Deck 10: Sales and Operations Planning and Enterprise Resource Planning

ملء الشاشة (f)
exit full mode
سؤال
Which of the following is an input to the SOP process?

A)Demand forecasts
B)Product prices
C)Materials planning
D)Master schedule
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
In the level SOP strategy,variations in demand from period to period are met by

A)varying production levels by adjusting employment levels.
B)varying production levels without adjusting employment levels.
C)changing price levels.
D)using inventory buffers.
سؤال
The feasibility check of a Sales and Operations Plan (SOP)is

A)rough-cut capacity planning (RCCP).
B)the aggregate capacity plan.
C)the detailed capacity plan.
D)enterprise capacity plan.
سؤال
The typical time horizon for developing a Master Production Schedule (MPS)is

A)6 months to 1 year.
B)up to 3 months.
C)weekly.
D)daily.
سؤال
The feasibility check of a Master Production Schedule (MPS)is

A)rough-cut capacity planning (RCCP).
B)the aggregate capacity plan.
C)the detailed capacity plan.
D)enterprise capacity plan.
سؤال
The typical time horizon for developing a Sales and Operations Plan (SOP)is

A)6 months to 1 year.
B)up to 3 months.
C)weekly.
D)daily.
سؤال
The strategy that varies prices in order to match capacity with demand is known as

A)chase SOP.
B)level SOP.
C)yield management.
D)rough-cut capacity management.
سؤال
The feasibility check of a Master Production Schedule (MPS)is the aggregate capacity plan.
سؤال
Sales and Operations Planning is also known as aggregate planning.
سؤال
The goal of aggregate planning is to achieve a production plan that attempts to balance the organization's resources and meet expected demand.
سؤال
An advantage of the chase SOP strategy is that inventories can be kept relatively low.
سؤال
Disaggregating an SOP plan leads to a master production schedule (MPS).
سؤال
The feasibility check of a Sales and Operations Plan (SOP)is rough-cut capacity planning.
سؤال
The typical time horizon for production activity control and purchasing is

A)6 months to 1 year.
B)up to 3 months.
C)weekly.
D)daily.
سؤال
In doing "aggregate planning" for a firm producing paint,the aggregate planners would most likely deal with

A)just gallons of paint,without concern for the different colors and sizes.
B)gallons of paint,but be concerned with the different colors to be produced.
C)gallons,quarts,pints,and all the different sizes to be produced.
D)all the different sizes and all the different colors by size.
سؤال
A planning strategy that produces the exact amount demanded in each period is known as

A)chase SOP.
B)level SOP.
C)hybrid SOP.
D)rough-cut SOP.
سؤال
Aggregate planning is intermediate-range capacity planning that typically covers a time horizon of one to three months.
سؤال
A planning strategy that produces the same amount every period,and demand is met by varying inventory levels is known as

A)chase SOP.
B)level SOP.
C)hybrid SOP.
D)rough-cut SOP.
سؤال
Breaking product families into individual products and components of products is called

A)product breakdown.
B)component planning.
C)disaggregation.
D)enterprise planning.
سؤال
Creating a high-level planning,which involves groups or families of products is called

A)group planning.
B)aggregation.
C)master scheduling.
D)enterprise planning.
سؤال
The capacity for a machine or system that is available after accounting only for scrap and rework is known as actual capacity.
سؤال
A planning system that focuses on bottlenecks to ensure that the MPS does not overload production processes or facilities is known as ________.
سؤال
A planning strategy that produces the same amount every period,and demand is met by varying inventory levels is known as ________.
سؤال
Inventory information for firm Best Tools: <strong>Inventory information for firm Best Tools:   What is the expected inventory at the end of April?</strong> A)50 units B)150 units C)250 units D)350 units <div style=padding-top: 35px>
What is the expected inventory at the end of April?

