Deck 12: Project Management

ملء الشاشة (f)
exit full mode
سؤال
As per Hersey and Blanchard's Situation Leadership Model,the manager's role of telling is categorized as

A)Low Task Behavior and Low Relationship Behavior.
B)Low Task Behavior and High Relationship Behavior.
C)High Task Behavior and High Relationship Behavior.
D)High Task Behavior and Low Relationship Behavior.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
The scope of a process improvement project team usually involves a local or single department.
سؤال
As per Belbin,a person whose strengths are maturity,confidence,someone who clarifies goals,promotes decision making and delegates well is ideal for the project team role of

A)shaper.
B)implementer.
C)coordinator.
D)resource investigator.
سؤال
The project team stage of development when the team members get to know each other,however,agreements have not yet been made to facilitate smooth interaction between team members,is

A)forming.
B)storming.
C)norming.
D)performing.
سؤال
As per Belbin,a person whose strengths are to be disciplined,reliable,conservative and efficient is ideal for the project team role of

A)shaper.
B)implementer.
C)coordinator.
D)resource investigator.
سؤال
The scope or participation in a Tiger team usually involves a local or single department.
سؤال
The project charter is most likely to include the project goals,scope and deliverables.
سؤال
Integrated change control is a key activity during the monitoring and controlling phase of a project.
سؤال
As per Belbin,a person who has the strengths of being an extrovert,enthusiastic,communicative and someone who explores opportunities and develops contacts is ideal for the project team role of

A)shaper.
B)implementer.
C)coordinator.
D)resource investigator.
سؤال
Reporting to see that the project plan is being followed is a key activity during which phase of a project?

A)Initiation
B)Planning
C)Executing
D)Monitoring and controlling
سؤال
Scheduling production on a weekly basis is an example of a project.
سؤال
The project planning step of estimating activity times is done before determining the work breakdown structure of a project.
سؤال
Developing the project charter is a key activity during the planning phase of a project.
سؤال
Integrated change control is a key activity during which phase of a project?

A)Initiation
B)Planning
C)Executing
D)Monitoring and controlling
سؤال
As per Hersey and Blanchard's Situation Leadership Model,the manager's role of participating is categorized as

A)Low Task Behavior and Low Relationship Behavior.
B)Low Task Behavior and High Relationship Behavior.
C)High Task Behavior and High Relationship Behavior.
D)High Task Behavior and Low Relationship Behavior.
سؤال
Developing the preliminary project scope statement is a key activity during which phase of a project?

A)Initiation
B)Planning
C)Executing
D)Monitoring and controlling
سؤال
As per Hersey and Blanchard's Situation Leadership Model,which role of a manager can be described as Low Task Behavior and Low Relationship Behavior?

A)Delegating
B)Participating
C)Selling
D)Telling
سؤال
Developing the project management plan is a key activity during which phase of a project?

A)Initiation
B)Planning
C)Executing
D)Monitoring and controlling
سؤال
The project team stage of development when the team becomes a cohesive unit and interdependence,trust,and cooperation develops between team members is

A)forming.
B)storming.
C)norming.
D)performing.
سؤال
Developing the project charter is a key activity during which phase of a project?

A)Initiation
B)Planning
C)Executing
D)Monitoring and controlling
سؤال
The act of celebrating successes,releasing resources,including people,and performing a project debrief is known as ________.
سؤال
________ is a term applied to the process of managing changes to the project charter and plan.
سؤال
Performing the work necessary to complete the project is known as ________.
سؤال
Developing a road map for the project is known as ________.
سؤال
As per the Project risk/return matrix,projects that are excellent candidates have a

A)low risk factor and low return factor.
B)high risk factor and low return factor.
C)low risk factor and high return factor.
D)high risk factor and high return factor.
سؤال
Adding on unnecessary deliverables to a project is known as ________.
سؤال
People that are dispersed around the country or world and work together over the Internet are known as ________ team(s).
سؤال
The process of reporting to see to see that the project plan is being followed is known as ________.
سؤال
Specialists that are assigned full-time to a project that needs to be completed quickly are known as ________ team(s).
سؤال
A project to which an employee is assigned full-time is known as ________.
سؤال
Beginning project steps,including scoping and chartering projects,is known as ________.
سؤال
As per the Project risk/return matrix,projects that are low hanging fruit have a

