Computer Integrated Manufacturing focuses on reducing the complexity of the physical manufacturing layout of the shop floor.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Cement and petrochemicals are produced by the batch manufacturing method.
سؤال
A company's value stream includes all steps in a process,both essential and non-essential,for which the customer is willing to pay.
سؤال
Accounting in a world-class manufacturing environment emphasizes standard cost and variance analysis.
سؤال
Batch processing creates a homogeneous product through a continuous series of standard procedures.
سؤال
The philosophy of customer satisfaction permeates the world-class firm.
سؤال
A purchase requisition authorizes the storekeeper to release materials to individuals or work centers in the production process.
سؤال
The only objective of the Just-In-Time philosophy is to reduce inventory levels.
سؤال
The complexities of ABC have caused many firms to abandon this method in favor of a simpler accounting model called value stream accounting.
سؤال
Typically the only allocated cost in the value stream is a charge per square foot for the value stream production facility.
سؤال
The cost accounting system authorizes the release of raw materials into production.
سؤال
The bill of materials specifies the types and quantities of the raw materials and subassemblies used in producing a single unit of finished product.
سؤال
ABC assigns cost to cost objects based on their use of activities.
سؤال
Reports generated by the cost accounting system include performance reports and budget reports.
سؤال
The work-in-process file is the subsidiary ledger for the work-in-process control account.
سؤال
The two subsystems of a traditional conversion cycle are the production system and the delivery system.
سؤال
Lean manufacturing evolved from the Toyota Production System (TPS),which is based on the just-in-time (JIT)production model.
سؤال
Manufacturing resources planning (MRP II)has evolved into enterprise resource planning (ERP).
سؤال
Move tickets authorize the storekeeper to release materials to work centers.
سؤال
The objective of the Economic Order Quantity model is to reduce total inventory costs by minimizing carrying costs and ordering costs.
سؤال
What is the economic order quantity if the annual demand is 10,000 units,set up cost of placing each order is $3 and the holding cost per unit per year is $2?

A) 174
B) 123
C) 245
D) none of the above
سؤال
Firms hold safety stock to compensate for

A) mathematical weaknesses of the Economic Order Quantity model
B) variations in lead time or daily demand
C) fluctuations in carrying costs
D) uncertainty in the estimation of ordering costs
سؤال
The production schedule is

A) the expected demand for the firm's finished goods for a given year
B) the formal plan and authority to begin production
C) a description of the type and quantity of raw materials and subassemblies used to produce a single unit of finished product
D) the sequence of operations during manufacturing
سؤال
Pull processing involves pulling products from the consumer end (demand),rather than pushing them from the production end (supply).
سؤال
Which process creates a homogeneous product through a continuous series of standard procedures?

A) batch process
B) make-to-order process
C) continuous process
D) none of the above
سؤال
When one of the following statements is true?

A) ERP evolved directly from MRP.
B) ERP evolved into MRP and MRP evolved into MRP II
C) MRP II evolved from MRP and MRP II evolved into ERP
D) None of the above is true.
سؤال
Which function is not a part of the batch production process?

A) Plan and control production
B) Prepare purchase orders
C) Maintain inventory control
D) Perform cost accounting
سؤال
A move ticket

A) is the formal plan and authority to begin production
B) specifies the materials and production required for each batch
C) records the work done in each work center
D) authorizes the storekeeper to release materials to work centers
سؤال
Which of the following is not an assumption of the Economic Order Quantity model?