A)50 units
B)150 units
C)250 units
D)350 units
سؤال
The capacity for a machine or system that is available after accounting for scrap and rework and also factors in inefficiencies inherent in the system is known as available capacity.
سؤال
Systems that help managers make decisions relating to the creation of schedules that balance demand and supply are known as ________.
سؤال
Using mechanisms such as pricing to level demand is called ________.
سؤال
The capacity that a machine or system should realize given optimal operating conditions is the design capacity.
سؤال
A planning strategy that produces products in the exact amount demanded in each period is known as ________.
سؤال
The portion of ERP that disaggregates the sales and operations plan (SOP)to determine when individual products will be produced is known as the ________.
سؤال
Orders that are held in abeyance until more stock arrives are known as ________.
سؤال
Creating a high-level overview of planning,which involves groups or families of products,is called ________.
سؤال
A printer has been rated by the manufacturer to print 40 pages per minute (ppm).However it is noticed that the printer has a 5% jamming rate.Hence the actual capacity of the printer is 36 pages per minute (ppm).
سؤال
A method for planning capacity on a daily basis is known as ________.
سؤال
A manager has prepared a forecast of expected aggregate demand for the next six months.Develop an aggregate plan to meet this demand given this additional information: A level production rate of 100 units per month will be used.Backorders are allowed,and they are charged at the rate of $8 per unit per month.Inventory holding costs,using average monthly inventory levels,are $1 per unit per month.Determine the cost of this plan if regular time cost is $20 per unit and beginning inventory is zero.
A manager has prepared a forecast of expected aggregate demand for the next six months.Develop an aggregate plan to meet this demand given this additional information: A level production rate of 100 units per month will be used.Backorders are allowed,and they are charged at the rate of $8 per unit per month.Inventory holding costs,using average monthly inventory levels,are $1 per unit per month.Determine the cost of this plan if regular time cost is $20 per unit and beginning inventory is zero.  <div style=padding-top: 35px>
سؤال
In the chase SOP strategy,variations in demand from period to period are met by

A)varying production levels.
B)keeping production constant.
C)changing price levels.
D)using inventory buffers.
سؤال
In yield management,the mechanism used to match capacity with demand is by

A)varying production levels.
B)keeping production constant.
C)changing price levels.
D)using inventory buffers.
سؤال
Breaking product families into individual products and components of products is called ________.
سؤال
Inventory information for firm Best Tools: <strong>Inventory information for firm Best Tools:   What was the inventory at the end of March?</strong> A)50 units B)150 units C)250 units D)350 units <div style=padding-top: 35px>
What was the inventory at the end of March?

A)50 units
B)150 units
C)250 units
D)350 units
سؤال
The design capacity of a machine or system refers to the maximum output that can possibly be attained given optimal operating conditions.
سؤال
The rate of capacity utilization that minimizes average product cost is known as

A)economies of scale.
B)diseconomies of scale.
C)best operating level.
D)efficiency.
سؤال
The capacity for a machine or system that is available after accounting for scrap and rework is known as ________.
سؤال
The capacity for a machine or system that is available after accounting for scrap and rework is known as

A)design capacity.
B)available capacity.
C)actual capacity.
D)rough capacity.
سؤال
A printer has been rated by the manufacturer to print 40 pages per minute (ppm).This is the ________ capacity of the printer.
سؤال
The productive capability of a firm is known as ________.
سؤال
A printer has been rated by the manufacturer to print 40 pages per minute (ppm).However it is noticed that the printer has a 5% jamming rate,and also on average 20% of the time is lost on account of the operator loading the paper,aligning the print cartridge,etc.Thus,effectively the printer can print ________ pages per minute (ppm).
سؤال
The capacity for a machine or system that is available after accounting for scrap and rework and also factors in inefficiencies inherent in the system is known as

A)design capacity.
B)available capacity.
C)actual capacity.
D)rough capacity.
سؤال
Which of these factors need to be considered when computing the available capacity of a machine or system?

A)Scrap
B)Inefficiencies
C)Rework
D)A and B above
E)A and C above
سؤال
The rate of capacity utilization that minimizes average product cost is known as ________.
سؤال
Which of these factors need to be considered when computing the actual capacity of a machine or system?

