Deck 1: Understanding Interior Design

ملء الشاشة (f)
exit full mode
سؤال
Interior design integrates the seemingly opposite disciplines of

A) art and science.
B) art and philosophy.
C) the physical and the psychological.
D) art and space.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
The concept of universal design requires projects to

A) universally meet cross-cultural needs.
B) adapt to those with temporary disabilities regardless of culture.
C) integrate the needs of a variety of clients.
D) meet the diverse needs of clients regardless of age and abilities.
سؤال
A project incorporating green design solutions would

A) involve the use of environmentally sustainable products.
B) involve the use of products made from the environment.
C) involve the use of products made from plants.
D) involve the use of organic design solutions.
سؤال
Which of the following is NOT a criterion for good design?

A) designing to meet the human factor.
B) current fashion trends.
C) integrity.
D) simplicity.
سؤال
Through _______the designer focuses on gathering information. Once this information is established it is_________ into a design solution.

A) synthesis: analyzed
B) the initial client contact; configured
C) programming; synthesized
D) analysis; synthesized
سؤال
The information gathering phase is called

A) initial client contact.
B) programming.
C) analysis.
D) schematic design.
سؤال
Design decisions involving broad-based concepts including the character, function, and aesthetics of the space describe which phase of design?

A) programming
B) conceptual design
C) design development
D) design concept
سؤال
The use of bubble diagrams, matrices, and blocking diagrams are all part of

A) programming.
B) space planning.
C) working drawings.
D) design development.
سؤال
The section of specific furniture, fabrics, and finishes occurs during which phase?

A) programming
B) conceptual design
C) design development
D) contract documentation
سؤال
The presentation of a series of boards and visual drawings of the desired space occurs in which phase?

A) programming
B) conceptual design
C) design development
D) contract documentation
سؤال
Visual Communications involves which of the following?

A) perspectives, elevations, floor plans
B) CAD drawings, elevations, design concepts
C) models, elevations, specifications
D) working drawings, elevations, contracts
سؤال
Writing purchase orders or developing a spec book is completed during which phase?

A) schematic design
B) conceptual design
C) contract documentation
D) contract administration
سؤال
Detailed plans, elevations, and sections are all part of the

A) construction package.
B) written specifications.
C) furniture, finish, and equipment package.
D) construction drawings.
سؤال
Overseeing the actual work of the painter and carpet layer occurs during

A) schematic design.
B) conceptual design.
C) contract documentation.
D) contract administration.
سؤال
The best definition of the punch list is

A) a list (developed at the end of contract administration) of all items not yet finished on the job.
B) a list shared with the contractors indicating items to be "punched" or placed into walls such as light switches.
C) a list (developed during post-occupancy evaluation) that defines problems with the design.
D) a list of all the ingredients to be added to the holiday punch bowl.
سؤال
Identify the following:
-ASID or IIDA or IDC
سؤال
Identify the following:
-NCIDQ
سؤال
List and describe the three goals of interior design.
سؤال
Discuss discernment.
سؤال
List and describe two Allied Professions.
سؤال
Identify (3) areas of design specialties.
سؤال
Explain the differences between an interior decorator and an interior designer.
سؤال
Why is the design process cyclical?
سؤال
What does a design concept statement do?
سؤال
What is the difference between conceptual design and design development?
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/25
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 1: Understanding Interior Design
1
Interior design integrates the seemingly opposite disciplines of

A) art and science.
B) art and philosophy.
C) the physical and the psychological.
D) art and space.
art and science.
2
The concept of universal design requires projects to

A) universally meet cross-cultural needs.
B) adapt to those with temporary disabilities regardless of culture.
C) integrate the needs of a variety of clients.
D) meet the diverse needs of clients regardless of age and abilities.
meet the diverse needs of clients regardless of age and abilities.
3
A project incorporating green design solutions would

A) involve the use of environmentally sustainable products.
B) involve the use of products made from the environment.
C) involve the use of products made from plants.
D) involve the use of organic design solutions.
involve the use of environmentally sustainable products.
4
Which of the following is NOT a criterion for good design?

A) designing to meet the human factor.
B) current fashion trends.
C) integrity.
D) simplicity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
5
Through _______the designer focuses on gathering information. Once this information is established it is_________ into a design solution.

A) synthesis: analyzed
B) the initial client contact; configured
C) programming; synthesized
D) analysis; synthesized
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
6
The information gathering phase is called

A) initial client contact.
B) programming.
C) analysis.
D) schematic design.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
7
Design decisions involving broad-based concepts including the character, function, and aesthetics of the space describe which phase of design?

A) programming
B) conceptual design
C) design development
D) design concept
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
8
The use of bubble diagrams, matrices, and blocking diagrams are all part of

A) programming.
B) space planning.
C) working drawings.
D) design development.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
9
The section of specific furniture, fabrics, and finishes occurs during which phase?

A) programming
B) conceptual design
C) design development
D) contract documentation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
10
The presentation of a series of boards and visual drawings of the desired space occurs in which phase?

A) programming
B) conceptual design
C) design development
D) contract documentation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
11
Visual Communications involves which of the following?

A) perspectives, elevations, floor plans
B) CAD drawings, elevations, design concepts
C) models, elevations, specifications
D) working drawings, elevations, contracts
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
12
Writing purchase orders or developing a spec book is completed during which phase?

A) schematic design
B) conceptual design
C) contract documentation
D) contract administration
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
13
Detailed plans, elevations, and sections are all part of the

A) construction package.
B) written specifications.
C) furniture, finish, and equipment package.
D) construction drawings.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
14
Overseeing the actual work of the painter and carpet layer occurs during

A) schematic design.
B) conceptual design.
C) contract documentation.
D) contract administration.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
15
The best definition of the punch list is

A) a list (developed at the end of contract administration) of all items not yet finished on the job.
B) a list shared with the contractors indicating items to be "punched" or placed into walls such as light switches.
C) a list (developed during post-occupancy evaluation) that defines problems with the design.
D) a list of all the ingredients to be added to the holiday punch bowl.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
16
Identify the following:
-ASID or IIDA or IDC
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
17
Identify the following:
-NCIDQ
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
18
List and describe the three goals of interior design.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
19
Discuss discernment.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
20
List and describe two Allied Professions.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
21
Identify (3) areas of design specialties.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
22
Explain the differences between an interior decorator and an interior designer.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
23
Why is the design process cyclical?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
24
What does a design concept statement do?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
25
What is the difference between conceptual design and design development?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 25 في هذه المجموعة.