A) demand for the product is known with certainty
B) total cost per year of placing orders is fixed
C) lead time is known and is constant
D) there are no quantity discounts
سؤال
The storekeeper releases raw materials based on the

A) production schedule
B) materials requisition
C) work order
D) bill of materials
سؤال
An example of a continuous process is the production of

A) wedding invitations
B) milk products
C) jet aircraft
D) all of the above
سؤال
A company's value stream map depicts only the value added activities needed to complete a process or product.
سؤال
Cost accounting initiates a WIP account upon receiving the first move ticket of a batch.
سؤال
Inventory control performs all of the following tasks except it

A) provides production planning and control with the inventory status report of finished goods
B) updates the raw material inventory records
C) prepares a materials requisition for each production batch
D) records the completed production as an increase to finished goods inventory
سؤال
The internal control significance of the excess materials requisition is that it

A) indicates the amount of material released to work centers
B) identifies materials used in production that exceed the standard amount allowed
C) indicates the standard quantities required for production
D) documents the return to raw materials inventory of unused production materials
سؤال
An excess materials requisition is a control that signals that a greater than standard quantity of materials is being ordered from the vendor.
سؤال
The purpose of the cost accounting system is to

A) produce information for inventory valuation
B) authorize release of raw materials
C) direct the movement of work-in-process
D) determine material requirements
سؤال
All of the following are characteristics of batch processing except

A) each item in the batch is similar
B) batches are produced in accordance with detailed customer specifications
C) batches are produced to replenish depleted inventory levels
D) setting up and retooling is required for different batches
سؤال
The inventory control function updates and maintains both raw materials and finished goods inventory subsidiary ledgers.
سؤال
Which statement is true?

A) World-class companies must maintain strategic agility and be able to turn on a dime.
B) World-class companies motivate and treat employees like appreciating assets.
C) Manufacturing firms that achieve world-class status do so by following a philosophy of lean manufacturing
D) All the above are true
سؤال
Which situation violates the segregation of functions control procedure?

A) production planning and control is located apart from the work centers
B) inventory control maintains custody of inventory items
C) cost accounting has custody of and makes entries on cost records
D) work centers record direct labor on job tickets
سؤال
Which of the following is not a problem associated with standard cost accounting?

A) Standard costing motivates management to produce large batches of products and build inventory.
B) Applying standard costing leads to product cost distortions in a lean environment.
C) Standard cost data are associated with excessive time lags that reduce its usefulness.
D) The financial orientation of standard costing may promote bad decisions.
E) All of the above are problems with standard costing.
سؤال
In traditional firms,information reporting

A) provides financially oriented information relating to operations
B) presents detailed information about activities
C) shows the allocation of costs first to activities and then to cost objects
D) identifies nonessential activities
سؤال
All of the following are internal control procedures that should be in place in the conversion cycle except

A) calculation and analysis of direct material and direct labor variances
B) retention of excess materials by work centers
C) physical count of inventory items on hand
D) limited access to raw material and finished goods inventories
سؤال
An example of automation of manufacturing design is

A) Computer Aided Engineering
B) Automated Storage and Retrieval Systems
C) Computer Numerical Control
D) robotics
سؤال
An example of automation of manufacturing planning is

A) Computer Aided Engineering
B) Automated Storage and Retrieval Systems
C) Materials Requirements Planning
D) Computer Numerical Control
سؤال
Which of the following is not true?

A) The complexities of ABC have caused many firms to pursue value stream accounting.
B) Value stream accounting captures costs related to value added activities within a specified department or activity.
C) An essential aspect in implementing value stream accounting is defining the product family.
D) Value stream accounting makes no distinction between direct costs and indirect costs.
سؤال
A flexible manufacturing system

A) creates bottlenecks in the process
B) leads to an "us" versus "them" attitude among workers
C) shortens the physical distance between activities
D) is organized along functional lines
سؤال
Which statement is not correct?

A) cost objects are the reasons for performing activities
B) cost object describes the work performed in a firm
C) activities cause costs
D) cost objects create a demand for activities
سؤال
The cost of poor quality includes all of the following except

A) cost of rework
B) warranty claims
C) scheduling delays
D) proceeds from the sale of scrap
سؤال
If the daily demand is 40 units and the lead time is 12 days,the reorder point is

A) 52 units
B) 48 units
C) 480 units
D) none of the above
سؤال
Characteristics of lean manufacturing include all of the following except

A) push manufacturing
B) zero defects
C) reduced setup time and small lot sizes
D) reliable vendors
سؤال
Firms are abandoning Activity Based Costing (ABC)because