A)Scrap
B)Inefficiencies
C)Rework
D)All of the above
E)A and C above
سؤال
The phenomenon where producing more such that the average cost of production for the item decreases is known as

A)economies of scale.
B)diseconomies of scale.
C)best operating level.
D)efficiency.
سؤال
A printer has been rated by the manufacturer to print 40 pages per minute (ppm).However it is noticed that the printer has a 5% jamming rate,and also on average 20% of the time is lost on account of the operator loading the paper,aligning the print cartridge,etc.Thus,effectively the printer can print how many pages per minute (ppm)?

A)30.4
B)36
C)28.8
D)24.6
سؤال
A printer has been rated by the manufacturer to print 40 pages per minute (ppm).However it is noticed that the printer has a 5% jamming rate,thus effectively printing 38 pages per minute (ppm).This is the ________ capacity of the printer.
سؤال
The capacity for a machine or system that is available after accounting for scrap and rework and also factors in inefficiencies inherent in the system is known as ________.
سؤال
The capacity that a machine or system should realize given optimal operating conditions is known as

A)design capacity.
B)available capacity.
C)actual capacity.
D)rough capacity.
سؤال
A step in a process that constraints the throughput of the process is known as ________.
سؤال
A printer has been rated by the manufacturer to print 40 pages per minute (ppm).However it is noticed that the printer has a 5% jamming rate,and also on average 20% of the time is lost on account of the operator loading the paper,aligning the print cartridge,etc.Thus,effectively the printer can print 30.4 pages per minute (ppm).This is the ________ capacity of the printer.
سؤال
Increasing the capacity of the operation just before a bottleneck operation will increase the output of the process.
سؤال
The phenomenon where production of more units results in higher average cost per item is known as

A)economies of scale.
B)diseconomies of scale.
C)best operating level.
D)disefficiency.
سؤال
The capacity that a machine or system should realize given optimal operating conditions is known as ________.
سؤال
Given the following information,compute the efficiency of the system. Actual capacity = 50 units per day
Design capacity = 100 units per day
Actual output = 30 units per day

A)20%
B)40%
C)60%
D)80%
سؤال
Large-scale capacity expansion with the expectation of high customer demand is called ________.
سؤال
Given the following information,compute the efficiency of the system. Actual capacity = 80 units per day
Design capacity = 100 units per day
Utilization = 48%

A)20%
B)40%
C)60%
D)80%
سؤال
The phenomenon where producing more such that the average cost of production for the item decreases is known as ________.
سؤال
The capacity strategy where capacity is only increased when increasing demand justifies the increase in capacity is called ________.
سؤال
In a lagging capacity strategy,capacity is added in anticipation of demand.
سؤال
Efficiency is defined as the ratio of

A)actual output to actual capacity.
B)actual output to design capacity.
C)design capacity to actual capacity.
D)actual capacity to actual output.
سؤال
The capacity strategy where capacity is added in anticipation of demand is called ________.
سؤال
Given the following information,compute the capacity utilization of the system. Actual capacity = 30 units per day
Design capacity = 50 units per day
Actual output = 20 units per day

A)20%
B)40%
C)60%
D)80%
سؤال
The ratio of actual output to actual capacity is called ________.
سؤال
The capacity strategy where capacity is increased at relatively the same rate that demand increases is called

A)leading capacity.
B)lagging capacity.
C)matching capacity.
D)mass capacity.
سؤال
Capacity utilization is the ratio of actual output to actual capacity.
سؤال
The ratio of actual output to actual capacity is

A)efficiency.
B)throughput.
C)utilization.
D)productivity.
سؤال
Efficiency is the ratio of actual output to design capacity.
سؤال
Capacity utilization is defined as the ratio of

A)actual output to actual capacity.
B)actual output to design capacity.
C)design capacity to actual capacity.
D)actual capacity to actual output.
سؤال
The capacity strategy where capacity is added in anticipation of demand is called

A)leading capacity.
B)lagging capacity.
C)matching capacity.
D)mass capacity.
سؤال
The phenomenon where production of more units results in higher average cost per item is known as ________.
سؤال
In a matching capacity strategy,capacity is increased at relatively the same rate that demand increases.
سؤال
The capacity strategy where capacity is increased at relatively the same rate that demand increases is called ________.
سؤال
The ratio of actual output to design capacity is

A)efficiency.
B)throughput.
C)utilization.
D)productivity.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/110
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 10: Sales and Operations Planning and Enterprise Resource Planning
1
Which of the following is an input to the SOP process?

