Deck 5: Electrical Installations: Inspection, Testing and Commissioning

ملء الشاشة (f)
exit full mode
سؤال
A standard form completed by every employee to inform the employer of the time spent working on a particular site is called:

A) job sheet
B) time sheet
C) delivery note
D) daywork sheet.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Identify the statutory regulations from the following list:

A) Health and Safety at Work Act 1974
B) BSI Kite Safety Mark
C) Electricity at Work Regulations 1989
D) IET Regulations BS 7671: 2008.
سؤال
Everyone in the workplace has this responsibility for safety:

A) First aid
B) Slips, trips and falls
C) Maintenance of tools and equipment
D) Duty of care.
سؤال
The person who is the company representative responsible for electrical safety in the work environment is called the:

A) Supervisor
B) Duty of care
C) Duty holder
D) Competent person.
سؤال
Identify the non-statutory regulations from the following list which impact upon electrical systems:

A) Health and Safety at Work Act 1974
B) Electricity at Work Regulations 1989
C) IET Regulations BS 7671: 2008
D) BSI Kite Safety Mark.
سؤال
A site plan has a scale of 1:100. From the scale drawing you can see that a socket outlet must be positioned on a wall 40 cm from the corner of the room in which you are standing. How far from the corner of the room would you actually measure to the centre of the socket's fixing position taking the scale into account?

A) 0.4 m
B) 4.0 m
C) 10.0 m
D) 40.0 m.
سؤال
A diagram which shows most clearly how a circuit works, with all items represented by graphical symbols, is a description of a:

A) block diagram
B) site plan or layout diagram
C) wiring diagram
D) circuit diagram.
سؤال
A diagram which shows the detailed connections between individual items of equipment is a description of a:

A) block diagram
B) site plan or layout diagram
C) wiring diagram
D) circuit diagram.
سؤال
A scale drawing showing the position of equipment by graphical symbols is a description of a:

A) block diagram
B) site plan or layout diagram
C) wiring diagram
D) circuit diagram.
سؤال
The scale drawing which shows the actual position of the electrical equipment upon completion of the contract is called a:

A) wiring diagram
B) detail assembly drawing
C) site plan or layout drawing
D) as-fitted drawing.
سؤال
A scale drawing which shows the original intention for the position of electrical equipment is called a:

A) wiring diagram
B) detail assembly drawing
C) site plan or layout drawing
D) as-fitted drawing.
سؤال
A standard form which records changes or extra work on a large project is called a:

A) job sheet
B) time sheet
C) delivery note
D) daywork sheet.
سؤال
A standard form containing information about work to be done usually distributed by a manager to an electrician is called:

A) job sheet
B) time sheet
C) delivery note
D) daywork sheet.
سؤال
A record which confirms that materials ordered have been delivered to site is called:

A) job sheet
B) time sheet
C) delivery note
D) daywork sheet.
سؤال
Employers of companies employing more than five people must:

A) become a member of the NICEIC
B) provide PPE if appropriate
C) carry out a hazard risk assessment
D) display a health and safety poster.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/15
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 5: Electrical Installations: Inspection, Testing and Commissioning
1
A standard form completed by every employee to inform the employer of the time spent working on a particular site is called:

A) job sheet
B) time sheet
C) delivery note
D) daywork sheet.
time sheet
2
Identify the statutory regulations from the following list:

A) Health and Safety at Work Act 1974
B) BSI Kite Safety Mark
C) Electricity at Work Regulations 1989
D) IET Regulations BS 7671: 2008.
Health and Safety at Work Act 1974
Electricity at Work Regulations 1989
3
Everyone in the workplace has this responsibility for safety:

A) First aid
B) Slips, trips and falls
C) Maintenance of tools and equipment
D) Duty of care.
Duty of care.
4
The person who is the company representative responsible for electrical safety in the work environment is called the:

A) Supervisor
B) Duty of care
C) Duty holder
D) Competent person.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
5
Identify the non-statutory regulations from the following list which impact upon electrical systems:

A) Health and Safety at Work Act 1974
B) Electricity at Work Regulations 1989
C) IET Regulations BS 7671: 2008
D) BSI Kite Safety Mark.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
6
A site plan has a scale of 1:100. From the scale drawing you can see that a socket outlet must be positioned on a wall 40 cm from the corner of the room in which you are standing. How far from the corner of the room would you actually measure to the centre of the socket's fixing position taking the scale into account?

A) 0.4 m
B) 4.0 m
C) 10.0 m
D) 40.0 m.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
7
A diagram which shows most clearly how a circuit works, with all items represented by graphical symbols, is a description of a:

A) block diagram
B) site plan or layout diagram
C) wiring diagram
D) circuit diagram.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
8
A diagram which shows the detailed connections between individual items of equipment is a description of a:

A) block diagram
B) site plan or layout diagram
C) wiring diagram
D) circuit diagram.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
9
A scale drawing showing the position of equipment by graphical symbols is a description of a:

A) block diagram
B) site plan or layout diagram
C) wiring diagram
D) circuit diagram.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
10
The scale drawing which shows the actual position of the electrical equipment upon completion of the contract is called a:

A) wiring diagram
B) detail assembly drawing
C) site plan or layout drawing
D) as-fitted drawing.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
11
A scale drawing which shows the original intention for the position of electrical equipment is called a:

A) wiring diagram
B) detail assembly drawing
C) site plan or layout drawing
D) as-fitted drawing.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
12
A standard form which records changes or extra work on a large project is called a:

A) job sheet
B) time sheet
C) delivery note
D) daywork sheet.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
13
A standard form containing information about work to be done usually distributed by a manager to an electrician is called:

A) job sheet
B) time sheet
C) delivery note
D) daywork sheet.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
14
A record which confirms that materials ordered have been delivered to site is called:

A) job sheet
B) time sheet
C) delivery note
D) daywork sheet.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
15
Employers of companies employing more than five people must:

A) become a member of the NICEIC
B) provide PPE if appropriate
C) carry out a hazard risk assessment
D) display a health and safety poster.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 15 في هذه المجموعة.