Deck 9: Cost, Risk, and Project Selection in Project Management

ملء الشاشة (f)
exit full mode
سؤال
Relationship based on unrelated level of activity and past data of cost is measured with help of

A)cost estimation
B)price estimation
C)unit estimation
D)production estimation
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
In estimation of cost functions, variations in a single activity level represents the

A)related total costs
B)related fixed cost
C)related variable cost
D)related per unit cost
سؤال
The latest finish time for an activity:

A)Equals the min. of LFT ? t for all immediate successors
B)Equals the max. of LFT ? t for all immediate predecessors.
C)Equals the max. of EST + t for all immediate predecessors.
D)Equals the min. of EST + t for all immediate successors.
سؤال
Which of the following statements is true?

A)PERT is considered as a deterministic approach and CPM is a probabilistic techniques.
B)PERT is considered as a probabilistic techniques and CPM is considered as a deterministic approach.
C)PERT and CPM are both probabilistic techniques.
D)PERT and CPM are both considered as deterministic approachs.
سؤال
In corporate costs, cost incurred to finance construction of new equipment are classified as

A)treasury costs
B)discretionary costs
C)human resource management costs
D)corporate administration costs
سؤال
Evaluation process of proposed projects or groups of projects is known as:

A)Project Analysis
B)Project Compilation
C)Project selection
D)Project Documentation
سؤال
Nature of interrelationships between components in a system defines the

A)Function of system
B)Structure of system
C)Environment of system
D)Platform of system
سؤال
Listing goals of each existing and proposed project is first step in

A)Data Collection
B)Establishment of Project council
C)Prioritizing the projects
D)Identification of project categories
سؤال
For any project word objective is held to be synonymous with

A)Fact
B)Option
C)Opinion
D)Assumption
سؤال
Which of these is not one of the constraints of a project?

A)Scope
B)Resources
C)Team
D)Budget
سؤال
Which of the following is not correct about initial phase of a project?

A)The cost associated at the beginning of the project is highest.
B)Stakeholders have maximum influence during this phase
C)The highest uncertainty is at this stage of the project.
D)All the above statements are correct.
سؤال
Which is the first stage in the project management model?

A)Understanding the project environment
B)Project definition
C)Project control
D)Project planning
سؤال
A clear hierarchy of objectives in the project definition would NOT normally contain:

A)The purpose
B)An End result
C)Success criteria
D)Control mechanisms
سؤال
Which of the following is a factor that influences project selection?

A)Perceived and real needs
B)List of potential and ongoing projects
C)Current organizational environment
D)All of the above
سؤال
The primary deliverable from the project identification and selection phase is a:

A)schedule of specific IS development projects.
B)Statement of Work.
C)mission statement.
D)design strategy.
سؤال
When classifying and ranking projects, which of the following refers to the amount and type of resources the project requires and their availability?

A)Value chain availability
B)Business placement
C)Resource availability
D)Potential benefits
سؤال
When classifying and ranking projects, which of the following refers to the extent to which the project is viewed as helping the organization achieve its strategic objectives and longterm goals?

A)Resource availability
B)Business placement
C)Strategic alignment
D)Potential benefits
سؤال
During feasibility analysis it is necessary to examine several alternative solutions because
(i) a comparison of alternatives will lead to a cost-effective solution
(ii) a pre-conceived single solution may turn out to be unimplementable
(iii) it is always good to examine alternatives
(iv) management normally looks at alternatives

A)i and iii
B)i and iv
C)i and ii
D)ii and iv
سؤال
Goals are identified by

A)discussion with all concerned
B)pinpointing unsatisfactory performance
C)finding poor management
D)examining a variety of documents
سؤال
By technical feasibility of a solution we mean that

A)technology is available to implement it
B)persons are available to implement it
C)persons have technical ability to implement it
D)funds are available to implement it
سؤال
By operational feasibility we mean

A)the system can be operated nicely
B)the system is unusable by operators
C)the system can be adapted by an organization without major disruptions
D)the system can be implemented
سؤال
By economic feasibility of a system we mean that

A)it is economical to operate
B)it is expensive to operate
C)it will be cost-effective if implemented
D)finances are available to implement the system and it will be cost - effective
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/22
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 9: Cost, Risk, and Project Selection in Project Management
1
Relationship based on unrelated level of activity and past data of cost is measured with help of

A)cost estimation
B)price estimation
C)unit estimation
D)production estimation
cost estimation
2
In estimation of cost functions, variations in a single activity level represents the

A)related total costs
B)related fixed cost
C)related variable cost
D)related per unit cost
related total costs
3
The latest finish time for an activity:

A)Equals the min. of LFT ? t for all immediate successors
B)Equals the max. of LFT ? t for all immediate predecessors.
C)Equals the max. of EST + t for all immediate predecessors.
D)Equals the min. of EST + t for all immediate successors.
Equals the min. of LFT ? t for all immediate successors
4
Which of the following statements is true?