A)Demand forecasts
B)Product prices
C)Materials planning
D)Master schedule
A
2
In the level SOP strategy,variations in demand from period to period are met by

A)varying production levels by adjusting employment levels.
B)varying production levels without adjusting employment levels.
C)changing price levels.
D)using inventory buffers.
D
3
The feasibility check of a Sales and Operations Plan (SOP)is

A)rough-cut capacity planning (RCCP).
B)the aggregate capacity plan.
C)the detailed capacity plan.
D)enterprise capacity plan.
B
4
The typical time horizon for developing a Master Production Schedule (MPS)is

A)6 months to 1 year.
B)up to 3 months.
C)weekly.
D)daily.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
5
The feasibility check of a Master Production Schedule (MPS)is

A)rough-cut capacity planning (RCCP).
B)the aggregate capacity plan.
C)the detailed capacity plan.
D)enterprise capacity plan.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
6
The typical time horizon for developing a Sales and Operations Plan (SOP)is

A)6 months to 1 year.
B)up to 3 months.
C)weekly.
D)daily.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
7
The strategy that varies prices in order to match capacity with demand is known as

A)chase SOP.
B)level SOP.
C)yield management.
D)rough-cut capacity management.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
8
The feasibility check of a Master Production Schedule (MPS)is the aggregate capacity plan.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
9
Sales and Operations Planning is also known as aggregate planning.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
10
The goal of aggregate planning is to achieve a production plan that attempts to balance the organization's resources and meet expected demand.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
11
An advantage of the chase SOP strategy is that inventories can be kept relatively low.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
12
Disaggregating an SOP plan leads to a master production schedule (MPS).
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
13
The feasibility check of a Sales and Operations Plan (SOP)is rough-cut capacity planning.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
14
The typical time horizon for production activity control and purchasing is

A)6 months to 1 year.
B)up to 3 months.
C)weekly.
D)daily.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
15
In doing "aggregate planning" for a firm producing paint,the aggregate planners would most likely deal with

A)just gallons of paint,without concern for the different colors and sizes.
B)gallons of paint,but be concerned with the different colors to be produced.
C)gallons,quarts,pints,and all the different sizes to be produced.
D)all the different sizes and all the different colors by size.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
16
A planning strategy that produces the exact amount demanded in each period is known as

A)chase SOP.
B)level SOP.
C)hybrid SOP.
D)rough-cut SOP.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
17
Aggregate planning is intermediate-range capacity planning that typically covers a time horizon of one to three months.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
18
A planning strategy that produces the same amount every period,and demand is met by varying inventory levels is known as

A)chase SOP.
B)level SOP.
C)hybrid SOP.
D)rough-cut SOP.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
19
Breaking product families into individual products and components of products is called

A)product breakdown.
B)component planning.
C)disaggregation.
D)enterprise planning.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
20
Creating a high-level planning,which involves groups or families of products is called

A)group planning.
B)aggregation.
C)master scheduling.
D)enterprise planning.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
21
The capacity for a machine or system that is available after accounting only for scrap and rework is known as actual capacity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
22
A planning system that focuses on bottlenecks to ensure that the MPS does not overload production processes or facilities is known as ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
23
A planning strategy that produces the same amount every period,and demand is met by varying inventory levels is known as ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
24
Inventory information for firm Best Tools: <strong>Inventory information for firm Best Tools:   What is the expected inventory at the end of April?</strong> A)50 units B)150 units C)250 units D)350 units
What is the expected inventory at the end of April?