A)low risk factor and low return factor.
B)high risk factor and low return factor.
C)low risk factor and high return factor.
D)high risk factor and high return factor.
سؤال
The act of defining what the team needs to do to complete a project is known as ________.
سؤال
The act of leading and directing the people and other resources in a project is known as ________.
سؤال
Procrastination in beginning project tasks is known as the ________.
سؤال
An organizational form in which an employee works part-time on a project team and continues to perform fundamental job assignments is known as ________ structure.
سؤال
A graph by Hersey and Blanchard that illustrates the correlation between task behavior,relationship behavior,and leadership behavior is known as the ________.
سؤال
A one-time,temporary endeavor with a defined beginning and ending is known as a ________.
سؤال
As per the Project risk/return matrix,projects that are poor candidates have a

A)low risk factor and low return factor.
B)high risk factor and low return factor.
C)low risk factor and high return factor.
D)high risk factor and high return factor.
سؤال
The project team stage of development when a mutually supportive,steady state is achieved is

A)forming.
B)storming.
C)norming.
D)performing.
سؤال
The network diagram describes sequential relationships among major tasks on a project.
سؤال
The shortest time for completing a project task is known as most likely completion time.
سؤال
Key phases in a project time line are often referred to as ________.
سؤال
Allowing the deliverables of a project to expand over time is known as ________.
سؤال
The best estimate for the time required to complete a project task is known as ________.
سؤال
A document that outlines the primary deliverables,the objective,and the parameters of a project is known as ________.
سؤال
Following are the three time estimates for a task in a project: optimistic completion time = 2 weeks
Most likely completion time = 4 weeks
Pessimistic completion time = 7 weeks
Compute the task variance.

A)0)5 weeks
B)1)23 weeks
C)0)69 weeks
D)2)25 weeks
سؤال
The formula which helps compute project times with a high probability of completion is known as ________.
سؤال
The earliest finish time for a task is equal to the latest finish time minus the task time.
سؤال
The act of creating a document outlining the deliverables of a project is known as ________.
سؤال
The longest foreseeable completion time is known as ________.
سؤال
The shortest time for completing a project task is known as ________.
سؤال
A tool for prioritizing potential projects where an estimate is made of the difficulty of completing the project in a reasonable amount of time with available resources is known as ________.
سؤال
The longest foreseeable task completion time is known as pessimistic completion time.
سؤال
The sum of times of the shortest path in a network indicates expected project completion time,and the tasks represent the critical activities.
سؤال
Key phases in a project time line are often referred to as milestones.
سؤال
The path in a network with the shortest length of time to completion is called the critical path.
سؤال
Following are the three time estimates for a task in a project: optimistic completion time = 2 weeks
Most likely completion time = 4 weeks
Pessimistic completion time = 7 weeks
Compute the expected time for the task.

A)3)5 weeks
B)4)167 weeks
C)5)23 weeks
D)5)75 weeks
سؤال
A tool for monitoring who is assigned to multiple projects is known as ________.
سؤال
The act of determining which tasks precede and follow other tasks is known as ________.
سؤال
Task C is directly preceded by two tasks-task A and task B.Task A has an expected task completion time of five weeks and an ES time of week 6.Task B has an expected task completion time of seven weeks and an ES time of week 7.Task C has an expected task completion time of 10 weeks.The ES for activity C is week

A)7)
B)14.
C)12.
D)24.
سؤال
Tasks not on the critical path have a slack time equal to zero.
سؤال
If two consecutive tasks on the same path each have two days of slack,this means that each of them can be delayed by two days without delaying the project.
سؤال
For this question,please use the standard normal distribution table,Table A2.It has been estimated that the mean time required to complete a project is 20 weeks and the variance of project completion time is 9 weeks.So there is a 95% chance that the project can be completed in

A)10 weeks.
B)19 weeks.
C)20 weeks.
D)26 weeks.
سؤال
In a project network,the critical path is the sequence of activities which has the

A)most tasks.
B)most nodes.
C)most events.
D)longest time.
سؤال
A sequence of activities that leads from the starting node to the finishing node is called a

