1
Which are the major types of boilers that are operated in world today?
A)natural circulation boiler
B)forced circulation boiler
C)fire tube boiler
D)once through boiler
A)natural circulation boiler
B)forced circulation boiler
C)fire tube boiler
D)once through boiler
once through boiler
2
Cost of nuclear fuel in nuclear power plant economics is considered as ______
A)running cost
B)maintenance cost
C)capital cost
D)development cost
A)running cost
B)maintenance cost
C)capital cost
D)development cost
capital cost
3
In economics of nuclear power plant taxes and insurance charges are taken as
A)operating cost
B)maintenance cost
C)capital cost
D)fixed cost
A)operating cost
B)maintenance cost
C)capital cost
D)fixed cost
fixed cost
4
The land area required for installation of nuclear power plant is
A)more than thermal power plant
B)less than thermal power plant
C)equel to thermal power plant
D)depends on type of construction
A)more than thermal power plant
B)less than thermal power plant
C)equel to thermal power plant
D)depends on type of construction
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
5
5 FUEL AND ASH HANDLING
A)coal ash produced destroys the machinery by entering into them
B)coal ash produced annually accounts for thousands of tones
C)coal ash can be reutilized for some other purpose
D)coal ash affects the health of people working at plants
A)coal ash produced destroys the machinery by entering into them
B)coal ash produced annually accounts for thousands of tones
C)coal ash can be reutilized for some other purpose
D)coal ash affects the health of people working at plants
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
6
Which system consumes less power out of all ash handling systems?
A)mechanical ash handling system
B)pneumatic ash handling system
C)hydraulic ash handling system
D)steam jet ash handling system
A)mechanical ash handling system
B)pneumatic ash handling system
C)hydraulic ash handling system
D)steam jet ash handling system
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
7
Natural draught produced by a chimney depends upon ______
A)density of chimney gases
B)height of chimney
C)both 'density of chimney gases' and 'height of chimney'
D)none of the mentioned
A)density of chimney gases
B)height of chimney
C)both 'density of chimney gases' and 'height of chimney'
D)none of the mentioned
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
8
In a furnace employing forced draught compared to induced draught ______
A)the fan operates hot and hence blades are liable to corrosion and erosion
B)positive pressure exists in the furnace
C)air is sucked in, so air leaks are more and hence furnace efficiency is reduced
D)none of the mentioned
A)the fan operates hot and hence blades are liable to corrosion and erosion
B)positive pressure exists in the furnace
C)air is sucked in, so air leaks are more and hence furnace efficiency is reduced
D)none of the mentioned
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
9
Which of the following is not a reason of heating feed water?
A)it improves overall efficiency
B)it removes dissolved impurities
C)it prevents from thermal stress which may cause due to enter of cold water into boiler
D)it produces steam from feed water
A)it improves overall efficiency
B)it removes dissolved impurities
C)it prevents from thermal stress which may cause due to enter of cold water into boiler
D)it produces steam from feed water
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
10
Mechanical method of water treatment is done to ______
A)heat the feed water
B)to remove solid matter and impurities
C)to add some solid materials
D)to remove dissolved gases
A)heat the feed water
B)to remove solid matter and impurities
C)to add some solid materials
D)to remove dissolved gases
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
11
Heat treatment arrangement used to separate or remove deserved gases and impurities from feed water is called the year later.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
12
Having two separate units for process heat and power is?
A)useful
B)useless
C)pollution reducing
D)none of the mentioned
A)useful
B)useless
C)pollution reducing
D)none of the mentioned
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
13
In a back pressure turbine ______
A)pressure at the exhaust from the turbine is the saturation pressure corresponding to the temperature desired in the process
B)pressure at the entrance of the turbine is the saturation pressure corresponding to the temperature desired in the process
C)pressure at the exhaust from the turbine is the saturation pressure corresponding to the pressure desired in the process
D)none of the mentioned
A)pressure at the exhaust from the turbine is the saturation pressure corresponding to the temperature desired in the process
B)pressure at the entrance of the turbine is the saturation pressure corresponding to the temperature desired in the process
C)pressure at the exhaust from the turbine is the saturation pressure corresponding to the pressure desired in the process
D)none of the mentioned
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
14
The cogeneration plant efficiency nCOif WT, Qi, QH represents turbine work, heat input, heat output respectively is given by?
A)nCO= (WT + Qi) / QH.
B)nCO= (WT - Qi) / QH
C)nCO= (WT + QH) / Qi
D)nCO= (WT + QH) / Qi.
A)nCO= (WT + Qi) / QH.
B)nCO= (WT - Qi) / QH
C)nCO= (WT + QH) / Qi
D)nCO= (WT + QH) / Qi.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
15
Pass-out turbines are used in which of these cases?
A)relatively high back pressure
B)small heating requirement
C)only relatively low back pressure
D)both relatively high back pressure and small heating requirement
A)relatively high back pressure
B)small heating requirement
C)only relatively low back pressure
D)both relatively high back pressure and small heating requirement
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
16
Which of these is a working fluid in the topping plant of a Brayton-Rankine combined plant?
A)hydrogen
B)helium
C)nitrogen
D)all of the mentioned
A)hydrogen
B)helium
C)nitrogen
D)all of the mentioned
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
17
To improve the efficiency of the gas turbines, which among these are used?
A)regenerator
B)inter cooling
C)reheating
D)all of the mentioned
A)regenerator
B)inter cooling
C)reheating
D)all of the mentioned
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
18
Which material is used for the manufacture of the turbine blades?
A)stainless steel
B)carbon steel
C)high nickel alloy
D)high alloy steel
A)stainless steel
B)carbon steel
C)high nickel alloy
D)high alloy steel
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
19
Which of the following is a type of Gas Turbine Plant?
A)single acting
B)double acting
C)open
D)none of the mentioned
A)single acting
B)double acting
C)open
D)none of the mentioned
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
20
Which among these is the main component of a gas turbine plant?
A)condenser
B)compressor
C)boiler
D)both compressor & boiler
A)condenser
B)compressor
C)boiler
D)both compressor & boiler
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
21
The maximum steam temperature in a power cycle in degree centigrade is?
A)600
B)500
C)300
D)100
A)600
B)500
C)300
D)100
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
22
By superposing a high temperature power plant as a topping unit to the steam plant, the energy conversion efficiency achieved is?
A)higher
B)lower
C)maximum
D)minimum
A)higher
B)lower
C)maximum
D)minimum
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
23
Which of these is not a merit of nuclear power?
A)amount of fuel required is small
B)plant requires a huge amount of area
C)demand for coal and oil is reduced
D)most economical in large quantities
A)amount of fuel required is small
B)plant requires a huge amount of area
C)demand for coal and oil is reduced
D)most economical in large quantities
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
24
In an electron beam, the average kinetic energy of an electron is given by ______
A)2kt
B)3kt
C)1.5kt
D)2.5kt
A)2kt
B)3kt
C)1.5kt
D)2.5kt