A) it does not facilitates the analysis of variances
B) it is complex and time consuming
C) it does not recognize the importance of direct labor as a component of total manufacturing cost
D) the financial nature of the reports does not permit comparisons to be made among different types of products
سؤال
Deficiencies of the traditional cost accounting information system include all of the following except

A) an emphasis on financial performance
B) inaccurate cost allocations
C) an emphasis on standard costs
D) immediate feedback about deviations from the norm
سؤال
Computer integrated manufacturing includes all of the following technologies except

A) robotics
B) materials requirements planning
C) automated storage and retrieval systems
D) computer aided design
سؤال
Which of the following would not be included as a value stream cost?

A) Labor costs of employees who simply transport the product from cell to cell.
B) Labor costs of employees who design the product.
C) A charge per square foot for the value stream production facility including cost of rent and building maintenance.
D) All of the above are value stream costs
سؤال
Which statement is not correct?

A) general ledger creates a new cost record upon receipt of a work order from production planning and control
B) cost accounting updates the cost record with data gathered from the materials requisition
C) general ledger posts summary information about the manufacturing process based on a journal voucher prepared by cost accounting
D) cost accounting computes variances and applies overhead to individual cost records
سؤال
Which of the following statements about the EOQ inventory model assumptions is incorrect?

A) Demand for the product is constant and known with certainty.
B) The lead time is a variable.
C) All inventories in the order arrive at the same time.
D) Total ordering cost is a variable
سؤال
Process simplification focuses on

A) using Computer Numerical Controlled machines which stand alone within a traditional setting
B) completely automating the manufacturing environment
C) reducing the complexity of the physical manufacturing layout of the shop floor
D) organizing the process into functional departments
سؤال
A manufacturing process that is organized into group technology cells utilizing no human labor is called

A) islands of technology
B) process simplification
C) computer integrated manufacturing
D) traditional manufacturing
سؤال
What are the key segregation of duties issues in the conversion cycle?
سؤال
Explain the conversion cycle.
سؤال
Which statement is not correct?

A) Inventories provide a competitive advantage.
B) Inventories can invite overproduction.
C) Inventories are expensive to maintain.
D) Inventories may conceal problems.
سؤال
What is the difference between a materials requisition and a purchase requisition?
سؤال
List one authorization control in the traditional manufacturing environment.
سؤال
Discuss inventory control objectives.
سؤال
Traditional accounting assumes that products cause costs.ABC assumes that _________________ cause costs.
سؤال
Transaction authorization occurs in a traditional manufacturing environment in all of the following ways except

A) production planning and control initiates production with a work order
B) movement of the work through the production process follows the move ticket
C) the sales department modifies work orders to match changes in demand
D) the materials requisition authorizes the storekeeper to release materials to the work centers
سؤال
How are cost structures fundamentally different between the traditional and CIM environments?
سؤال
Describe the primary goal of lean manufacturing?
سؤال
What is meant by the term "islands of technology"?
سؤال
In a traditional manufacturing environment,cost accounting provides independent verification of what information? What are the benefits?
سؤال
What is one benefit of the flexible production system?
سؤال
All of the following are problems with traditional accounting information except:

A) Managers in a lean setting require immediate information.
B) The measurement principle tends to ignore standards other than money.
C) Standard costing motivates nonlean behavior in operations.
D) The overhead component in a manufacturing company is usually very large.
E) All of the above are problems associated with traditional accounting information.
سؤال
What information is contained in the bill of materials (BOM)?
سؤال
In Activity Based Costing,what is the term used to refer to the work performed by a firm?
سؤال
Which of the following is not a principle of lean manufacturing?