A)path.
B)trail.
C)slack.
D)timeline.
سؤال
The path in a PERT network diagram with no slack is known as ________.
سؤال
The standard deviation of the critical path is equal to the sum of the standard deviations of all of the tasks on the critical path.
سؤال
The table below provides information about tasks to be completed on a project,the precedence relationship between tasks and the expected times required to complete each task.Using this information,represent the project tasks on a Activity-on-Node (AON)network diagram,identify all the paths and the critical path,the critical tasks,the ES,EF,LS and LF times for each task and the time estimate for completing the project.
The table below provides information about tasks to be completed on a project,the precedence relationship between tasks and the expected times required to complete each task.Using this information,represent the project tasks on a Activity-on-Node (AON)network diagram,identify all the paths and the critical path,the critical tasks,the ES,EF,LS and LF times for each task and the time estimate for completing the project.  <div style=padding-top: 35px>
سؤال
The latest starting time for a task is equal to the latest finish time minus the task time.
سؤال
The earliest finish time for a task is equal to the latest finish time minus the task slack.
سؤال
Tasks on the critical path with no slack are known as ________.
سؤال
Task C is directly preceded by two tasks-task A and task B.Task A has an expected task completion time of five weeks and an ES time of week 6.Task B has an expected task completion time of seven weeks and an ES time of week 7.Task C has an expected task completion time of 10 weeks.The EF for activity C is week

A)7)
B)14.
C)12.
D)24.
سؤال
The difference between the latest possible completion time and the earliest possible completion time for a project task is known as ________.
سؤال
The method for planning projects that uses shortest paths is called ________.
سؤال
The method for planning and controlling projects using networks is called ________.
سؤال
Given the portion of the network diagram shown below,where numbers in boxes show the task times,what is the earliest finish time for task C,if the earliest start time for task A is 10,and the earliest start time for task B is 13? <strong>Given the portion of the network diagram shown below,where numbers in boxes show the task times,what is the earliest finish time for task C,if the earliest start time for task A is 10,and the earliest start time for task B is 13?  </strong> A)13 B)16 C)20 D)24 <div style=padding-top: 35px>

A)13
B)16
C)20
D)24
سؤال
For this question,please use the standard normal distribution table,Table A2.It has been estimated that the mean time required to complete a project is 20 weeks and the variance of project completion time is 9 weeks.What is the probability that the project will be completed in 23 weeks?

A)34%
B)50%
C)68%
D)84%
سؤال
It has been estimated that the mean time required to complete a project is 20 weeks and the variance of project completion time is 9 weeks.So there is a 50% chance that the project can be completed in

A)10 weeks
B)19 weeks
C)20 weeks
D)26 weeks
سؤال
A project network in which activities are labeled on the network nodes is known as ________.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/90
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 12: Project Management
1
As per Hersey and Blanchard's Situation Leadership Model,the manager's role of telling is categorized as

A)Low Task Behavior and Low Relationship Behavior.
B)Low Task Behavior and High Relationship Behavior.
C)High Task Behavior and High Relationship Behavior.
D)High Task Behavior and Low Relationship Behavior.
D
2
The scope of a process improvement project team usually involves a local or single department.
True
3
As per Belbin,a person whose strengths are maturity,confidence,someone who clarifies goals,promotes decision making and delegates well is ideal for the project team role of

A)shaper.
B)implementer.
C)coordinator.
D)resource investigator.
C
4
The project team stage of development when the team members get to know each other,however,agreements have not yet been made to facilitate smooth interaction between team members,is

A)forming.
B)storming.
C)norming.
D)performing.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
5
As per Belbin,a person whose strengths are to be disciplined,reliable,conservative and efficient is ideal for the project team role of

A)shaper.
B)implementer.
C)coordinator.
D)resource investigator.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
6
The scope or participation in a Tiger team usually involves a local or single department.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
7
The project charter is most likely to include the project goals,scope and deliverables.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
8
Integrated change control is a key activity during the monitoring and controlling phase of a project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
9
As per Belbin,a person who has the strengths of being an extrovert,enthusiastic,communicative and someone who explores opportunities and develops contacts is ideal for the project team role of

A)shaper.
B)implementer.
C)coordinator.
D)resource investigator.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
10
Reporting to see that the project plan is being followed is a key activity during which phase of a project?

A)Initiation
B)Planning
C)Executing
D)Monitoring and controlling
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
11
Scheduling production on a weekly basis is an example of a project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
12
The project planning step of estimating activity times is done before determining the work breakdown structure of a project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
13
Developing the project charter is a key activity during the planning phase of a project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
14
Integrated change control is a key activity during which phase of a project?

