Deck 8: Project Management and Quality Control

ملء الشاشة (f)
exit full mode
سؤال
The three stages of the change process are:

A)unfreezing, adjustment, and refreezing.
B)adjustment, unfreezing, and refreezing.
C)adjustment, unfreezing, and re-adjustment.
D)adjustment, re-adjustment, and unfreezing.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
The five stages of the coping cycle are (in order):

A)Denial, defence, discarding, adaptation, internalization
B)Defence, denial, discarding, adaptation, internalization
C)Denial, resistance, discarding, adaptation, internalization
D)Denial, defence, resistance, adaptation, internalization
سؤال
Dunphy and Stace (1993) identified:

A)Three styles of change management
B)Two styles of change management
C)Four styles of change management
D)Five styles of change management
سؤال
Improving quality through small, incremental improvements is a characteristic of what type of quality management system?

A)Just-in-time
B)Six Sigma
C)Total Quality Management
D)Kaizen
سؤال
Where was Total Quality Management first developed?

A)USA
B)UK
C)Japan
D)Korea
سؤال
Which of the following are key components of a Total Quality Management system?

A)Individual responsibility, incremental improvement, use of raw data
B)Collective responsibility, continual improvement, use of raw data
C)Group responsibility, staged improvement, knowledge
D)Involves everyone, continual improvement, use of data and knowledge
سؤال
What is the term for the monitoring of events both internal and external to the organisation that affects strategy?

A)Operational control
B)Strategic surveillance
C)Strategic control
D)Environmental scanning
سؤال
"How will conflicts over resources/facility usage between this and other projects be settled?", is critically settled at level

A)Main program
B)Project formation
C)Project Buildup
D)Project Buildup.
سؤال
Level which includes disposition of project's assets and personnel, is

A)First Stage
B)Second Stage
C)Third stage
D)Fourth stage
سؤال
A mean for monitoring and controlling organization's strategic projects is

A)Project Monitoring process
B)Project Portfolio Process
C)Project Portfolio Plan
D)Project Portfolio Phase
سؤال
Projects provide an excellent growth environment for future executives and for developing

A)Sales skills
B)Manufacturing skills
C)Managerial skills
D)Execution skills
سؤال
Favored technique for resolving conflict is

A)Negotiating
B)Conciliation
C)Removal of participants
D)Not entertaining them
سؤال
What is the critical path through the network above?

A)ABGHIF
B)ABDEF
C)ABGHIF& ABDEF
D)ABCEF
سؤال
What would be the critical path if the duration of activity C increased to 10?

A)ABCF
B)ABCEF
C)ABGHIF
D)ABGHIF & ABDEF
سؤال
If the Earned Value is equal to Actual Cost, it means:

A)Project is on budget and on schedule
B)Schedule Variance Index is 1
C)There is no schedule variance
D)There is no cost variance
سؤال
A critical path network diagram does NOT:

A)Help determine the amount of float
B)Identify the particularly important activities
C)Calculate earned value
D)Calculate the duration of the whole project
سؤال
A Gantt chart is used to show a project timeline diagramatically.
سؤال
Changes to the project involve moving from:

A)Project control stage to project definition stage
B)Project control stage to project planning stage
C)Project control stage to understanding the project environment stage
D)None of the above
سؤال
The project life cycle consists of

A)Understanding the scope of the project
B)Objectives of the project
C)Formulation and planning various activities
D)All of the above
سؤال
Developing a technology is an example of

A)Process
B)Project
C)Scope
D)All of the above
سؤال
Resource requirement in project becomes constant while the project is in its _____ progress stage.

A)40 to 55%
B)55 to 70%
C)70 to 80%
D)80 to 95%
سؤال
Five dimensions that must be managed on a project

A)Constraint, Quality, Cost, Schedule, Staff
B)Features, Quality, Cost, Schedule, Staff
C)Features, priority, Cost, Schedule, Staff
D)Features, Quality, Cost, Schedule, customer
سؤال
Considers the total cost of ownership, or development plus support costs, for a project.

A)Learning Curve Theory
B)Life Cycle Costing
C)Parametric Modeling
D)Rate of Performance
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/23
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 8: Project Management and Quality Control
1
The three stages of the change process are:

A)unfreezing, adjustment, and refreezing.
B)adjustment, unfreezing, and refreezing.
C)adjustment, unfreezing, and re-adjustment.
D)adjustment, re-adjustment, and unfreezing.
unfreezing, adjustment, and refreezing.
2
The five stages of the coping cycle are (in order):

A)Denial, defence, discarding, adaptation, internalization
B)Defence, denial, discarding, adaptation, internalization
C)Denial, resistance, discarding, adaptation, internalization
D)Denial, defence, resistance, adaptation, internalization
Denial, defence, discarding, adaptation, internalization
3
Dunphy and Stace (1993) identified:

A)Three styles of change management
B)Two styles of change management
C)Four styles of change management
D)Five styles of change management
Four styles of change management
4
Improving quality through small, incremental improvements is a characteristic of what type of quality management system?