A) Products are pushed from the production end to the customer
B) All activities that do not add value and maximize the use of scarce resources must be eliminated
C) Achieve high inventory turnover rate.
D) A lean manufacturing firm must have established and cooperative relationships with vendors
E) All of the above are lean manufacturing principles.
سؤال
All of the following are documents in batch process production systems except

A) production schedule
B) route sheet
C) materials requisition
D) bill of manufacturing
سؤال
Which type of manufacturing creates a homogeneous product through a continuous series of standard procedures?
سؤال
List two disadvantages of using a traditional cost accounting system.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/102
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 7: The Conversion Cycle
1
Computer Integrated Manufacturing focuses on reducing the complexity of the physical manufacturing layout of the shop floor.
False
2
Cement and petrochemicals are produced by the batch manufacturing method.
False
3
A company's value stream includes all steps in a process,both essential and non-essential,for which the customer is willing to pay.
False
4
Accounting in a world-class manufacturing environment emphasizes standard cost and variance analysis.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
5
Batch processing creates a homogeneous product through a continuous series of standard procedures.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
6
The philosophy of customer satisfaction permeates the world-class firm.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
7
A purchase requisition authorizes the storekeeper to release materials to individuals or work centers in the production process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
8
The only objective of the Just-In-Time philosophy is to reduce inventory levels.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
9
The complexities of ABC have caused many firms to abandon this method in favor of a simpler accounting model called value stream accounting.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
10
Typically the only allocated cost in the value stream is a charge per square foot for the value stream production facility.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
11
The cost accounting system authorizes the release of raw materials into production.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
12
The bill of materials specifies the types and quantities of the raw materials and subassemblies used in producing a single unit of finished product.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
13
ABC assigns cost to cost objects based on their use of activities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
14
Reports generated by the cost accounting system include performance reports and budget reports.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
15
The work-in-process file is the subsidiary ledger for the work-in-process control account.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
16
The two subsystems of a traditional conversion cycle are the production system and the delivery system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
17
Lean manufacturing evolved from the Toyota Production System (TPS),which is based on the just-in-time (JIT)production model.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
18
Manufacturing resources planning (MRP II)has evolved into enterprise resource planning (ERP).
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
19
Move tickets authorize the storekeeper to release materials to work centers.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
20
The objective of the Economic Order Quantity model is to reduce total inventory costs by minimizing carrying costs and ordering costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
21
What is the economic order quantity if the annual demand is 10,000 units,set up cost of placing each order is $3 and the holding cost per unit per year is $2?

A) 174
B) 123
C) 245
D) none of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
22
Firms hold safety stock to compensate for

A) mathematical weaknesses of the Economic Order Quantity model
B) variations in lead time or daily demand
C) fluctuations in carrying costs
D) uncertainty in the estimation of ordering costs
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
23
The production schedule is

A) the expected demand for the firm's finished goods for a given year
B) the formal plan and authority to begin production
C) a description of the type and quantity of raw materials and subassemblies used to produce a single unit of finished product
D) the sequence of operations during manufacturing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
24
Pull processing involves pulling products from the consumer end (demand),rather than pushing them from the production end (supply).
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
25
Which process creates a homogeneous product through a continuous series of standard procedures?

A) batch process
B) make-to-order process
C) continuous process
D) none of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
26
When one of the following statements is true?

A) ERP evolved directly from MRP.
B) ERP evolved into MRP and MRP evolved into MRP II
C) MRP II evolved from MRP and MRP II evolved into ERP
D) None of the above is true.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
27
Which function is not a part of the batch production process?

A) Plan and control production
B) Prepare purchase orders
C) Maintain inventory control
D) Perform cost accounting
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
28
A move ticket

A) is the formal plan and authority to begin production
B) specifies the materials and production required for each batch
C) records the work done in each work center
D) authorizes the storekeeper to release materials to work centers
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
29
Which of the following is not an assumption of the Economic Order Quantity model?