A)50 units
B)150 units
C)250 units
D)350 units
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
25
The capacity for a machine or system that is available after accounting for scrap and rework and also factors in inefficiencies inherent in the system is known as available capacity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
26
Systems that help managers make decisions relating to the creation of schedules that balance demand and supply are known as ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
27
Using mechanisms such as pricing to level demand is called ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
28
The capacity that a machine or system should realize given optimal operating conditions is the design capacity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
29
A planning strategy that produces products in the exact amount demanded in each period is known as ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
30
The portion of ERP that disaggregates the sales and operations plan (SOP)to determine when individual products will be produced is known as the ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
31
Orders that are held in abeyance until more stock arrives are known as ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
32
Creating a high-level overview of planning,which involves groups or families of products,is called ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
33
A printer has been rated by the manufacturer to print 40 pages per minute (ppm).However it is noticed that the printer has a 5% jamming rate.Hence the actual capacity of the printer is 36 pages per minute (ppm).
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
34
A method for planning capacity on a daily basis is known as ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
35
A manager has prepared a forecast of expected aggregate demand for the next six months.Develop an aggregate plan to meet this demand given this additional information: A level production rate of 100 units per month will be used.Backorders are allowed,and they are charged at the rate of $8 per unit per month.Inventory holding costs,using average monthly inventory levels,are $1 per unit per month.Determine the cost of this plan if regular time cost is $20 per unit and beginning inventory is zero.
A manager has prepared a forecast of expected aggregate demand for the next six months.Develop an aggregate plan to meet this demand given this additional information: A level production rate of 100 units per month will be used.Backorders are allowed,and they are charged at the rate of $8 per unit per month.Inventory holding costs,using average monthly inventory levels,are $1 per unit per month.Determine the cost of this plan if regular time cost is $20 per unit and beginning inventory is zero.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
36
In the chase SOP strategy,variations in demand from period to period are met by

A)varying production levels.
B)keeping production constant.
C)changing price levels.
D)using inventory buffers.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
37
In yield management,the mechanism used to match capacity with demand is by

A)varying production levels.
B)keeping production constant.
C)changing price levels.
D)using inventory buffers.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
38
Breaking product families into individual products and components of products is called ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
39
Inventory information for firm Best Tools: <strong>Inventory information for firm Best Tools:   What was the inventory at the end of March?</strong> A)50 units B)150 units C)250 units D)350 units
What was the inventory at the end of March?

A)50 units
B)150 units
C)250 units
D)350 units
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
40
The design capacity of a machine or system refers to the maximum output that can possibly be attained given optimal operating conditions.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
41
The rate of capacity utilization that minimizes average product cost is known as

A)economies of scale.
B)diseconomies of scale.
C)best operating level.
D)efficiency.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
42
The capacity for a machine or system that is available after accounting for scrap and rework is known as ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
43
The capacity for a machine or system that is available after accounting for scrap and rework is known as

A)design capacity.
B)available capacity.
C)actual capacity.
D)rough capacity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
44
A printer has been rated by the manufacturer to print 40 pages per minute (ppm).This is the ________ capacity of the printer.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
45
The productive capability of a firm is known as ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
46
A printer has been rated by the manufacturer to print 40 pages per minute (ppm).However it is noticed that the printer has a 5% jamming rate,and also on average 20% of the time is lost on account of the operator loading the paper,aligning the print cartridge,etc.Thus,effectively the printer can print ________ pages per minute (ppm).
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
47
The capacity for a machine or system that is available after accounting for scrap and rework and also factors in inefficiencies inherent in the system is known as

A)design capacity.
B)available capacity.
C)actual capacity.
D)rough capacity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
48
Which of these factors need to be considered when computing the available capacity of a machine or system?

A)Scrap
B)Inefficiencies
C)Rework
D)A and B above
E)A and C above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
49
The rate of capacity utilization that minimizes average product cost is known as ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
50
Which of these factors need to be considered when computing the actual capacity of a machine or system?