A)Initiation
B)Planning
C)Executing
D)Monitoring and controlling
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
15
As per Hersey and Blanchard's Situation Leadership Model,the manager's role of participating is categorized as

A)Low Task Behavior and Low Relationship Behavior.
B)Low Task Behavior and High Relationship Behavior.
C)High Task Behavior and High Relationship Behavior.
D)High Task Behavior and Low Relationship Behavior.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
16
Developing the preliminary project scope statement is a key activity during which phase of a project?

A)Initiation
B)Planning
C)Executing
D)Monitoring and controlling
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
17
As per Hersey and Blanchard's Situation Leadership Model,which role of a manager can be described as Low Task Behavior and Low Relationship Behavior?

A)Delegating
B)Participating
C)Selling
D)Telling
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
18
Developing the project management plan is a key activity during which phase of a project?

A)Initiation
B)Planning
C)Executing
D)Monitoring and controlling
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
19
The project team stage of development when the team becomes a cohesive unit and interdependence,trust,and cooperation develops between team members is

A)forming.
B)storming.
C)norming.
D)performing.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
20
Developing the project charter is a key activity during which phase of a project?

A)Initiation
B)Planning
C)Executing
D)Monitoring and controlling
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
21
The act of celebrating successes,releasing resources,including people,and performing a project debrief is known as ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
22
________ is a term applied to the process of managing changes to the project charter and plan.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
23
Performing the work necessary to complete the project is known as ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
24
Developing a road map for the project is known as ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
25
As per the Project risk/return matrix,projects that are excellent candidates have a

A)low risk factor and low return factor.
B)high risk factor and low return factor.
C)low risk factor and high return factor.
D)high risk factor and high return factor.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
26
Adding on unnecessary deliverables to a project is known as ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
27
People that are dispersed around the country or world and work together over the Internet are known as ________ team(s).
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
28
The process of reporting to see to see that the project plan is being followed is known as ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
29
Specialists that are assigned full-time to a project that needs to be completed quickly are known as ________ team(s).
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
30
A project to which an employee is assigned full-time is known as ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
31
Beginning project steps,including scoping and chartering projects,is known as ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
32
As per the Project risk/return matrix,projects that are low hanging fruit have a

A)low risk factor and low return factor.
B)high risk factor and low return factor.
C)low risk factor and high return factor.
D)high risk factor and high return factor.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
33
The act of defining what the team needs to do to complete a project is known as ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
34
The act of leading and directing the people and other resources in a project is known as ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
35
Procrastination in beginning project tasks is known as the ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
36
An organizational form in which an employee works part-time on a project team and continues to perform fundamental job assignments is known as ________ structure.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
37
A graph by Hersey and Blanchard that illustrates the correlation between task behavior,relationship behavior,and leadership behavior is known as the ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
38
A one-time,temporary endeavor with a defined beginning and ending is known as a ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
39
As per the Project risk/return matrix,projects that are poor candidates have a

A)low risk factor and low return factor.
B)high risk factor and low return factor.
C)low risk factor and high return factor.
D)high risk factor and high return factor.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
40
The project team stage of development when a mutually supportive,steady state is achieved is

A)forming.
B)storming.
C)norming.
D)performing.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
41
The network diagram describes sequential relationships among major tasks on a project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
42
The shortest time for completing a project task is known as most likely completion time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
43
Key phases in a project time line are often referred to as ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
44
Allowing the deliverables of a project to expand over time is known as ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
45
The best estimate for the time required to complete a project task is known as ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
46
A document that outlines the primary deliverables,the objective,and the parameters of a project is known as ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
47
Following are the three time estimates for a task in a project: optimistic completion time = 2 weeks
Most likely completion time = 4 weeks
Pessimistic completion time = 7 weeks
Compute the task variance.

A)0)5 weeks
B)1)23 weeks
C)0)69 weeks
D)2)25 weeks
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
48
The formula which helps compute project times with a high probability of completion is known as ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
49
The earliest finish time for a task is equal to the latest finish time minus the task time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
50
The act of creating a document outlining the deliverables of a project is known as ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
51
The longest foreseeable completion time is known as ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
52
The shortest time for completing a project task is known as ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
53
A tool for prioritizing potential projects where an estimate is made of the difficulty of completing the project in a reasonable amount of time with available resources is known as ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
54
The longest foreseeable task completion time is known as pessimistic completion time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
55
The sum of times of the shortest path in a network indicates expected project completion time,and the tasks represent the critical activities.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
56
Key phases in a project time line are often referred to as milestones.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
57
The path in a network with the shortest length of time to completion is called the critical path.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
58
Following are the three time estimates for a task in a project: optimistic completion time = 2 weeks
Most likely completion time = 4 weeks
Pessimistic completion time = 7 weeks
Compute the expected time for the task.

