Deck 8: Facility Engineering and Maintenance

ملء الشاشة (f)
exit full mode
سؤال
What roles do facilities engineers in a hospitality operation generally focus on?

A) They focus on using best business practices to improve efficiency
B) They focus on using best business practices to improve solvency
C) They focus on using best business practices to improve liquidity
D) They focus on using best business practices to improve activity
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Which one of the following options DOES NOT belong to the chief goals of a Facility Engineering and Maintenance Department of a hotel?

A) Ensuring that all room sales are done adequately
B) Increasing the pride and morale of hotel's staff
C) Ensuring guest satisfaction
D) Ensuring the safety of those working and visiting the hotel
سؤال
Which one of the following options DOES NOT belong to the chief goals of a Facility Engineering and Maintenance Department of a hotel?

A) Managing the guest satisfaction databases
B) Protecting and enhancing the financial value of buildings and grounds
C) Managing maintenance and repair costs
D) Supporting efforts of all other hotel departments
سؤال
Mounts and Meinzer (2011) studied and ranked various components of the Chief Engineer's job.Which of the top 10 components was ranked by the chief engineers in the study as the most important in a chief engineer's job?

A) Knowledge of maintenance of equipment
B) Knowledge of the types of equipment
C) Responsibility for leadership
D) Responsibility for safety
سؤال
Mounts and Meinzer (2011) studied and ranked various components of the Chief Engineer's job.Which of the top 10 components was ranked by the chief engineers in the study as the least important in a chief engineer's job?

A) Knowledge of the types of equipment
B) Relations with top management
C) Responsibilities of an effective organisational ability
D) Responsibility for communication with employees
سؤال
Mounts and Meinzer (2011) studied and ranked various components of the Chief Engineer's job.Which one in the options below DOES NOT belong to the top 10 components of the study?

A) Responsibility for training
B) Energy conservation
C) Energy management
D) Responsibility for safety
سؤال
In the transcript of the interview with a Chief Engineer, what does the Chief Engineer expect most from the engineers in his team?

A) Flexibility and friendliness
B) Flexibility and adaptability
C) Knowledge and adaptability
D) Knowledge and friendliness
سؤال
In the transcript of the interview with a Chief Engineer, what was his answer to the question about the standard temperature level within the property?

A) A comfortable 21 degrees
B) A comfortable 20 degrees
C) A comfortable 22 degrees
D) A comfortable 23 degrees
سؤال
The two major categories of the engineering budget are repairs and maintenance, and _________________.

A) heating, lighting, and power
B) heating, energy, and power
C) heating, utility, and energy
D) lighting, utility, and power
سؤال
On an annual basis, what is the range for a full service hotel of the repairs and maintenance costs as a percentage of its annual revenues taking into account location and size differences?

A) About 5% to 8%
B) About 4% to 7%
C) About 3% to 6%
D) About 2% to 5%
سؤال
Which type of maintenance refers to activities initiated by the Facility Engineering and Maintenance Department based on a formal work order that identifies a known problem or need?

A) Scheduled maintenance
B) Routine maintenance
C) Total productive maintenance
D) Preventative maintenance
سؤال
Which type of maintenance that is performed on a regular basis and requiring minimal skills, helps in discovering potential problems and preventing equipment failures?

A) Routine maintenance
B) Preventative maintenance
C) Scheduled maintenance
D) Total productive maintenance
سؤال
Which type of maintenance relates to the taking care and servicing of the facilities and equipment for the purpose of maintaining satisfactory operating conditions, and consist of tests, measurements, adjustments and parts replacement?

A) Preventative maintenance
B) Replacement maintenance
C) Breakdown maintenance
D) Emergency maintenance
سؤال
What is the name of the maintenance approach that is typically employed when failures are unlikely to result in workplace injuries or excessive downtime?

A) Breakdown maintenance
B) Emergency maintenance
C) Total productive maintenance
D) Routine maintenance
سؤال
What type of maintenance is linked to the term 'run-to-failure'?

A) Breakdown maintenance
B) Emergency maintenance
C) Contract maintenance
D) Replacement maintenance
سؤال
Which one in the options below IS NOT one of the benefits of contract maintenance?

A) Possibility of missing out on the best terms due to opaque bidding
B) Possible reductions in costs of supplies and equipment
C) Possible reductions in total labour-related expenses
D) Reductions in administrative time required for maintenance activities
سؤال
The five core elements to a total productive maintenance programme are education and training, conduct planned maintenance, small group kaizen activities, maintenance prevention and ____________.

A) operator self-maintenance
B) downtime countermeasures
C) spare parts management
D) maintenance cost analysis
سؤال
Text 9.2 indicates that US hotels spend in excess of $ 7.5 billion on energy each year according to the U.S. Environmental Protection Agency.Based on the text, what is the average annual expenditure per available room on energy by the more than 47,000 hotels and motels in America?

A) $ 2,200
B) $ 2,000
C) $ 2,400
D) $ 1,800
سؤال
According to the 2011 study on energy use carried out by Hotel Energy Solutions, the largest single end-user of energy in hotels is____________.

A) space conditioning
B) lighting
C) catering
D) domestic hot water
سؤال
According to Text 9.3 on water management and responsibility in hotels, how many litres of water can be lost in a single day by a leaking toilet?

A) 750 litres
B) 150 litres
C) 450 litres
D) 950 litres
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/20
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 8: Facility Engineering and Maintenance
1
What roles do facilities engineers in a hospitality operation generally focus on?

A) They focus on using best business practices to improve efficiency
B) They focus on using best business practices to improve solvency
C) They focus on using best business practices to improve liquidity
D) They focus on using best business practices to improve activity
A
2
Which one of the following options DOES NOT belong to the chief goals of a Facility Engineering and Maintenance Department of a hotel?

A) Ensuring that all room sales are done adequately
B) Increasing the pride and morale of hotel's staff
C) Ensuring guest satisfaction
D) Ensuring the safety of those working and visiting the hotel
A
3
Which one of the following options DOES NOT belong to the chief goals of a Facility Engineering and Maintenance Department of a hotel?

A) Managing the guest satisfaction databases
B) Protecting and enhancing the financial value of buildings and grounds
C) Managing maintenance and repair costs
D) Supporting efforts of all other hotel departments
A
4
Mounts and Meinzer (2011) studied and ranked various components of the Chief Engineer's job.Which of the top 10 components was ranked by the chief engineers in the study as the most important in a chief engineer's job?

A) Knowledge of maintenance of equipment
B) Knowledge of the types of equipment
C) Responsibility for leadership
D) Responsibility for safety
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
5
Mounts and Meinzer (2011) studied and ranked various components of the Chief Engineer's job.Which of the top 10 components was ranked by the chief engineers in the study as the least important in a chief engineer's job?

A) Knowledge of the types of equipment
B) Relations with top management
C) Responsibilities of an effective organisational ability
D) Responsibility for communication with employees
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
6
Mounts and Meinzer (2011) studied and ranked various components of the Chief Engineer's job.Which one in the options below DOES NOT belong to the top 10 components of the study?

A) Responsibility for training
B) Energy conservation
C) Energy management
D) Responsibility for safety
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
7
In the transcript of the interview with a Chief Engineer, what does the Chief Engineer expect most from the engineers in his team?

A) Flexibility and friendliness
B) Flexibility and adaptability
C) Knowledge and adaptability
D) Knowledge and friendliness
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
8
In the transcript of the interview with a Chief Engineer, what was his answer to the question about the standard temperature level within the property?

A) A comfortable 21 degrees
B) A comfortable 20 degrees
C) A comfortable 22 degrees
D) A comfortable 23 degrees
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
9
The two major categories of the engineering budget are repairs and maintenance, and _________________.

A) heating, lighting, and power
B) heating, energy, and power
C) heating, utility, and energy
D) lighting, utility, and power
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
10
On an annual basis, what is the range for a full service hotel of the repairs and maintenance costs as a percentage of its annual revenues taking into account location and size differences?

A) About 5% to 8%
B) About 4% to 7%
C) About 3% to 6%
D) About 2% to 5%
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
11
Which type of maintenance refers to activities initiated by the Facility Engineering and Maintenance Department based on a formal work order that identifies a known problem or need?

A) Scheduled maintenance
B) Routine maintenance
C) Total productive maintenance
D) Preventative maintenance
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
12
Which type of maintenance that is performed on a regular basis and requiring minimal skills, helps in discovering potential problems and preventing equipment failures?

A) Routine maintenance
B) Preventative maintenance
C) Scheduled maintenance
D) Total productive maintenance
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
13
Which type of maintenance relates to the taking care and servicing of the facilities and equipment for the purpose of maintaining satisfactory operating conditions, and consist of tests, measurements, adjustments and parts replacement?

A) Preventative maintenance
B) Replacement maintenance
C) Breakdown maintenance
D) Emergency maintenance
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
14
What is the name of the maintenance approach that is typically employed when failures are unlikely to result in workplace injuries or excessive downtime?

A) Breakdown maintenance
B) Emergency maintenance
C) Total productive maintenance
D) Routine maintenance
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
15
What type of maintenance is linked to the term 'run-to-failure'?

A) Breakdown maintenance
B) Emergency maintenance
C) Contract maintenance
D) Replacement maintenance
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
16
Which one in the options below IS NOT one of the benefits of contract maintenance?

A) Possibility of missing out on the best terms due to opaque bidding
B) Possible reductions in costs of supplies and equipment
C) Possible reductions in total labour-related expenses
D) Reductions in administrative time required for maintenance activities
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
17
The five core elements to a total productive maintenance programme are education and training, conduct planned maintenance, small group kaizen activities, maintenance prevention and ____________.

A) operator self-maintenance
B) downtime countermeasures
C) spare parts management
D) maintenance cost analysis
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
18
Text 9.2 indicates that US hotels spend in excess of $ 7.5 billion on energy each year according to the U.S. Environmental Protection Agency.Based on the text, what is the average annual expenditure per available room on energy by the more than 47,000 hotels and motels in America?

A) $ 2,200
B) $ 2,000
C) $ 2,400
D) $ 1,800
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
19
According to the 2011 study on energy use carried out by Hotel Energy Solutions, the largest single end-user of energy in hotels is____________.

A) space conditioning
B) lighting
C) catering
D) domestic hot water
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
20
According to Text 9.3 on water management and responsibility in hotels, how many litres of water can be lost in a single day by a leaking toilet?

A) 750 litres
B) 150 litres
C) 450 litres
D) 950 litres
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 20 في هذه المجموعة.