A)Scrap
B)Inefficiencies
C)Rework
D)All of the above
E)A and C above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
51
The phenomenon where producing more such that the average cost of production for the item decreases is known as

A)economies of scale.
B)diseconomies of scale.
C)best operating level.
D)efficiency.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
52
A printer has been rated by the manufacturer to print 40 pages per minute (ppm).However it is noticed that the printer has a 5% jamming rate,and also on average 20% of the time is lost on account of the operator loading the paper,aligning the print cartridge,etc.Thus,effectively the printer can print how many pages per minute (ppm)?

A)30.4
B)36
C)28.8
D)24.6
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
53
A printer has been rated by the manufacturer to print 40 pages per minute (ppm).However it is noticed that the printer has a 5% jamming rate,thus effectively printing 38 pages per minute (ppm).This is the ________ capacity of the printer.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
54
The capacity for a machine or system that is available after accounting for scrap and rework and also factors in inefficiencies inherent in the system is known as ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
55
The capacity that a machine or system should realize given optimal operating conditions is known as

A)design capacity.
B)available capacity.
C)actual capacity.
D)rough capacity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
56
A step in a process that constraints the throughput of the process is known as ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
57
A printer has been rated by the manufacturer to print 40 pages per minute (ppm).However it is noticed that the printer has a 5% jamming rate,and also on average 20% of the time is lost on account of the operator loading the paper,aligning the print cartridge,etc.Thus,effectively the printer can print 30.4 pages per minute (ppm).This is the ________ capacity of the printer.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
58
Increasing the capacity of the operation just before a bottleneck operation will increase the output of the process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
59
The phenomenon where production of more units results in higher average cost per item is known as

A)economies of scale.
B)diseconomies of scale.
C)best operating level.
D)disefficiency.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
60
The capacity that a machine or system should realize given optimal operating conditions is known as ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
61
Given the following information,compute the efficiency of the system. Actual capacity = 50 units per day
Design capacity = 100 units per day
Actual output = 30 units per day

A)20%
B)40%
C)60%
D)80%
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
62
Large-scale capacity expansion with the expectation of high customer demand is called ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
63
Given the following information,compute the efficiency of the system. Actual capacity = 80 units per day
Design capacity = 100 units per day
Utilization = 48%

A)20%
B)40%
C)60%
D)80%
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
64
The phenomenon where producing more such that the average cost of production for the item decreases is known as ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
65
The capacity strategy where capacity is only increased when increasing demand justifies the increase in capacity is called ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
66
In a lagging capacity strategy,capacity is added in anticipation of demand.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
67
Efficiency is defined as the ratio of

A)actual output to actual capacity.
B)actual output to design capacity.
C)design capacity to actual capacity.
D)actual capacity to actual output.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
68
The capacity strategy where capacity is added in anticipation of demand is called ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
69
Given the following information,compute the capacity utilization of the system. Actual capacity = 30 units per day
Design capacity = 50 units per day
Actual output = 20 units per day

A)20%
B)40%
C)60%
D)80%
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
70
The ratio of actual output to actual capacity is called ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
71
The capacity strategy where capacity is increased at relatively the same rate that demand increases is called

A)leading capacity.
B)lagging capacity.
C)matching capacity.
D)mass capacity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
72
Capacity utilization is the ratio of actual output to actual capacity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
73
The ratio of actual output to actual capacity is

A)efficiency.
B)throughput.
C)utilization.
D)productivity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
74
Efficiency is the ratio of actual output to design capacity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
75
Capacity utilization is defined as the ratio of

A)actual output to actual capacity.
B)actual output to design capacity.
C)design capacity to actual capacity.
D)actual capacity to actual output.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
76
The capacity strategy where capacity is added in anticipation of demand is called

A)leading capacity.
B)lagging capacity.
C)matching capacity.
D)mass capacity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
77
The phenomenon where production of more units results in higher average cost per item is known as ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
78
In a matching capacity strategy,capacity is increased at relatively the same rate that demand increases.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
79
The capacity strategy where capacity is increased at relatively the same rate that demand increases is called ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
80
The ratio of actual output to design capacity is

A)efficiency.
B)throughput.
C)utilization.
D)productivity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 110 في هذه المجموعة.