A)3)5 weeks
B)4)167 weeks
C)5)23 weeks
D)5)75 weeks
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
59
A tool for monitoring who is assigned to multiple projects is known as ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
60
The act of determining which tasks precede and follow other tasks is known as ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
61
Task C is directly preceded by two tasks-task A and task B.Task A has an expected task completion time of five weeks and an ES time of week 6.Task B has an expected task completion time of seven weeks and an ES time of week 7.Task C has an expected task completion time of 10 weeks.The ES for activity C is week

A)7)
B)14.
C)12.
D)24.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
62
Tasks not on the critical path have a slack time equal to zero.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
63
If two consecutive tasks on the same path each have two days of slack,this means that each of them can be delayed by two days without delaying the project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
64
For this question,please use the standard normal distribution table,Table A2.It has been estimated that the mean time required to complete a project is 20 weeks and the variance of project completion time is 9 weeks.So there is a 95% chance that the project can be completed in

A)10 weeks.
B)19 weeks.
C)20 weeks.
D)26 weeks.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
65
In a project network,the critical path is the sequence of activities which has the

A)most tasks.
B)most nodes.
C)most events.
D)longest time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
66
A sequence of activities that leads from the starting node to the finishing node is called a

A)path.
B)trail.
C)slack.
D)timeline.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
67
The path in a PERT network diagram with no slack is known as ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
68
The standard deviation of the critical path is equal to the sum of the standard deviations of all of the tasks on the critical path.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
69
The table below provides information about tasks to be completed on a project,the precedence relationship between tasks and the expected times required to complete each task.Using this information,represent the project tasks on a Activity-on-Node (AON)network diagram,identify all the paths and the critical path,the critical tasks,the ES,EF,LS and LF times for each task and the time estimate for completing the project.
The table below provides information about tasks to be completed on a project,the precedence relationship between tasks and the expected times required to complete each task.Using this information,represent the project tasks on a Activity-on-Node (AON)network diagram,identify all the paths and the critical path,the critical tasks,the ES,EF,LS and LF times for each task and the time estimate for completing the project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
70
The latest starting time for a task is equal to the latest finish time minus the task time.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
71
The earliest finish time for a task is equal to the latest finish time minus the task slack.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
72
Tasks on the critical path with no slack are known as ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
73
Task C is directly preceded by two tasks-task A and task B.Task A has an expected task completion time of five weeks and an ES time of week 6.Task B has an expected task completion time of seven weeks and an ES time of week 7.Task C has an expected task completion time of 10 weeks.The EF for activity C is week

A)7)
B)14.
C)12.
D)24.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
74
The difference between the latest possible completion time and the earliest possible completion time for a project task is known as ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
75
The method for planning projects that uses shortest paths is called ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
76
The method for planning and controlling projects using networks is called ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
77
Given the portion of the network diagram shown below,where numbers in boxes show the task times,what is the earliest finish time for task C,if the earliest start time for task A is 10,and the earliest start time for task B is 13? <strong>Given the portion of the network diagram shown below,where numbers in boxes show the task times,what is the earliest finish time for task C,if the earliest start time for task A is 10,and the earliest start time for task B is 13?  </strong> A)13 B)16 C)20 D)24

A)13
B)16
C)20
D)24
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
78
For this question,please use the standard normal distribution table,Table A2.It has been estimated that the mean time required to complete a project is 20 weeks and the variance of project completion time is 9 weeks.What is the probability that the project will be completed in 23 weeks?

A)34%
B)50%
C)68%
D)84%
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
79
It has been estimated that the mean time required to complete a project is 20 weeks and the variance of project completion time is 9 weeks.So there is a 50% chance that the project can be completed in

A)10 weeks
B)19 weeks
C)20 weeks
D)26 weeks
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
80
A project network in which activities are labeled on the network nodes is known as ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 90 في هذه المجموعة.