A)Just-in-time
B)Six Sigma
C)Total Quality Management
D)Kaizen
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 23 في هذه المجموعة.
فتح الحزمة
k this deck
5
Where was Total Quality Management first developed?

A)USA
B)UK
C)Japan
D)Korea
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 23 في هذه المجموعة.
فتح الحزمة
k this deck
6
Which of the following are key components of a Total Quality Management system?

A)Individual responsibility, incremental improvement, use of raw data
B)Collective responsibility, continual improvement, use of raw data
C)Group responsibility, staged improvement, knowledge
D)Involves everyone, continual improvement, use of data and knowledge
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 23 في هذه المجموعة.
فتح الحزمة
k this deck
7
What is the term for the monitoring of events both internal and external to the organisation that affects strategy?

A)Operational control
B)Strategic surveillance
C)Strategic control
D)Environmental scanning
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 23 في هذه المجموعة.
فتح الحزمة
k this deck
8
"How will conflicts over resources/facility usage between this and other projects be settled?", is critically settled at level

A)Main program
B)Project formation
C)Project Buildup
D)Project Buildup.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 23 في هذه المجموعة.
فتح الحزمة
k this deck
9
Level which includes disposition of project's assets and personnel, is

A)First Stage
B)Second Stage
C)Third stage
D)Fourth stage
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 23 في هذه المجموعة.
فتح الحزمة
k this deck
10
A mean for monitoring and controlling organization's strategic projects is

A)Project Monitoring process
B)Project Portfolio Process
C)Project Portfolio Plan
D)Project Portfolio Phase
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 23 في هذه المجموعة.
فتح الحزمة
k this deck
11
Projects provide an excellent growth environment for future executives and for developing

A)Sales skills
B)Manufacturing skills
C)Managerial skills
D)Execution skills
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 23 في هذه المجموعة.
فتح الحزمة
k this deck
12
Favored technique for resolving conflict is

A)Negotiating
B)Conciliation
C)Removal of participants
D)Not entertaining them
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 23 في هذه المجموعة.
فتح الحزمة
k this deck
13
What is the critical path through the network above?

A)ABGHIF
B)ABDEF
C)ABGHIF& ABDEF
D)ABCEF
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 23 في هذه المجموعة.
فتح الحزمة
k this deck
14
What would be the critical path if the duration of activity C increased to 10?

A)ABCF
B)ABCEF
C)ABGHIF
D)ABGHIF & ABDEF
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 23 في هذه المجموعة.
فتح الحزمة
k this deck
15
If the Earned Value is equal to Actual Cost, it means:

A)Project is on budget and on schedule
B)Schedule Variance Index is 1
C)There is no schedule variance
D)There is no cost variance
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 23 في هذه المجموعة.
فتح الحزمة
k this deck
16
A critical path network diagram does NOT:

A)Help determine the amount of float
B)Identify the particularly important activities
C)Calculate earned value
D)Calculate the duration of the whole project
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 23 في هذه المجموعة.
فتح الحزمة
k this deck
17
A Gantt chart is used to show a project timeline diagramatically.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 23 في هذه المجموعة.
فتح الحزمة
k this deck
18
Changes to the project involve moving from:

A)Project control stage to project definition stage
B)Project control stage to project planning stage
C)Project control stage to understanding the project environment stage
D)None of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 23 في هذه المجموعة.
فتح الحزمة
k this deck
19
The project life cycle consists of

A)Understanding the scope of the project
B)Objectives of the project
C)Formulation and planning various activities
D)All of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 23 في هذه المجموعة.
فتح الحزمة
k this deck
20
Developing a technology is an example of

A)Process
B)Project
C)Scope
D)All of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 23 في هذه المجموعة.
فتح الحزمة
k this deck
21
Resource requirement in project becomes constant while the project is in its _____ progress stage.

A)40 to 55%
B)55 to 70%
C)70 to 80%
D)80 to 95%
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 23 في هذه المجموعة.
فتح الحزمة
k this deck
22
Five dimensions that must be managed on a project

A)Constraint, Quality, Cost, Schedule, Staff
B)Features, Quality, Cost, Schedule, Staff
C)Features, priority, Cost, Schedule, Staff
D)Features, Quality, Cost, Schedule, customer
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 23 في هذه المجموعة.
فتح الحزمة
k this deck
23
Considers the total cost of ownership, or development plus support costs, for a project.

A)Learning Curve Theory
B)Life Cycle Costing
C)Parametric Modeling
D)Rate of Performance