Deck 2: Septic Tanks, Soil Plasticity, and Structures for Water Flow

ملء الشاشة (f)
exit full mode
سؤال
The heavy particles in the tank            

A)float
B)sink into the bottom
C)separated using magnetic methods
D)flow along liquid
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
The scum formed in the tank            

A)flows
B)gets dissolved
C)sink into the bottom
D)floats on top
سؤال
Which of the following methods are not used for the dispersion of the effluent out of a septic tank?

A)wetlands
B)soak pit
C)evapo-transpiration mound
D)leach field
سؤال
During the disposal of the sludge, it must be___________

A)liquefied
B)dried
C)burned
D)fluidized
سؤال
The first chamber in a septic tank should be at least___________of the total length.

A)10 %
B)20 %
C)35 %
D)50 %
سؤال
Which of the following reasons is correct with respect to the need of providing baffle walls?

A)mixing of scum and wastewater
B)settling of heavy particles
C)increase velocity of the liquid
D)prevent scum and solids from escaping
سؤال
What are the product gases of anaerobic digestion?

A)carbon-dioxide and methane
B)methane and oxygen
C)oxygen and carbon-dioxide
D)nitrogen and methane
سؤال
What is the mixture of methane and carbon-dioxide of anaerobic digestion called?

A)waste gases
B)poisonous gas
C)biogas
D)carbo-methane
سؤال
The term "septic" refers to _____________    

A)anaerobic bacterial environment that develops in the tank
B)refers to safety and precaution
C)drainage of waste materials
D)aerobic bacterial environment that develops in the tank
سؤال
Septic tank is usually consists of brick wall in cement not less than___________  

A)20 cm
B)100 cm
C)80 cm
D)200 cm
سؤال
A_____________is a type of toilet that collects human faeces in a hole in the ground.

A)gutter
B)septic tank
C)pit toilet
D)latrine
سؤال
The size of the faeces drop hole in the floor or slab should not be larger than

A)5m
B)25 cm
C)45 cm
D)250 mm
سؤال
As of 2013 pit latrines are used by an estimated _____________    people.

A)1.77 billion
B)2.77 million
C)1.77 billion.
D)4.66 billion
سؤال
As a very general guideline it is recommended that the bottom of the pit should be at least___________  above groundwater level.

A)0.5 m
B)2 m
C)12 m
D)20 m
سؤال
A ____________houses the squatting pan or toilet seat and provides privacy and protection from the weather for the user.

A)roof
B)terrace
C)shade
D)shelter
سؤال
The theory of plasticity pertaining to soils is based on _____________  

A)mohr's theory
B)rankine's method
C)mohr-coulomb theory
D)none of the mentioned
سؤال
On designing retaining walls it is necessary to take care of _____________exerted by soil mass.

A)erosion
B)lateral pressure
C)surcharge
D)lateral stress
سؤال
The material retained or supported by the retaining structure is called _____________

A)surcharge
B)support wall
C)back fill
D)all of the mentioned
سؤال
The coefficient of earth pressure when the soil is at equilibrium is _____________  

A)?v /?h
B)?h /?v
C)?v × ?h
D)?1 / ?3
سؤال
The computation of stress in plastic equilibrium is based on _____________

A)theory of plasticity
B)mohr's theory of rupture
C)rankine's theory
D)all of the mentioned
سؤال
The wedge-shaped portion of the backfill tending to move with the wall is called

A)wedge fall
B)active fall
C)failure wedge
D)none of the mentioned
سؤال
In active stress, the major principal stress ?1 acting on the wall will be in _____________ plane.

