_____________is required for preliminary studies of various aspects of a work or project.

A)supplementary estimate
B)plinth area estimate
C)revised estimate
D)abstract estimate
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Per kilometre basis depending on the nature of road, for 10 km of a state highway approx. cost @ Rs. 50000/- per 1 km works out as Rs. 5 lakh.
سؤال
Approx. cost of a bridge of 3 spans of 50 m each span @Rs.30000/- per running m of span comes to 3*50*30000 = Rs. 45 lakhs.
سؤال
Approximate cost of sewerage project for a population of one Rs. 10/- head works out as Rs. 10 lakh.
سؤال
_____________is prepared on the basis of plinth area of building, the rate being deducted from the cost of similar building having similar specification, heights and construction, in the locality.

A)cube rate estimate
B)supplementary estimate
C)maintenance estimate
D)plinth area estimate
سؤال
_____________            is the amount provided in the estimate and bill of quantities for some specialised work to be done by a specialised firm; whose details are not known at the time of preparing estimate.

A)prime cost
B)provisional sum
C)capital cost
D)building cost index
سؤال
___________estimate is a detailed estimate and is prepared to maintain the structure or work in proper order and safe condition.

A)supplementary and revised estimate
B)maintenance estimate
C)item rate estimate
D)revised estimate
سؤال
A large work or project may consists of several building or small works and each of these work is known as _____________  

A)sub-work
B)sub-project
C)sub-head
D)sub-construction
سؤال
The term _____________is used to denote a procedure of costing or valuing an item of work on the basis of actual labourers and materials required.

A)prime cost
B)hour-work
C)day-work
D)sub-work
سؤال
The surface of the highway pavement should be designed to allow _____________

A)high rolling resistance
B)low rolling resistance
C)no rolling resistance
D)very high rolling resistance
سؤال
The soil becomes weak in _____________

A)summer
B)winter
C)rainy season
D)spring season
سؤال
Which of the following pavement has greater life?

A)bituminous pavements
B)cement concrete pavements
C)gravel roads
D)earth roads
سؤال
Which of the following requirement is given most importance in highway design?

A)structural
B)functional
C)seasonal
D)maintenance
سؤال
The surface of the pavement should be

A)smooth
B)rough
C)sufficient enough to resist skid
D)very rough
سؤال
The drainage layer is _____________

A)surface course
B)sub base
C)base
D)sub grade
سؤال
The maximum stress sustained by concrete pavements in kg/cm2 is _____________

A)40
B)45
C)50
D)55
سؤال
The ICPB type of pavement uses

A)concrete paver blocks
B)fly ash
C)ggbs
D)rmc
سؤال
The ICPB may be used in _____________

A)water logged areas
B)parks
C)footpaths
D)highways
سؤال
The maximum length of vehicle that can be used on Indian roads is _____________

A)11
B)12
C)13
D)14
سؤال
The design period of cement concrete road is taken as _____________

A)20
B)25
C)30
D)35
سؤال
In India the flexible pavement is designed as per _____________

A)msa
B)ksa
C)csa
D)fsa
سؤال
Which of the following materials is not used in the construction of a septic tank?

A)concrete
B)rubber
C)fibreglass
D)plastic
سؤال
Septic tank is a small scale treatment unit.
سؤال
The shape of the tank is circular.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/24
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 1: Construction and Costing Projects
1
_____________is required for preliminary studies of various aspects of a work or project.

A)supplementary estimate
B)plinth area estimate
C)revised estimate
D)abstract estimate
abstract estimate
2
Per kilometre basis depending on the nature of road, for 10 km of a state highway approx. cost @ Rs. 50000/- per 1 km works out as Rs. 5 lakh.
False
3
Approx. cost of a bridge of 3 spans of 50 m each span @Rs.30000/- per running m of span comes to 3*50*30000 = Rs. 45 lakhs.
True
4
Approximate cost of sewerage project for a population of one Rs. 10/- head works out as Rs. 10 lakh.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
5
_____________is prepared on the basis of plinth area of building, the rate being deducted from the cost of similar building having similar specification, heights and construction, in the locality.

A)cube rate estimate
B)supplementary estimate
C)maintenance estimate
D)plinth area estimate
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
6
_____________            is the amount provided in the estimate and bill of quantities for some specialised work to be done by a specialised firm; whose details are not known at the time of preparing estimate.

A)prime cost
B)provisional sum
C)capital cost
D)building cost index
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
7
___________estimate is a detailed estimate and is prepared to maintain the structure or work in proper order and safe condition.

A)supplementary and revised estimate
B)maintenance estimate
C)item rate estimate
D)revised estimate
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
8
A large work or project may consists of several building or small works and each of these work is known as _____________  

A)sub-work
B)sub-project
C)sub-head
D)sub-construction
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
9
The term _____________is used to denote a procedure of costing or valuing an item of work on the basis of actual labourers and materials required.

A)prime cost
B)hour-work
C)day-work
D)sub-work
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
10
The surface of the highway pavement should be designed to allow _____________

A)high rolling resistance
B)low rolling resistance
C)no rolling resistance
D)very high rolling resistance
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
11
The soil becomes weak in _____________

A)summer
B)winter
C)rainy season
D)spring season
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
12
Which of the following pavement has greater life?

A)bituminous pavements
B)cement concrete pavements
C)gravel roads
D)earth roads
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
13
Which of the following requirement is given most importance in highway design?

A)structural
B)functional
C)seasonal
D)maintenance
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
14
The surface of the pavement should be

A)smooth
B)rough
C)sufficient enough to resist skid
D)very rough
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
15
The drainage layer is _____________

A)surface course
B)sub base
C)base
D)sub grade
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
16
The maximum stress sustained by concrete pavements in kg/cm2 is _____________

A)40
B)45
C)50
D)55
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
17
The ICPB type of pavement uses

A)concrete paver blocks
B)fly ash
C)ggbs
D)rmc
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
18
The ICPB may be used in _____________

A)water logged areas
B)parks
C)footpaths
D)highways
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
19
The maximum length of vehicle that can be used on Indian roads is _____________

A)11
B)12
C)13
D)14
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
20
The design period of cement concrete road is taken as _____________

A)20
B)25
C)30
D)35
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
21
In India the flexible pavement is designed as per _____________

A)msa
B)ksa
C)csa
D)fsa
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
22
Which of the following materials is not used in the construction of a septic tank?

A)concrete
B)rubber
C)fibreglass
D)plastic
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
23
Septic tank is a small scale treatment unit.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
24
The shape of the tank is circular.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.