Deck 1: Risk Management

ملء الشاشة (f)
exit full mode
سؤال
Which of the following are ways of transferring risk?

A)Insurance
B)Warranty
C)Outsourcing
D)Eliminating the threat
E)Reducing the impact
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
The project planning process involves a lot of redundancy, checking and reviewing of plan details; however, to be most effective you shouldn't publish your proposed project plan until after this important step:

A)Risk assessment
B)Segmenting of the WBS into smaller, workable pieces
C)Receipt of resource commitments
D)Creation of a budget
E)None of the above
سؤال
A contingency reserve should be a specific percentage of each budget:
سؤال
Jack is concerned about slack. His project at the corporate offices of Taco Shack is catching flack, because it might be off track, and impact his delivery date. Given that, which type of slack best represents the above?

A)Near critical path float
B)Total float
C)Project float
D)Free float
سؤال
Which component of the "Triple Constraint" concept is part of the newer, expanded definition of this term according to the PMI?

A)Cost
B)Time
C)Risk
D)Scope
E)Stakeholders
سؤال
Once the Project Manager completes the schedule network analysis, the risk that is identified must be cared for within the project schedule. What type of formats are permissible ways to show logical relationships?

A)Network Diagram
B)Project Scope Statement
C)Progress Reports
D)Critical Path Baseline
E)PERT
سؤال
Ted is negotiating a 10 year contract with the US government to provide educational services. The government wants a fixed price project. However, Ted is extremely concerned about the possibility of inflation given the increase in government spending. Ted should suggest what type of contract?

A)Fixed price with incentive fee
B)Cost plus fixed fee
C)Cost plus incentive fee
D)Time and material
E)Fixed price with economic price adjustment
سؤال
What is a potential downside to a Fixed Price contract with a vendor if you are buying services? Select all that apply.

A)The vendor might cut corners on the quality of materials.
B)The vendor will not control material costs.
C)he vendor does not have any incentives to finish the project on time.
D)The vendor may price in a margin of safety.
E)None of the above.
سؤال
Jerry has been asked to be very diligent about risk management since his new company has experienced rather involved complications before. Which best exemplifies good risk management?

A)analyzing, planning and monitoring risks
B)increasing the possibility of good results
C)decreasing the possibility of bad results
D)installing Risk-Buddy, a software solution, to handle all of your risk management needs
E)mitigating major risks
سؤال
Projects that involve two-sided communication tend to advance with fewer issues and risks. Which answer best exemplifies two-sided communication for Project Janus?

A)Reporting out on a Project Janus via e-mail
B)Delivering a hard copy status update on Project Janus personally to each project member's desk
C)Offering help to a team member who is having trouble completing a particular task
D)Asking to be included on meetings outside the scope of the project
E)All of the above
سؤال
For which of the following can you have a baseline?

A)Scope
B)Schedule
C)Cost
D)Quality
E)Technical
سؤال
Hector the Projector is in the quantitative risk assessment portion of the process. Which is a productive example of this phase of the process?

A)Identifying all 10,000 project risks
B)Estimating possible costs of unforeseeable circumstances
C)Determining the probability that the project will meet its goals successfully
D)Ball-parking costs for each project task
سؤال
Lena is in the midst of assessing risk on her process re-engineering project. Which might she use to perform a qualitative assessment of identified risks in her project?

A)Partial historical data
B)Spotty data
C)Second-hand information
D)First-hand interviews
E)Magic 8 Ball
سؤال
The managers at Static Inc. have been carrying out business the same way for the last ten years. However, they've taken on a new customer who wants to see newer technology being employed. Static Inc. management is constantly challenging the newly hired, experienced project manager who is trying to deploy the new system as best he can. What is the biggest risk to this project, based on the above?

A)The technology
B)Skills of the project manager
C)The managers' resistance to change
D)The schedule
E)Scope management
سؤال
For risk management to be as cost and time effective an exercise as possible, when should the risk identification process begin?

A)When the actual execution of the project begins
B)During a project change
C)After a scope statement and WBS have been formulated
D)At the very beginning of the project
E)Before the start of the project
سؤال
What should a risk register include?

A)List of risks
B)List of responses to risks
C)Categories of risk
D)Impact assessment/estimate
E)All of the above
سؤال
Julie has decided to gather opinions from a group of external consultants, via a short questionnaire, who are experienced with these types of projects within the publishing industry. She'll then show them an aggregated list of the whole group's answers, and ask them if they want to change theirs.What best describes the technique Julie is utilizing to gather valuable information for her project?

A)Root cause analysis
B)Interviewing
C)Delphi technique
D)Brainstorming
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/17
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 1: Risk Management
1
Which of the following are ways of transferring risk?

A)Insurance
B)Warranty
C)Outsourcing
D)Eliminating the threat
E)Reducing the impact
Insurance
Warranty
Outsourcing
2
The project planning process involves a lot of redundancy, checking and reviewing of plan details; however, to be most effective you shouldn't publish your proposed project plan until after this important step:

A)Risk assessment
B)Segmenting of the WBS into smaller, workable pieces
C)Receipt of resource commitments
D)Creation of a budget
E)None of the above
Risk assessment
3
A contingency reserve should be a specific percentage of each budget:
False
4
Jack is concerned about slack. His project at the corporate offices of Taco Shack is catching flack, because it might be off track, and impact his delivery date. Given that, which type of slack best represents the above?