A)PERT is considered as a deterministic approach and CPM is a probabilistic techniques.
B)PERT is considered as a probabilistic techniques and CPM is considered as a deterministic approach.
C)PERT and CPM are both probabilistic techniques.
D)PERT and CPM are both considered as deterministic approachs.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 22 في هذه المجموعة.
فتح الحزمة
k this deck
5
In corporate costs, cost incurred to finance construction of new equipment are classified as

A)treasury costs
B)discretionary costs
C)human resource management costs
D)corporate administration costs
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 22 في هذه المجموعة.
فتح الحزمة
k this deck
6
Evaluation process of proposed projects or groups of projects is known as:

A)Project Analysis
B)Project Compilation
C)Project selection
D)Project Documentation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 22 في هذه المجموعة.
فتح الحزمة
k this deck
7
Nature of interrelationships between components in a system defines the

A)Function of system
B)Structure of system
C)Environment of system
D)Platform of system
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 22 في هذه المجموعة.
فتح الحزمة
k this deck
8
Listing goals of each existing and proposed project is first step in

A)Data Collection
B)Establishment of Project council
C)Prioritizing the projects
D)Identification of project categories
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 22 في هذه المجموعة.
فتح الحزمة
k this deck
9
For any project word objective is held to be synonymous with

A)Fact
B)Option
C)Opinion
D)Assumption
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 22 في هذه المجموعة.
فتح الحزمة
k this deck
10
Which of these is not one of the constraints of a project?

A)Scope
B)Resources
C)Team
D)Budget
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 22 في هذه المجموعة.
فتح الحزمة
k this deck
11
Which of the following is not correct about initial phase of a project?

A)The cost associated at the beginning of the project is highest.
B)Stakeholders have maximum influence during this phase
C)The highest uncertainty is at this stage of the project.
D)All the above statements are correct.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 22 في هذه المجموعة.
فتح الحزمة
k this deck
12
Which is the first stage in the project management model?

A)Understanding the project environment
B)Project definition
C)Project control
D)Project planning
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 22 في هذه المجموعة.
فتح الحزمة
k this deck
13
A clear hierarchy of objectives in the project definition would NOT normally contain:

A)The purpose
B)An End result
C)Success criteria
D)Control mechanisms
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 22 في هذه المجموعة.
فتح الحزمة
k this deck
14
Which of the following is a factor that influences project selection?

A)Perceived and real needs
B)List of potential and ongoing projects
C)Current organizational environment
D)All of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 22 في هذه المجموعة.
فتح الحزمة
k this deck
15
The primary deliverable from the project identification and selection phase is a:

A)schedule of specific IS development projects.
B)Statement of Work.
C)mission statement.
D)design strategy.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 22 في هذه المجموعة.
فتح الحزمة
k this deck
16
When classifying and ranking projects, which of the following refers to the amount and type of resources the project requires and their availability?

A)Value chain availability
B)Business placement
C)Resource availability
D)Potential benefits
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 22 في هذه المجموعة.
فتح الحزمة
k this deck
17
When classifying and ranking projects, which of the following refers to the extent to which the project is viewed as helping the organization achieve its strategic objectives and longterm goals?

A)Resource availability
B)Business placement
C)Strategic alignment
D)Potential benefits
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 22 في هذه المجموعة.
فتح الحزمة
k this deck
18
During feasibility analysis it is necessary to examine several alternative solutions because
(i) a comparison of alternatives will lead to a cost-effective solution
(ii) a pre-conceived single solution may turn out to be unimplementable
(iii) it is always good to examine alternatives
(iv) management normally looks at alternatives

A)i and iii
B)i and iv
C)i and ii
D)ii and iv
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 22 في هذه المجموعة.
فتح الحزمة
k this deck
19
Goals are identified by

A)discussion with all concerned
B)pinpointing unsatisfactory performance
C)finding poor management
D)examining a variety of documents
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 22 في هذه المجموعة.
فتح الحزمة
k this deck
20
By technical feasibility of a solution we mean that

A)technology is available to implement it
B)persons are available to implement it
C)persons have technical ability to implement it
D)funds are available to implement it
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 22 في هذه المجموعة.
فتح الحزمة
k this deck
21
By operational feasibility we mean

A)the system can be operated nicely
B)the system is unusable by operators
C)the system can be adapted by an organization without major disruptions
D)the system can be implemented
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 22 في هذه المجموعة.
فتح الحزمة
k this deck
22
By economic feasibility of a system we mean that

A)it is economical to operate
B)it is expensive to operate
C)it will be cost-effective if implemented
D)finances are available to implement the system and it will be cost - effective
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 22 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 22 في هذه المجموعة.