Deck 2: Construction Terminology: Window Frames, Footings, and Building Materials

ملء الشاشة (f)
exit full mode
سؤال
The bottom or lowermost horizontal part of a window frame is known as

A)sill
B)mullion
C)transom
D)horn
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
In a Mac Arthur pile, the core and the casting are together driven into the ground to the required depth.
سؤال
A combined footing is commonly used

A)when two columns are spaced close to each other
B)when two columns are spaced far apart
C)under a set of columns
D)under a set of walls
سؤال
The minimum covering of the reinforcement for the pre-cast reinforced piles used in sea water, is

A)40 mm
B)55 mm
C)75 mm
D)100 mm
سؤال
When the walls are subjected to heavy loading and the bearing capacity of the soil is very low, then the wall is constructed on

A)reinforced concrete footing
B)column footing
C)lean concrete footing
D)none of these
سؤال
Frog is defined as a

A)depression on the top face of a brick
B)topmost course of plinth
C)brick whose one end is cut splayed or mitred for the full width
D)brick used for the corner of a wall
سؤال
The external jamb of a door or window opening at right angles to the wall face, is called

A)reveals
B)styles
C)posts
D)jambs
سؤال
The nogging, in a brick nogged partition wall, is a intermediate horizontal wooden member.
سؤال
An open-newel stair consists of two or more straight flights arranged in such a manner that a clear space occurs between the backward and forward flights.
سؤال
In air conditioned building, a door has to serve both purposes of opening and closing. The most suitable type of door for this purpose is

A)sliding door
B)swinging door
C)revolving door
D)none of these
سؤال
A horizontal member of stone, concrete or wood provided to give support for the vertical members of a wooden window, is called

A)jamb
B)reveal
C)sill
D)quoin
سؤال
The coupled roof is suitable for spans upto

A)3.5 m
B)5 m
C)6.5 m
D)8 m
سؤال
A course of stone provided immediately below a cornice, is called

A)blocking course
B)coping
C)frieze
D)parapet
سؤال
A partition wall is designed as a no load bearing wall.
سؤال
In a Raymond pile

A)the length varies from 6 to 12 m
B)the diameter at the top varies from 400 to 600 mm and the diameter at the base varies from 200 to 280 mm
C)the thickness of the outer shell depends upon the pile diameter and site conditions
D)all of the above
سؤال
In case of buildings without basement, the best position for damp-proof course (D.P.C.) lies at

A)plinth level
B)ground level
C)150 mm above plinth level
D)150 mm above ground level
سؤال
The lower portion of an arch between the skew back and crown is called

A)depth
B)rise
C)haunch
D)intrados
سؤال
The ability of sub-soil to support the load of the structure without yielding is known as

A)bearing value of soil
B)bearing power of soil
C)bearing capacity of soil
D)any one of these
سؤال
Sheet piles are made of

A)wood
B)steel
C)concrete
D)all of these
سؤال
The type of pointing in which the mortar is first pressed into the raked joints and then finished off flush with the edges of the bricks or stones, is called

A)flust pointing
B)struck pointing
C)V-grooved pointing
D)tuck pointing
سؤال
Which of the following statement is correct?

A)The flat members connecting the jambs at the top is called head.
B)The head is of the same size as the jamb
C)The jamb are tennoned into the head and wedged.
D)all of the above
سؤال
The depth of the concrete bed placed at the bottom of a wall footing should never be less than its projection beyond the wall base.
سؤال
The centre to centre spacing of lateral reinforcement in pre-cast reinforced concrete piles should not exceed

A)half
B)equal to
C)double
D)three times
سؤال
A semi-rigid material which forms an excellent impervious layer for damp-proofing, is called

A)bitumen
B)mastic asphalt
C)aluminal
D)bituminous felt
سؤال
A queen post truss is commonly used for spans