A)vertical
B)horizontal
C)inclined
D)zero
سؤال
The plastic state of stress was proposed by

A)mohr
B)rankine
C)coulomb
D)darcy
سؤال
The position of the backfill lying above the horizontal plane at the top of wall is called

A)active state
B)plasticity
C)surcharge
D)slip lines
سؤال
A structure that allows water to flow under a road, railroad, trail, or similar obstruction from one side to the other side is called as

A)drainage
B)bridges
C)tunnel
D)culverts
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/25
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 2: Septic Tanks, Soil Plasticity, and Structures for Water Flow
1
The heavy particles in the tank            

A)float
B)sink into the bottom
C)separated using magnetic methods
D)flow along liquid
sink into the bottom
2
The scum formed in the tank            

A)flows
B)gets dissolved
C)sink into the bottom
D)floats on top
floats on top
3
Which of the following methods are not used for the dispersion of the effluent out of a septic tank?

A)wetlands
B)soak pit
C)evapo-transpiration mound
D)leach field
wetlands
4
During the disposal of the sludge, it must be___________

A)liquefied
B)dried
C)burned
D)fluidized
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
5
The first chamber in a septic tank should be at least___________of the total length.

A)10 %
B)20 %
C)35 %
D)50 %
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
6
Which of the following reasons is correct with respect to the need of providing baffle walls?

A)mixing of scum and wastewater
B)settling of heavy particles
C)increase velocity of the liquid
D)prevent scum and solids from escaping
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
7
What are the product gases of anaerobic digestion?

A)carbon-dioxide and methane
B)methane and oxygen
C)oxygen and carbon-dioxide
D)nitrogen and methane
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
8
What is the mixture of methane and carbon-dioxide of anaerobic digestion called?

A)waste gases
B)poisonous gas
C)biogas
D)carbo-methane
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
9
The term "septic" refers to _____________    

A)anaerobic bacterial environment that develops in the tank
B)refers to safety and precaution
C)drainage of waste materials
D)aerobic bacterial environment that develops in the tank
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
10
Septic tank is usually consists of brick wall in cement not less than___________  

A)20 cm
B)100 cm
C)80 cm
D)200 cm
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
11
A_____________is a type of toilet that collects human faeces in a hole in the ground.

A)gutter
B)septic tank
C)pit toilet
D)latrine
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
12
The size of the faeces drop hole in the floor or slab should not be larger than

A)5m
B)25 cm
C)45 cm
D)250 mm
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
13
As of 2013 pit latrines are used by an estimated _____________    people.

A)1.77 billion
B)2.77 million
C)1.77 billion.
D)4.66 billion
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
14
As a very general guideline it is recommended that the bottom of the pit should be at least___________  above groundwater level.

A)0.5 m
B)2 m
C)12 m
D)20 m
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
15
A ____________houses the squatting pan or toilet seat and provides privacy and protection from the weather for the user.

A)roof
B)terrace
C)shade
D)shelter
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
16
The theory of plasticity pertaining to soils is based on _____________  

A)mohr's theory
B)rankine's method
C)mohr-coulomb theory
D)none of the mentioned
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
17
On designing retaining walls it is necessary to take care of _____________exerted by soil mass.

A)erosion
B)lateral pressure
C)surcharge
D)lateral stress
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
18
The material retained or supported by the retaining structure is called _____________

A)surcharge
B)support wall
C)back fill
D)all of the mentioned
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
19
The coefficient of earth pressure when the soil is at equilibrium is _____________  

A)?v /?h
B)?h /?v
C)?v × ?h
D)?1 / ?3
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
20
The computation of stress in plastic equilibrium is based on _____________

A)theory of plasticity
B)mohr's theory of rupture
C)rankine's theory
D)all of the mentioned
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
21
The wedge-shaped portion of the backfill tending to move with the wall is called

A)wedge fall
B)active fall
C)failure wedge
D)none of the mentioned
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
22
In active stress, the major principal stress ?1 acting on the wall will be in _____________ plane.

A)vertical
B)horizontal
C)inclined
D)zero
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
23
The plastic state of stress was proposed by

A)mohr
B)rankine
C)coulomb
D)darcy
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
24
The position of the backfill lying above the horizontal plane at the top of wall is called

A)active state
B)plasticity
C)surcharge
D)slip lines
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
25
A structure that allows water to flow under a road, railroad, trail, or similar obstruction from one side to the other side is called as

A)drainage
B)bridges
C)tunnel
D)culverts
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.