Deck 1: Construction Contracts and Organizations

ملء الشاشة (f)
exit full mode
سؤال
In which of the following stages contract documents are prepared?

A)Planning stage
B)Briefing stage
C)Construction stage
D)None of the above
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
In which of the following stages specifications are prepared?

A)Planning stage
B)Briefing stage
C)Construction stage
D)None of the above
سؤال
In which of the following stages practicability of project is ensured?

A)Planning stage
B)Briefing stage
C)Construction stage
D)None of the above
سؤال
Which of the following is not role of contractor

A)To arrange land
B)To provide resources as per condition of contract
C)To work as per plans and specifications
D)To put RA and final bill and bill for extra item
سؤال
Which of the following is not role of owner

A)To arrange fund
B)To arrange land
C)To ensure quality of construction
D)To arrange necessary approvals
سؤال
Which of the following organization is widely used in PWD

A)Matrix organization
B)Line or military organization
C)Line and staff organization
D)Functional organization
سؤال
Which of the following is/are disadvantage/s of Line and Staff organization?

A)Experts may not have authority to work properly.
B)Conflict between line and staff persons
C)Increase in overhead cost due to high salary of staff
D)All of the Above
سؤال
In which of the following organization expert advice is available?

A)Matrix organization
B)Line or military organization
C)Line and staff organization
D)Functional organization
سؤال
Which organization permits quick decision?

A)Matrix organization
B)Line or military organization
C)Line and staff organization
D)none
سؤال
Which of the following is not a characteristics of a Good organization?

A)It must have an organization goal
B)It should have proper structure
C)It should be as big as possible
D)It should include all the activities without repeation
سؤال
Road is the example of

A)Building constructions.
B)Infrastructure construction.
C)Industrial construction.
D)Special purpose projects
سؤال
What is Span of management?

A)It is the number of persons to be supervised by a manager
B)It is the number of years for management to remain active
C)It is the average age of manager in a business
D)It is the number of achievements of management
سؤال
What is organization?

A)Arrangement of persons in business
B)Arrangement of machines on site
C)Arrangement of money for business
D)Arrangement of materials at site
سؤال
What is 4M of construction?

A)4 types of organizations
B)4 resources for construction
C)4 types of construction managers
D)4 types of construction managers.
سؤال
In which type of tender advantage of keen bidding competition can be availed.

A)Open tender or public tender
B)Selected tender
C)Negotiated tender
D)None of the above
سؤال
What SMB stands for?

A)Short measurement book
B)Salient measurement book
C)Standard measurement book
D)None of the above
سؤال
SD, mobilization advance and cost of materials given to contractor will be deducted from

A)RA bill
B)Final bill
C)EMD
D)None of the above
سؤال
What EMD stands for?

A)Exact money deposit
B)Earnest money deposit
C)Exact money deduction
D)Exact monthly deduction
سؤال
Which of the following contract is most suitable for road and bridges?

A)BOT contract
B)Cost plus fixed fee contract
C)All in one contract
D)Labour contract
سؤال
In which of the following contract; contractor tries to complete job quickly?

A)Item rate contract
B)Cost plus fixed fee contract
C)All in one contract
D)Labour contract
سؤال
In which of the following contract; contractor is quickly be agreed and work on job?

A)Cost plus percentage rate contract
B)Lump sum contract
C)Piece work agreement
D)Labour contract
سؤال
In which of the following contract; contractor is not required to deposit SD?

A)Item rate contract
B)Lump sum contract
C)Piece work agreement
D)Labour contract
سؤال
In which of the following contract; contractor is required to offer a fixed sum for job in all respect as per given drawings and details?

A)Item rate contract
B)Lump-sum contract
C)All in one contract
D)Labor contract
سؤال
Extra items will cause headache in item rate contract

A)Right
B)Wrong
C)none
D)all
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/24
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 1: Construction Contracts and Organizations
1
In which of the following stages contract documents are prepared?

A)Planning stage
B)Briefing stage
C)Construction stage
D)None of the above
None of the above
2
In which of the following stages specifications are prepared?

A)Planning stage
B)Briefing stage
C)Construction stage
D)None of the above
Planning stage
3
In which of the following stages practicability of project is ensured?

A)Planning stage
B)Briefing stage
C)Construction stage
D)None of the above
Briefing stage
4
Which of the following is not role of contractor

A)To arrange land
B)To provide resources as per condition of contract
C)To work as per plans and specifications
D)To put RA and final bill and bill for extra item
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
5
Which of the following is not role of owner

A)To arrange fund
B)To arrange land
C)To ensure quality of construction
D)To arrange necessary approvals
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
6
Which of the following organization is widely used in PWD

A)Matrix organization
B)Line or military organization
C)Line and staff organization
D)Functional organization
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
7
Which of the following is/are disadvantage/s of Line and Staff organization?

A)Experts may not have authority to work properly.
B)Conflict between line and staff persons
C)Increase in overhead cost due to high salary of staff
D)All of the Above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
8
In which of the following organization expert advice is available?

A)Matrix organization
B)Line or military organization
C)Line and staff organization
D)Functional organization
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
9
Which organization permits quick decision?

A)Matrix organization
B)Line or military organization
C)Line and staff organization
D)none
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
10
Which of the following is not a characteristics of a Good organization?

A)It must have an organization goal
B)It should have proper structure
C)It should be as big as possible
D)It should include all the activities without repeation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
11
Road is the example of

A)Building constructions.
B)Infrastructure construction.
C)Industrial construction.
D)Special purpose projects
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
12
What is Span of management?

A)It is the number of persons to be supervised by a manager
B)It is the number of years for management to remain active
C)It is the average age of manager in a business
D)It is the number of achievements of management
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
13
What is organization?

A)Arrangement of persons in business
B)Arrangement of machines on site
C)Arrangement of money for business
D)Arrangement of materials at site
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
14
What is 4M of construction?

A)4 types of organizations
B)4 resources for construction
C)4 types of construction managers
D)4 types of construction managers.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
15
In which type of tender advantage of keen bidding competition can be availed.

A)Open tender or public tender
B)Selected tender
C)Negotiated tender
D)None of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
16
What SMB stands for?

A)Short measurement book
B)Salient measurement book
C)Standard measurement book
D)None of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
17
SD, mobilization advance and cost of materials given to contractor will be deducted from

A)RA bill
B)Final bill
C)EMD
D)None of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
18
What EMD stands for?

A)Exact money deposit
B)Earnest money deposit
C)Exact money deduction
D)Exact monthly deduction
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
19
Which of the following contract is most suitable for road and bridges?

A)BOT contract
B)Cost plus fixed fee contract
C)All in one contract
D)Labour contract
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
20
In which of the following contract; contractor tries to complete job quickly?

A)Item rate contract
B)Cost plus fixed fee contract
C)All in one contract
D)Labour contract
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
21
In which of the following contract; contractor is quickly be agreed and work on job?

A)Cost plus percentage rate contract
B)Lump sum contract
C)Piece work agreement
D)Labour contract
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
22
In which of the following contract; contractor is not required to deposit SD?

A)Item rate contract
B)Lump sum contract
C)Piece work agreement
D)Labour contract
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
23
In which of the following contract; contractor is required to offer a fixed sum for job in all respect as per given drawings and details?

A)Item rate contract
B)Lump-sum contract
C)All in one contract
D)Labor contract
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
24
Extra items will cause headache in item rate contract

A)Right
B)Wrong
C)none
D)all
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.