A) demand for the product is known with certainty
B) total cost per year of placing orders is fixed
C) lead time is known and is constant
D) there are no quantity discounts
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
30
The storekeeper releases raw materials based on the

A) production schedule
B) materials requisition
C) work order
D) bill of materials
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
31
An example of a continuous process is the production of

A) wedding invitations
B) milk products
C) jet aircraft
D) all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
32
A company's value stream map depicts only the value added activities needed to complete a process or product.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
33
Cost accounting initiates a WIP account upon receiving the first move ticket of a batch.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
34
Inventory control performs all of the following tasks except it

A) provides production planning and control with the inventory status report of finished goods
B) updates the raw material inventory records
C) prepares a materials requisition for each production batch
D) records the completed production as an increase to finished goods inventory
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
35
The internal control significance of the excess materials requisition is that it

A) indicates the amount of material released to work centers
B) identifies materials used in production that exceed the standard amount allowed
C) indicates the standard quantities required for production
D) documents the return to raw materials inventory of unused production materials
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
36
An excess materials requisition is a control that signals that a greater than standard quantity of materials is being ordered from the vendor.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
37
The purpose of the cost accounting system is to

A) produce information for inventory valuation
B) authorize release of raw materials
C) direct the movement of work-in-process
D) determine material requirements
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
38
All of the following are characteristics of batch processing except

A) each item in the batch is similar
B) batches are produced in accordance with detailed customer specifications
C) batches are produced to replenish depleted inventory levels
D) setting up and retooling is required for different batches
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
39
The inventory control function updates and maintains both raw materials and finished goods inventory subsidiary ledgers.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
40
Which statement is true?

A) World-class companies must maintain strategic agility and be able to turn on a dime.
B) World-class companies motivate and treat employees like appreciating assets.
C) Manufacturing firms that achieve world-class status do so by following a philosophy of lean manufacturing
D) All the above are true
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
41
Which situation violates the segregation of functions control procedure?

A) production planning and control is located apart from the work centers
B) inventory control maintains custody of inventory items
C) cost accounting has custody of and makes entries on cost records
D) work centers record direct labor on job tickets
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
42
Which of the following is not a problem associated with standard cost accounting?

A) Standard costing motivates management to produce large batches of products and build inventory.
B) Applying standard costing leads to product cost distortions in a lean environment.
C) Standard cost data are associated with excessive time lags that reduce its usefulness.
D) The financial orientation of standard costing may promote bad decisions.
E) All of the above are problems with standard costing.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
43
In traditional firms,information reporting

A) provides financially oriented information relating to operations
B) presents detailed information about activities
C) shows the allocation of costs first to activities and then to cost objects
D) identifies nonessential activities
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
44
All of the following are internal control procedures that should be in place in the conversion cycle except

A) calculation and analysis of direct material and direct labor variances
B) retention of excess materials by work centers
C) physical count of inventory items on hand
D) limited access to raw material and finished goods inventories
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
45
An example of automation of manufacturing design is

A) Computer Aided Engineering
B) Automated Storage and Retrieval Systems
C) Computer Numerical Control
D) robotics
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
46
An example of automation of manufacturing planning is

A) Computer Aided Engineering
B) Automated Storage and Retrieval Systems
C) Materials Requirements Planning
D) Computer Numerical Control
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
47
Which of the following is not true?

A) The complexities of ABC have caused many firms to pursue value stream accounting.
B) Value stream accounting captures costs related to value added activities within a specified department or activity.
C) An essential aspect in implementing value stream accounting is defining the product family.
D) Value stream accounting makes no distinction between direct costs and indirect costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
48
A flexible manufacturing system

A) creates bottlenecks in the process
B) leads to an "us" versus "them" attitude among workers
C) shortens the physical distance between activities
D) is organized along functional lines
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
49
Which statement is not correct?

A) cost objects are the reasons for performing activities
B) cost object describes the work performed in a firm
C) activities cause costs
D) cost objects create a demand for activities
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
50
The cost of poor quality includes all of the following except

A) cost of rework
B) warranty claims
C) scheduling delays
D) proceeds from the sale of scrap
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
51
If the daily demand is 40 units and the lead time is 12 days,the reorder point is

A) 52 units
B) 48 units
C) 480 units
D) none of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
52
Characteristics of lean manufacturing include all of the following except

A) push manufacturing
B) zero defects
C) reduced setup time and small lot sizes
D) reliable vendors
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
53
Firms are abandoning Activity Based Costing (ABC)because

A) it does not facilitates the analysis of variances
B) it is complex and time consuming
C) it does not recognize the importance of direct labor as a component of total manufacturing cost
D) the financial nature of the reports does not permit comparisons to be made among different types of products
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
54
Deficiencies of the traditional cost accounting information system include all of the following except

A) an emphasis on financial performance
B) inaccurate cost allocations
C) an emphasis on standard costs
D) immediate feedback about deviations from the norm
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
55
Computer integrated manufacturing includes all of the following technologies except

A) robotics
B) materials requirements planning
C) automated storage and retrieval systems
D) computer aided design
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
56
Which of the following would not be included as a value stream cost?

