Deck 2: System Development, Requirements Analysis, and Risk Management

ملء الشاشة (f)
exit full mode
سؤال
The phase of System Development associated with creation of the test data is

A)system analysis
B)physical design
C)system acceptance
D)logical design
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Which of the following is not a named phase in the System development life cycle ?

A)assessment
B)maintenance
C)development
D)testing
سؤال
What is the ?nal outcome of the requirements analysis and speci?cations phase ?

A)drawing the data ?ow diagram
B)the srs document
C)coding the project
D)the user manual
سؤال
A Use-case actor is always a person having a role that different people may play.
سؤال
The user system requirements are the parts of which document ?

A)sda
B)srs
C)srr
D)rar
سؤال
What are the types of requirement in Quality Function Deployment(QFD) ?

A)known, unknown, undreamed
B)user, developer
C)functional, non-functional
D)normal, expected, exciting
سؤال
Traceability is not considered in Requirement Analysis.
سؤال
Which of the following statements about SRS is/are true ?
i. SRS is written by customer
ii. SRS is written by a developer
iii. SRS serves as a contract between customer and developer

A)only i is true
B)both ii and iii are true
C)all are true
D)none of the above
سؤال
Risk management is one of the most important jobs for a

A)client
B)client.
C)production team
D)project manager
سؤال
Which of the following risk is the failure of a purchased component to perform as expected?

A)product risk
B)project risk
C)business risk
D)programming risk
سؤال
Which of the following term is best de?ned by the statement: "There will be a change of organizational management with different priorities."?

A)staff turnover
B)technology change
C)management change
D)product competition
سؤال
Which of the following term is best de?ned by the statement: "The underlying technology on which the system is built is superseded by new technology."?

A)technology change
B)product competition
C)requirements change
D)none of the mentioned
سؤال
What assess the risk and your plans for risk mitigation and revise these when you learn more about the risk?

A)risk monitoring
B)risk planning
C)risk analysis
D)risk identi?cation
سؤال
Which of the following risks are derived from the organizational environment where the software is being developed?

A)people risks
B)technology risks
C)estimation risks
D)organizational risks
سؤال
Which of the following risks are derived from the software or hardware technologies that are used to develop the system?

A)managerial risks
B)technology risks
C)estimation risks
D)organizational risks
سؤال
Which of the following term is best de?ned by the statement: "Derive traceability information to maximize information hiding in the design."?

A)underestimate d development time
B)organizational restructuring
C)requirements changes
D)none of the mentioned
سؤال
Which of the following strategies means that the impact of the risk will be reduced?

A)avoidance strategies
B)minimization strategies
C)contingency plans
D)all of the mentioned
سؤال
Risk management is now recognized as one of the most important project management tasks.
سؤال
Choose the correct option according to the given statements regarding risk management.Statement
1: A risk is a potential problem-it might happen, it might not.
Statement
2: Managers, software engineers, and customers participate in risk analysis and management. Statement
3: Only Managers participate in risk analysis and management.

A)statement 1 and 2 are correct.
B)only statement 1 is correct.
C)only statement 3 is correct.
D)statement 1 and 3 are correct.
سؤال
Reactive risk management is sometimes described as:

A)fire ?ghting mode
B)solution mode.
C)uncertain mode
D)none of the above.
سؤال
Software risk always involves two characteristics. What are those characteristics?

A)uncertainty and loss
B)certainty and pro?t
C)staff size and budget
D)project deadline and budget
سؤال
What is/are the different types of risk may occur when you develop software?

A)project risks
B)technical risks
C)business risks
D)all of the above
سؤال
Effective risk management plan needs to address which of these issues?