A)Near critical path float
B)Total float
C)Project float
D)Free float
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 17 في هذه المجموعة.
فتح الحزمة
k this deck
5
Which component of the "Triple Constraint" concept is part of the newer, expanded definition of this term according to the PMI?

A)Cost
B)Time
C)Risk
D)Scope
E)Stakeholders
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 17 في هذه المجموعة.
فتح الحزمة
k this deck
6
Once the Project Manager completes the schedule network analysis, the risk that is identified must be cared for within the project schedule. What type of formats are permissible ways to show logical relationships?

A)Network Diagram
B)Project Scope Statement
C)Progress Reports
D)Critical Path Baseline
E)PERT
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 17 في هذه المجموعة.
فتح الحزمة
k this deck
7
Ted is negotiating a 10 year contract with the US government to provide educational services. The government wants a fixed price project. However, Ted is extremely concerned about the possibility of inflation given the increase in government spending. Ted should suggest what type of contract?

A)Fixed price with incentive fee
B)Cost plus fixed fee
C)Cost plus incentive fee
D)Time and material
E)Fixed price with economic price adjustment
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 17 في هذه المجموعة.
فتح الحزمة
k this deck
8
What is a potential downside to a Fixed Price contract with a vendor if you are buying services? Select all that apply.

A)The vendor might cut corners on the quality of materials.
B)The vendor will not control material costs.
C)he vendor does not have any incentives to finish the project on time.
D)The vendor may price in a margin of safety.
E)None of the above.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 17 في هذه المجموعة.
فتح الحزمة
k this deck
9
Jerry has been asked to be very diligent about risk management since his new company has experienced rather involved complications before. Which best exemplifies good risk management?

A)analyzing, planning and monitoring risks
B)increasing the possibility of good results
C)decreasing the possibility of bad results
D)installing Risk-Buddy, a software solution, to handle all of your risk management needs
E)mitigating major risks
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 17 في هذه المجموعة.
فتح الحزمة
k this deck
10
Projects that involve two-sided communication tend to advance with fewer issues and risks. Which answer best exemplifies two-sided communication for Project Janus?

A)Reporting out on a Project Janus via e-mail
B)Delivering a hard copy status update on Project Janus personally to each project member's desk
C)Offering help to a team member who is having trouble completing a particular task
D)Asking to be included on meetings outside the scope of the project
E)All of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 17 في هذه المجموعة.
فتح الحزمة
k this deck
11
For which of the following can you have a baseline?

A)Scope
B)Schedule
C)Cost
D)Quality
E)Technical
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 17 في هذه المجموعة.
فتح الحزمة
k this deck
12
Hector the Projector is in the quantitative risk assessment portion of the process. Which is a productive example of this phase of the process?

A)Identifying all 10,000 project risks
B)Estimating possible costs of unforeseeable circumstances
C)Determining the probability that the project will meet its goals successfully
D)Ball-parking costs for each project task
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 17 في هذه المجموعة.
فتح الحزمة
k this deck
13
Lena is in the midst of assessing risk on her process re-engineering project. Which might she use to perform a qualitative assessment of identified risks in her project?

A)Partial historical data
B)Spotty data
C)Second-hand information
D)First-hand interviews
E)Magic 8 Ball
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 17 في هذه المجموعة.
فتح الحزمة
k this deck
14
The managers at Static Inc. have been carrying out business the same way for the last ten years. However, they've taken on a new customer who wants to see newer technology being employed. Static Inc. management is constantly challenging the newly hired, experienced project manager who is trying to deploy the new system as best he can. What is the biggest risk to this project, based on the above?

A)The technology
B)Skills of the project manager
C)The managers' resistance to change
D)The schedule
E)Scope management
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 17 في هذه المجموعة.
فتح الحزمة
k this deck
15
For risk management to be as cost and time effective an exercise as possible, when should the risk identification process begin?

A)When the actual execution of the project begins
B)During a project change
C)After a scope statement and WBS have been formulated
D)At the very beginning of the project
E)Before the start of the project
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 17 في هذه المجموعة.
فتح الحزمة
k this deck
16
What should a risk register include?

A)List of risks
B)List of responses to risks
C)Categories of risk
D)Impact assessment/estimate
E)All of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 17 في هذه المجموعة.
فتح الحزمة
k this deck
17
Julie has decided to gather opinions from a group of external consultants, via a short questionnaire, who are experienced with these types of projects within the publishing industry. She'll then show them an aggregated list of the whole group's answers, and ask them if they want to change theirs.What best describes the technique Julie is utilizing to gather valuable information for her project?

A)Root cause analysis
B)Interviewing
C)Delphi technique
D)Brainstorming
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 17 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 17 في هذه المجموعة.