A) Labor costs of employees who simply transport the product from cell to cell.
B) Labor costs of employees who design the product.
C) A charge per square foot for the value stream production facility including cost of rent and building maintenance.
D) All of the above are value stream costs
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
57
Which statement is not correct?

A) general ledger creates a new cost record upon receipt of a work order from production planning and control
B) cost accounting updates the cost record with data gathered from the materials requisition
C) general ledger posts summary information about the manufacturing process based on a journal voucher prepared by cost accounting
D) cost accounting computes variances and applies overhead to individual cost records
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
58
Which of the following statements about the EOQ inventory model assumptions is incorrect?

A) Demand for the product is constant and known with certainty.
B) The lead time is a variable.
C) All inventories in the order arrive at the same time.
D) Total ordering cost is a variable
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
59
Process simplification focuses on

A) using Computer Numerical Controlled machines which stand alone within a traditional setting
B) completely automating the manufacturing environment
C) reducing the complexity of the physical manufacturing layout of the shop floor
D) organizing the process into functional departments
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
60
A manufacturing process that is organized into group technology cells utilizing no human labor is called

A) islands of technology
B) process simplification
C) computer integrated manufacturing
D) traditional manufacturing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
61
What are the key segregation of duties issues in the conversion cycle?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
62
Explain the conversion cycle.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
63
Which statement is not correct?

A) Inventories provide a competitive advantage.
B) Inventories can invite overproduction.
C) Inventories are expensive to maintain.
D) Inventories may conceal problems.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
64
What is the difference between a materials requisition and a purchase requisition?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
65
List one authorization control in the traditional manufacturing environment.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
66
Discuss inventory control objectives.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
67
Traditional accounting assumes that products cause costs.ABC assumes that _________________ cause costs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
68
Transaction authorization occurs in a traditional manufacturing environment in all of the following ways except

A) production planning and control initiates production with a work order
B) movement of the work through the production process follows the move ticket
C) the sales department modifies work orders to match changes in demand
D) the materials requisition authorizes the storekeeper to release materials to the work centers
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
69
How are cost structures fundamentally different between the traditional and CIM environments?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
70
Describe the primary goal of lean manufacturing?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
71
What is meant by the term "islands of technology"?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
72
In a traditional manufacturing environment,cost accounting provides independent verification of what information? What are the benefits?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
73
What is one benefit of the flexible production system?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
74
All of the following are problems with traditional accounting information except:

A) Managers in a lean setting require immediate information.
B) The measurement principle tends to ignore standards other than money.
C) Standard costing motivates nonlean behavior in operations.
D) The overhead component in a manufacturing company is usually very large.
E) All of the above are problems associated with traditional accounting information.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
75
What information is contained in the bill of materials (BOM)?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
76
In Activity Based Costing,what is the term used to refer to the work performed by a firm?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
77
Which of the following is not a principle of lean manufacturing?

A) Products are pushed from the production end to the customer
B) All activities that do not add value and maximize the use of scarce resources must be eliminated
C) Achieve high inventory turnover rate.
D) A lean manufacturing firm must have established and cooperative relationships with vendors
E) All of the above are lean manufacturing principles.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
78
All of the following are documents in batch process production systems except

A) production schedule
B) route sheet
C) materials requisition
D) bill of manufacturing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
79
Which type of manufacturing creates a homogeneous product through a continuous series of standard procedures?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
80
List two disadvantages of using a traditional cost accounting system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 102 في هذه المجموعة.