A)risk avoidance
B)risk monitoring
C)risk management and contingency planning
D)all of the above.
سؤال
Risk mitigation is a risk activity. Risk monitoring is a activity

A)avoidance, project tracking.
B)increasing, project tracking.
C)project tracking, avoidance.
D)random, tracking.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/24
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 2: System Development, Requirements Analysis, and Risk Management
1
The phase of System Development associated with creation of the test data is

A)system analysis
B)physical design
C)system acceptance
D)logical design
system acceptance
2
Which of the following is not a named phase in the System development life cycle ?

A)assessment
B)maintenance
C)development
D)testing
assessment
3
What is the ?nal outcome of the requirements analysis and speci?cations phase ?

A)drawing the data ?ow diagram
B)the srs document
C)coding the project
D)the user manual
the srs document
4
A Use-case actor is always a person having a role that different people may play.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
5
The user system requirements are the parts of which document ?

A)sda
B)srs
C)srr
D)rar
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
6
What are the types of requirement in Quality Function Deployment(QFD) ?

A)known, unknown, undreamed
B)user, developer
C)functional, non-functional
D)normal, expected, exciting
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
7
Traceability is not considered in Requirement Analysis.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
8
Which of the following statements about SRS is/are true ?
i. SRS is written by customer
ii. SRS is written by a developer
iii. SRS serves as a contract between customer and developer

A)only i is true
B)both ii and iii are true
C)all are true
D)none of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
9
Risk management is one of the most important jobs for a

A)client
B)client.
C)production team
D)project manager
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
10
Which of the following risk is the failure of a purchased component to perform as expected?

A)product risk
B)project risk
C)business risk
D)programming risk
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
11
Which of the following term is best de?ned by the statement: "There will be a change of organizational management with different priorities."?

A)staff turnover
B)technology change
C)management change
D)product competition
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
12
Which of the following term is best de?ned by the statement: "The underlying technology on which the system is built is superseded by new technology."?

A)technology change
B)product competition
C)requirements change
D)none of the mentioned
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
13
What assess the risk and your plans for risk mitigation and revise these when you learn more about the risk?

A)risk monitoring
B)risk planning
C)risk analysis
D)risk identi?cation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
14
Which of the following risks are derived from the organizational environment where the software is being developed?

A)people risks
B)technology risks
C)estimation risks
D)organizational risks
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
15
Which of the following risks are derived from the software or hardware technologies that are used to develop the system?

A)managerial risks
B)technology risks
C)estimation risks
D)organizational risks
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
16
Which of the following term is best de?ned by the statement: "Derive traceability information to maximize information hiding in the design."?

A)underestimate d development time
B)organizational restructuring
C)requirements changes
D)none of the mentioned
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
17
Which of the following strategies means that the impact of the risk will be reduced?

A)avoidance strategies
B)minimization strategies
C)contingency plans
D)all of the mentioned
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
18
Risk management is now recognized as one of the most important project management tasks.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
19
Choose the correct option according to the given statements regarding risk management.Statement
1: A risk is a potential problem-it might happen, it might not.
Statement
2: Managers, software engineers, and customers participate in risk analysis and management. Statement
3: Only Managers participate in risk analysis and management.

A)statement 1 and 2 are correct.
B)only statement 1 is correct.
C)only statement 3 is correct.
D)statement 1 and 3 are correct.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
20
Reactive risk management is sometimes described as:

A)fire ?ghting mode
B)solution mode.
C)uncertain mode
D)none of the above.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
21
Software risk always involves two characteristics. What are those characteristics?

A)uncertainty and loss
B)certainty and pro?t
C)staff size and budget
D)project deadline and budget
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
22
What is/are the different types of risk may occur when you develop software?

A)project risks
B)technical risks
C)business risks
D)all of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
23
Effective risk management plan needs to address which of these issues?

A)risk avoidance
B)risk monitoring
C)risk management and contingency planning
D)all of the above.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
24
Risk mitigation is a risk activity. Risk monitoring is a activity

A)avoidance, project tracking.
B)increasing, project tracking.
C)project tracking, avoidance.
D)random, tracking.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 24 في هذه المجموعة.