From which of the following conditions do structural forces originate?
1. Point loads
2. Uniform loads
3. Compression
4. Non-uniformly distributed loads
5. Tension
6. Moments

A)1, 2
B)1, 3, 4
C)2, 4 ,5, 6
D)1, 2, 4, 6
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
What is the degree of saturation of a 600 cm3 soil sample given the following values from its three-phase diagram? Volume of air: 100 cm3; volume of solids: 320 cm3.

A)30%
B)64.3%
C)87.5%
D)Not enough information provided
سؤال
Which of the following hammers is not commonly used for conducting Standard Penetration Tests (SPTs)?

A)Split-spoon
B)Automatic
C)Donut
D)Safety
سؤال
Which of the following elements are typically included on the Erosion and Sediment Control Plan of a construction site?

A)Site drawing with existing and proposed conditions
B)Standard details of each erosion and sediment control best management plan (BMP) proposed for use
C)BMP inspection and maintenance schedule
D)All of the above.
سؤال
What is the velocity (in ft/sec) in a rectangular concrete channel with a width of 3 feet (ft), a hydraulic grade line slope of 0.002 ft/ft, a flow depth of 1.5 ft and an assumed Manning's coefficient n = 0.014?

A)0.15 ft/sec
B)1.50 ft/sec
C)3.92 ft/sec
D)None of the above
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/5
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 1: Civil Engineering
1
From which of the following conditions do structural forces originate?
1. Point loads
2. Uniform loads
3. Compression
4. Non-uniformly distributed loads
5. Tension
6. Moments

A)1, 2
B)1, 3, 4
C)2, 4 ,5, 6
D)1, 2, 4, 6
1, 2, 4, 6
2
What is the degree of saturation of a 600 cm3 soil sample given the following values from its three-phase diagram? Volume of air: 100 cm3; volume of solids: 320 cm3.

A)30%
B)64.3%
C)87.5%
D)Not enough information provided
64.3%
3
Which of the following hammers is not commonly used for conducting Standard Penetration Tests (SPTs)?

A)Split-spoon
B)Automatic
C)Donut
D)Safety
Split-spoon
4
Which of the following elements are typically included on the Erosion and Sediment Control Plan of a construction site?

A)Site drawing with existing and proposed conditions
B)Standard details of each erosion and sediment control best management plan (BMP) proposed for use
C)BMP inspection and maintenance schedule
D)All of the above.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 5 في هذه المجموعة.
فتح الحزمة
k this deck
5
What is the velocity (in ft/sec) in a rectangular concrete channel with a width of 3 feet (ft), a hydraulic grade line slope of 0.002 ft/ft, a flow depth of 1.5 ft and an assumed Manning's coefficient n = 0.014?

A)0.15 ft/sec
B)1.50 ft/sec
C)3.92 ft/sec
D)None of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 5 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 5 في هذه المجموعة.