A)upto 3.5 m
B)from 3.5 to 5 m
C)from 5 to 8 m
D)from 8 to 12 m
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/25
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 2: Construction Terminology: Window Frames, Footings, and Building Materials
1
The bottom or lowermost horizontal part of a window frame is known as

A)sill
B)mullion
C)transom
D)horn
sill
2
In a Mac Arthur pile, the core and the casting are together driven into the ground to the required depth.
True
3
A combined footing is commonly used

A)when two columns are spaced close to each other
B)when two columns are spaced far apart
C)under a set of columns
D)under a set of walls
when two columns are spaced close to each other
4
The minimum covering of the reinforcement for the pre-cast reinforced piles used in sea water, is

A)40 mm
B)55 mm
C)75 mm
D)100 mm
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
5
When the walls are subjected to heavy loading and the bearing capacity of the soil is very low, then the wall is constructed on

A)reinforced concrete footing
B)column footing
C)lean concrete footing
D)none of these
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
6
Frog is defined as a

A)depression on the top face of a brick
B)topmost course of plinth
C)brick whose one end is cut splayed or mitred for the full width
D)brick used for the corner of a wall
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
7
The external jamb of a door or window opening at right angles to the wall face, is called

A)reveals
B)styles
C)posts
D)jambs
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
8
The nogging, in a brick nogged partition wall, is a intermediate horizontal wooden member.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
9
An open-newel stair consists of two or more straight flights arranged in such a manner that a clear space occurs between the backward and forward flights.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
10
In air conditioned building, a door has to serve both purposes of opening and closing. The most suitable type of door for this purpose is

A)sliding door
B)swinging door
C)revolving door
D)none of these
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
11
A horizontal member of stone, concrete or wood provided to give support for the vertical members of a wooden window, is called

A)jamb
B)reveal
C)sill
D)quoin
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
12
The coupled roof is suitable for spans upto

A)3.5 m
B)5 m
C)6.5 m
D)8 m
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
13
A course of stone provided immediately below a cornice, is called

A)blocking course
B)coping
C)frieze
D)parapet
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
14
A partition wall is designed as a no load bearing wall.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
15
In a Raymond pile

A)the length varies from 6 to 12 m
B)the diameter at the top varies from 400 to 600 mm and the diameter at the base varies from 200 to 280 mm
C)the thickness of the outer shell depends upon the pile diameter and site conditions
D)all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
16
In case of buildings without basement, the best position for damp-proof course (D.P.C.) lies at

A)plinth level
B)ground level
C)150 mm above plinth level
D)150 mm above ground level
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
17
The lower portion of an arch between the skew back and crown is called

A)depth
B)rise
C)haunch
D)intrados
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
18
The ability of sub-soil to support the load of the structure without yielding is known as

A)bearing value of soil
B)bearing power of soil
C)bearing capacity of soil
D)any one of these
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
19
Sheet piles are made of

A)wood
B)steel
C)concrete
D)all of these
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
20
The type of pointing in which the mortar is first pressed into the raked joints and then finished off flush with the edges of the bricks or stones, is called

A)flust pointing
B)struck pointing
C)V-grooved pointing
D)tuck pointing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
21
Which of the following statement is correct?

A)The flat members connecting the jambs at the top is called head.
B)The head is of the same size as the jamb
C)The jamb are tennoned into the head and wedged.
D)all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
22
The depth of the concrete bed placed at the bottom of a wall footing should never be less than its projection beyond the wall base.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
23
The centre to centre spacing of lateral reinforcement in pre-cast reinforced concrete piles should not exceed

A)half
B)equal to
C)double
D)three times
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
24
A semi-rigid material which forms an excellent impervious layer for damp-proofing, is called

A)bitumen
B)mastic asphalt
C)aluminal
D)bituminous felt
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
25
A queen post truss is commonly used for spans

A)upto 3.5 m
B)from 3.5 to 5 m
C)from 5 to 8 m
D)from 8 to 12 m
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.