Deck 2: Seismic Design and Fabrication Techniques for Difficult Transportation

ملء الشاشة (f)
exit full mode
سؤال
In places where transportation of large members is difficult what kind of fabrication is preferred?

A)plant prefabrication
B)site fabrication
C)standardisation
D)prefabricate systems
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Transportation of precast members accounts for about

A)20-25%ofthecostof production and assembling
B)10-15% of the cost of production and assembling
C)10-20% of the cost of production and assembling
D)5-15% of the cost of production and assembling
سؤال
Plant fabrication is suited better for

A)large number of small prefabricates
B)large e long panel members
C)standard is members
D)limited production
سؤال
................... is the factor used to obtain the design seismic force depending on the functional use of the structure, characterized by hazardous consequences of its failure, its post-earthquake functional need, historic value, or economic importance.

A)importance factor
B)response reduction factor
C)all of the above
D)none of the above
سؤال
The elastic rebound theory is an explanationfor how ... is spread duringearthquakes

A)load
B)stress
C)energy
D)intensity of load
سؤال
Damping is the energy dissipation properties of a material or system under stress.

A)dynamic stress
B)static stress
C)non cyclic stress
D)cyclic stress
سؤال
Choose the correct answer.

A)converting static load into dynamic load is known as equivalent design loads.
B)converting dynamic load into static load is known as equivalent design loads.
C)both a &b
D)none of the above
سؤال
Which of the following defines Magnitude?

A)the severity of earthquake shaking is assessed using a descriptive scale
B)quantitative measure of the size of the earthquake at its source
C)both a &b
D)none of the above
سؤال
How many methods are generally used to avoid the disproportionate collapse in a building?

A)one
B)two
C)three
D)zero
سؤال
Choose the correct answer in terms of special requirements for building in High Seismic Zones

A)the height of the building shall generally restricted to 5 stores in zone iv
B)the height of the building shall generally restricted to 7 stores in zone iv
C)the height of the building shall generally restricted to 8 stores in zone iv
D)the height of the building shall generally restricted to 10 stores in zone iv
سؤال
Choose the correct answer in terms of special requirements for building in High Seismic Zones

A)the height of the building shall generally restricted to 5 stores in zone v
B)the height of the building shall generally restricted to 6 stores in zone v
C)the height of the building shall generally restricted to 7 stores in zone v
D)the height of the building shall generally restricted to 8 stores in zone v
سؤال
In a Prefabricated R C floors in a cyclone prone zone the Structural deck concrete of grade not leaner than .............. should be provided over pre-cast components to act monolithic with them.

A)m10
B)m15
C)m20
D)m25
سؤال
Which of the following does not comes under the types of progressive collapse

A)domino-type collapse
B)section type collapse
C)stability type collapse
D)mixed-type collapse
سؤال
Depending on the degree of workability and placing condition determine the                        

A)slump value
B)the maximum size of aggregate
C)the amount of mixing water
D)the minimum water-cement ratio
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/14
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 2: Seismic Design and Fabrication Techniques for Difficult Transportation
1
In places where transportation of large members is difficult what kind of fabrication is preferred?

A)plant prefabrication
B)site fabrication
C)standardisation
D)prefabricate systems
site fabrication
2
Transportation of precast members accounts for about

A)20-25%ofthecostof production and assembling
B)10-15% of the cost of production and assembling
C)10-20% of the cost of production and assembling
D)5-15% of the cost of production and assembling
10-15% of the cost of production and assembling
3
Plant fabrication is suited better for

A)large number of small prefabricates
B)large e long panel members
C)standard is members
D)limited production
large number of small prefabricates
4
................... is the factor used to obtain the design seismic force depending on the functional use of the structure, characterized by hazardous consequences of its failure, its post-earthquake functional need, historic value, or economic importance.

A)importance factor
B)response reduction factor
C)all of the above
D)none of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 14 في هذه المجموعة.
فتح الحزمة
k this deck
5
The elastic rebound theory is an explanationfor how ... is spread duringearthquakes

A)load
B)stress
C)energy
D)intensity of load
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 14 في هذه المجموعة.
فتح الحزمة
k this deck
6
Damping is the energy dissipation properties of a material or system under stress.

A)dynamic stress
B)static stress
C)non cyclic stress
D)cyclic stress
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 14 في هذه المجموعة.
فتح الحزمة
k this deck
7
Choose the correct answer.

A)converting static load into dynamic load is known as equivalent design loads.
B)converting dynamic load into static load is known as equivalent design loads.
C)both a &b
D)none of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 14 في هذه المجموعة.
فتح الحزمة
k this deck
8
Which of the following defines Magnitude?

A)the severity of earthquake shaking is assessed using a descriptive scale
B)quantitative measure of the size of the earthquake at its source
C)both a &b
D)none of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 14 في هذه المجموعة.
فتح الحزمة
k this deck
9
How many methods are generally used to avoid the disproportionate collapse in a building?

A)one
B)two
C)three
D)zero
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 14 في هذه المجموعة.
فتح الحزمة
k this deck
10
Choose the correct answer in terms of special requirements for building in High Seismic Zones

A)the height of the building shall generally restricted to 5 stores in zone iv
B)the height of the building shall generally restricted to 7 stores in zone iv
C)the height of the building shall generally restricted to 8 stores in zone iv
D)the height of the building shall generally restricted to 10 stores in zone iv
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 14 في هذه المجموعة.
فتح الحزمة
k this deck
11
Choose the correct answer in terms of special requirements for building in High Seismic Zones

A)the height of the building shall generally restricted to 5 stores in zone v
B)the height of the building shall generally restricted to 6 stores in zone v
C)the height of the building shall generally restricted to 7 stores in zone v
D)the height of the building shall generally restricted to 8 stores in zone v
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 14 في هذه المجموعة.
فتح الحزمة
k this deck
12
In a Prefabricated R C floors in a cyclone prone zone the Structural deck concrete of grade not leaner than .............. should be provided over pre-cast components to act monolithic with them.

A)m10
B)m15
C)m20
D)m25
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 14 في هذه المجموعة.
فتح الحزمة
k this deck
13
Which of the following does not comes under the types of progressive collapse

A)domino-type collapse
B)section type collapse
C)stability type collapse
D)mixed-type collapse
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 14 في هذه المجموعة.
فتح الحزمة
k this deck
14
Depending on the degree of workability and placing condition determine the                        

A)slump value
B)the maximum size of aggregate
C)the amount of mixing water
D)the minimum water-cement ratio
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 14 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 14 في هذه المجموعة.