fee
B)Cost plus fixed fee
C)Cost plus incentive fee
D)Time and material
E)Fixed price with economic price adjustment
سؤال
Reducing inventory levels reduces risk.
سؤال
According to the DRI Professional Practices, what are the 3 criteria to be used to identify alternative facility and offsite requirements?

A)Facilities
B)Cost
C)Communicatons
D)Personnel
E)Utilities
سؤال
What are some ways to manage manufacturing site risk?

A)Utilize distributed processing
B)Third party manufacturers
C)Alternate source of product
D)Multiple suppliers
E)Upgrade facilities
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/7
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 3: Business continuity plan (BCP) Strategy
1
A problem with risk management at large firms is that it is often:

A)Completely ignored
B)Siloed
C)Too frequent
D)Too aggressive
E)All of the above
Siloed
2
Jerry was in the midst of assessing his risk for a project at a well-known real estate firm when the stock market collapsed, sending shockwaves throughout his company and his project. The market crashing can be classified as what type of risk:

A)Foreseeable
B)Internal
C)Technical
D)External
E)Unimaginable
External
3
Which of the following could be an example of hedging? Select all that apply:

A)Buying oil futures
B)Hiring a strategy consultant
C)Protecting against fluctuating exchange rates
D)Changing back-office processors
E)Playing two hands of blackjack at once
Protecting against fluctuating exchange rates
4
Ted is negotiating a 10-year contract with the U.S. government to provide educational services. The government wants a fixed price project. However, Ted is extremely concerned about the possibility of inflation given the increase in government spending. Ted should suggest what time of contract?

A)Cost plus fee
B)Cost plus fixed fee
C)Cost plus incentive fee
D)Time and material
E)Fixed price with economic price adjustment
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 7 في هذه المجموعة.
فتح الحزمة
k this deck
5
Reducing inventory levels reduces risk.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 7 في هذه المجموعة.
فتح الحزمة
k this deck
6
According to the DRI Professional Practices, what are the 3 criteria to be used to identify alternative facility and offsite requirements?

A)Facilities
B)Cost
C)Communicatons
D)Personnel
E)Utilities
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 7 في هذه المجموعة.
فتح الحزمة
k this deck
7
What are some ways to manage manufacturing site risk?

A)Utilize distributed processing
B)Third party manufacturers
C)Alternate source of product
D)Multiple suppliers
E)Upgrade facilities
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 7 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 7 في هذه المجموعة.