Deck 18: Optimizing and Controlling Processes Through Statistical Process Control
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
سؤال
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/10
العب
ملء الشاشة (f)
Deck 18: Optimizing and Controlling Processes Through Statistical Process Control
1
Variation in any amount is considered a negative for quality.
True
2
At the heart of SPC is the realization that all processes have a natural, or built-in, variation. Processes may also be affected by special causes of variation. The objective of SPC is to separate special-cause variation from the natural variation.
True
3
For a process under SPC, it is important to frequently tweak its parameters in order to keep the process within the upper and lower control limits.
False
4
Before a process can qualify for SPC, it must be free of special-cause variation.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
5
Upper and lower control limits may be derived from logged process data, or from tolerance specifications.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
6
The rationale for western manufacturers to embrace SPC is:
A) Improve product quality and simultaneously reduce costs
B) To be able to compete better with Japan and the world's markets
C) Improve their product image
D) All of the above
A) Improve product quality and simultaneously reduce costs
B) To be able to compete better with Japan and the world's markets
C) Improve their product image
D) All of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
7
The most common inhibitor of SPC is:
A) Inadequate training
B) Lack of resources resulting from the absence of management commitment
C) Failure to have processes under control
D) Low production rates
A) Inadequate training
B) Lack of resources resulting from the absence of management commitment
C) Failure to have processes under control
D) Low production rates
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
8
When a process is "in control" what percent of its output will be within the ±3? limits?
A) 66.6%
B) 82.4%
C) 99.7%
D) 100%
A) 66.6%
B) 82.4%
C) 99.7%
D) 100%
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
9
The minimum management involvement relative to SPC training involves:
A) Providing sufficient funding
B) Teaching classes
C) Commitment
D) None of the above
A) Providing sufficient funding
B) Teaching classes
C) Commitment
D) None of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
10
The first step in the SPC execution phase is:
A) To develop control charts
B) Flowcharting or characterizing the process to which SPC will be applied
C) Eliminate the special causes of variation
D) Collect and plot SPC data
A) To develop control charts
B) Flowcharting or characterizing the process to which SPC will be applied
C) Eliminate the special causes of variation
D) Collect and plot SPC data
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck