Deck 12: Designing and Building the Data Warehouse

ملء الشاشة (f)
exit full mode
سؤال
The first step in planning a data warehouse is to define the information requirements of the organization.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
The enterprise model consists of a number of separate models integrated together to provide a comprehensive view of the organization.
سؤال
The corporate process model describes the entities generated by the elementary processes carried out by the enterprise.
سؤال
The corporate data model represents a highly structured description of the elementary processes within the enterprise that identify the interrelationships among the different processes.
سؤال
The long term benefit of an enterprise data warehouse is the increased integration of business processes throughout the organization.
سؤال
A top-down data warehouse design focuses on making use of data available in the current operational systems.
سؤال
A bottom-up approach to data warehouse brings more benefit to a data warehouse project than a top-down approach.
سؤال
Horizontal integration is the means by which the application designer ensures that the software application is congruent with the stated business requirements.
سؤال
Enterprise integration ensures that each application is fully integrated within its own boundaries.
سؤال
Vertical integration ensures that consistent data definitions occur across the entire organization.
سؤال
One of the most significant data warehouse critical success factors is strong management support.
سؤال
Organizational culture can have an impact on their readiness to develop a data warehouse because data warehouse development implies cross departmental cooperation and information sharing.
سؤال
One common approach to data warehouse project prioritization is to rank initiatives by impact on the information technology organization.
سؤال
One low cost approach to determining data warehouse feasibility is to develop a proof of concept.
سؤال
When the initial scope of a project continues to expand to incorporate new features this is referred to as feature expansion.
سؤال
The first step in developing a data warehouse is to determine the project scope.
سؤال
A project benefit that can be identified with certainty and expressed in dollars is said to be an intangible benefit.
سؤال
The ability to introduce new products would be considered an intangible project benefit.
سؤال
The ability to be proactive in identifying legal issues, thereby foregoing potential financial penalties that might impact a firm would be considered an intangible project benefit.
سؤال
Economic feasibility measures share one concept in common - the time value of money.
سؤال
Which of the following data warehouse design approaches implies a strategic rather than operational perspective?

A) Bottom-up approach
B) Top-down approach
C) Central approach
D) None of the above.
سؤال
When the application designer ensures that the software application is in harmony with the business requirements, this is referred to as:

A) horizontal integration.
B) vertical integration.
C) enterprise integration.
D) None of the above.
سؤال
_________ seeks to ensure that each application under development is fully integrated within its own boundaries and to eliminate any inconsistencies in the final software product.

A) Horizontal integration
B) Vertical integration
C) Enterprise integration
D) None of the above.
سؤال
__________ ensures that there is consistent definition of data and processes across the organization.

A) Horizontal integration
B) Vertical integration
C) Enterprise integration
D) None of the above.
سؤال
Which of the following is not a data warehouse project readiness assessment factor?

A) Strong sponsorship
B) A compelling business motivation
C) An analytic organizational culture
D) All of the above are factors.
سؤال
Which of the following is considered a key question to the success of a data warehouse initiative?

A) What are the key performance indicators used for each of the key business initiatives?
B) What is the potential impact on each of the existing performance metrics with improved access to higher-quality business process information?
C) What does management consider to be the key strategic business initiatives?
D) All of the above.
سؤال
Which of the following is considered to be a project prioritization dimension?

A) Perceived impact on the core business
B) Economic impact on the IT organization
C) Feasibility of staffing the project internally
D) All of the above.
سؤال
Which term refers to the process of developing a relatively low cost prototype to demonstrate that a data warehouse will achieve the perceived benefits?

A) Proof of prototype
B) Proof of concept
C) Proof of benefit
D) None of the above.
سؤال
__________ occurs when the initial scope of a project continues to expand as new features are incorporated into the project.

A) Feature creep
B) Hope creep
C) Scope creep
D) None of the above.
سؤال
Which of the following refers to a perspective from which an argument to pursue an investment can be made?

A) Faith
B) Fear
C) Facts
D) All of the above.
سؤال
Despite increased spending in information technology productivity growth in the U.S. has been stagnant or weak. This phenomenon is referred to as:

A) technology paradox.
B) productivity paradox.
C) productivity paradigm.
D) technology paradigm.
سؤال
A(n) ________ benefit can be identified with certainty and is easily expressed in dollars.

A) intangible
B) tangible
C) enterprise
D) None of the above.
سؤال
A(n) _________ benefit can be directly associated with a project but is not easily expressed in dollars.

A) intangible
B) tangible
C) enterprise
D) None of the above.
سؤال
Which of the following is not a tangible benefit?

A) Increase in process quality
B) Reduction in employee turnover
C) Improving time to market
D) Decreased need for travel
سؤال
Which of the following is not an intangible benefit?

A) Development of new markets
B) Increased competitive advantage
C) More timely information
D) Increased workplace safety
سؤال
Which of the following is an economic feasibility measure?

A) Net present value
B) Breakeven analysis
C) Internal rate of return
D) All of the above.
سؤال
Which economic feasibility measure results in a return on investment expressed as an interest rate?

A) Net present value
B) Breakeven analysis
C) Internal rate of return
D) All of the above.
سؤال
____________ determines the point where the benefits of a project equal its costs.

A) Net present value
B) Breakeven analysis
C) Internal rate of return
D) All of the above.
سؤال
Joining a fact table to dimension tables in a star schema is referred to as a:

A) star join.
B) data mart.
C) fact analysis.
D) dimensional warehouse.
سؤال
___________ determines exactly what constitutes a fact record.

A) Star schema
B) Degree of granularity
C) Data mart analysis
D) None of the above.
سؤال
Define three levels of enterprise integration.
سؤال
What are the benefits realized through a sound data warehouse architecture?
سؤال
List the guidelines for a successful data warehouse project.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/43
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 12: Designing and Building the Data Warehouse
1
The first step in planning a data warehouse is to define the information requirements of the organization.
True
2
The enterprise model consists of a number of separate models integrated together to provide a comprehensive view of the organization.
True
3
The corporate process model describes the entities generated by the elementary processes carried out by the enterprise.
False
4
The corporate data model represents a highly structured description of the elementary processes within the enterprise that identify the interrelationships among the different processes.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 43 في هذه المجموعة.
فتح الحزمة
k this deck
5
The long term benefit of an enterprise data warehouse is the increased integration of business processes throughout the organization.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 43 في هذه المجموعة.
فتح الحزمة
k this deck
6
A top-down data warehouse design focuses on making use of data available in the current operational systems.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 43 في هذه المجموعة.
فتح الحزمة
k this deck
7
A bottom-up approach to data warehouse brings more benefit to a data warehouse project than a top-down approach.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 43 في هذه المجموعة.
فتح الحزمة
k this deck
8
Horizontal integration is the means by which the application designer ensures that the software application is congruent with the stated business requirements.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 43 في هذه المجموعة.
فتح الحزمة
k this deck
9
Enterprise integration ensures that each application is fully integrated within its own boundaries.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 43 في هذه المجموعة.
فتح الحزمة
k this deck
10
Vertical integration ensures that consistent data definitions occur across the entire organization.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 43 في هذه المجموعة.
فتح الحزمة
k this deck
11
One of the most significant data warehouse critical success factors is strong management support.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 43 في هذه المجموعة.
فتح الحزمة
k this deck
12
Organizational culture can have an impact on their readiness to develop a data warehouse because data warehouse development implies cross departmental cooperation and information sharing.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 43 في هذه المجموعة.
فتح الحزمة
k this deck
13
One common approach to data warehouse project prioritization is to rank initiatives by impact on the information technology organization.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 43 في هذه المجموعة.
فتح الحزمة
k this deck
14
One low cost approach to determining data warehouse feasibility is to develop a proof of concept.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 43 في هذه المجموعة.
فتح الحزمة
k this deck
15
When the initial scope of a project continues to expand to incorporate new features this is referred to as feature expansion.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 43 في هذه المجموعة.
فتح الحزمة
k this deck
16
The first step in developing a data warehouse is to determine the project scope.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 43 في هذه المجموعة.
فتح الحزمة
k this deck
17
A project benefit that can be identified with certainty and expressed in dollars is said to be an intangible benefit.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 43 في هذه المجموعة.
فتح الحزمة
k this deck
18
The ability to introduce new products would be considered an intangible project benefit.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 43 في هذه المجموعة.
فتح الحزمة
k this deck
19
The ability to be proactive in identifying legal issues, thereby foregoing potential financial penalties that might impact a firm would be considered an intangible project benefit.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 43 في هذه المجموعة.
فتح الحزمة
k this deck
20
Economic feasibility measures share one concept in common - the time value of money.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 43 في هذه المجموعة.
فتح الحزمة
k this deck
21
Which of the following data warehouse design approaches implies a strategic rather than operational perspective?

A) Bottom-up approach
B) Top-down approach
C) Central approach
D) None of the above.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 43 في هذه المجموعة.
فتح الحزمة
k this deck
22
When the application designer ensures that the software application is in harmony with the business requirements, this is referred to as:

A) horizontal integration.
B) vertical integration.
C) enterprise integration.
D) None of the above.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 43 في هذه المجموعة.
فتح الحزمة
k this deck
23
_________ seeks to ensure that each application under development is fully integrated within its own boundaries and to eliminate any inconsistencies in the final software product.

A) Horizontal integration
B) Vertical integration
C) Enterprise integration
D) None of the above.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 43 في هذه المجموعة.
فتح الحزمة
k this deck
24
__________ ensures that there is consistent definition of data and processes across the organization.

A) Horizontal integration
B) Vertical integration
C) Enterprise integration
D) None of the above.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 43 في هذه المجموعة.
فتح الحزمة
k this deck
25
Which of the following is not a data warehouse project readiness assessment factor?

A) Strong sponsorship
B) A compelling business motivation
C) An analytic organizational culture
D) All of the above are factors.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 43 في هذه المجموعة.
فتح الحزمة
k this deck
26
Which of the following is considered a key question to the success of a data warehouse initiative?

A) What are the key performance indicators used for each of the key business initiatives?
B) What is the potential impact on each of the existing performance metrics with improved access to higher-quality business process information?
C) What does management consider to be the key strategic business initiatives?
D) All of the above.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 43 في هذه المجموعة.
فتح الحزمة
k this deck
27
Which of the following is considered to be a project prioritization dimension?

A) Perceived impact on the core business
B) Economic impact on the IT organization
C) Feasibility of staffing the project internally
D) All of the above.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 43 في هذه المجموعة.
فتح الحزمة
k this deck
28
Which term refers to the process of developing a relatively low cost prototype to demonstrate that a data warehouse will achieve the perceived benefits?

A) Proof of prototype
B) Proof of concept
C) Proof of benefit
D) None of the above.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 43 في هذه المجموعة.
فتح الحزمة
k this deck
29
__________ occurs when the initial scope of a project continues to expand as new features are incorporated into the project.

A) Feature creep
B) Hope creep
C) Scope creep
D) None of the above.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 43 في هذه المجموعة.
فتح الحزمة
k this deck
30
Which of the following refers to a perspective from which an argument to pursue an investment can be made?

A) Faith
B) Fear
C) Facts
D) All of the above.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 43 في هذه المجموعة.
فتح الحزمة
k this deck
31
Despite increased spending in information technology productivity growth in the U.S. has been stagnant or weak. This phenomenon is referred to as:

A) technology paradox.
B) productivity paradox.
C) productivity paradigm.
D) technology paradigm.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 43 في هذه المجموعة.
فتح الحزمة
k this deck
32
A(n) ________ benefit can be identified with certainty and is easily expressed in dollars.

A) intangible
B) tangible
C) enterprise
D) None of the above.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 43 في هذه المجموعة.
فتح الحزمة
k this deck
33
A(n) _________ benefit can be directly associated with a project but is not easily expressed in dollars.

A) intangible
B) tangible
C) enterprise
D) None of the above.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 43 في هذه المجموعة.
فتح الحزمة
k this deck
34
Which of the following is not a tangible benefit?

A) Increase in process quality
B) Reduction in employee turnover
C) Improving time to market
D) Decreased need for travel
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 43 في هذه المجموعة.
فتح الحزمة
k this deck
35
Which of the following is not an intangible benefit?

A) Development of new markets
B) Increased competitive advantage
C) More timely information
D) Increased workplace safety
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 43 في هذه المجموعة.
فتح الحزمة
k this deck
36
Which of the following is an economic feasibility measure?

A) Net present value
B) Breakeven analysis
C) Internal rate of return
D) All of the above.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 43 في هذه المجموعة.
فتح الحزمة
k this deck
37
Which economic feasibility measure results in a return on investment expressed as an interest rate?

A) Net present value
B) Breakeven analysis
C) Internal rate of return
D) All of the above.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 43 في هذه المجموعة.
فتح الحزمة
k this deck
38
____________ determines the point where the benefits of a project equal its costs.

A) Net present value
B) Breakeven analysis
C) Internal rate of return
D) All of the above.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 43 في هذه المجموعة.
فتح الحزمة
k this deck
39
Joining a fact table to dimension tables in a star schema is referred to as a:

A) star join.
B) data mart.
C) fact analysis.
D) dimensional warehouse.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 43 في هذه المجموعة.
فتح الحزمة
k this deck
40
___________ determines exactly what constitutes a fact record.

A) Star schema
B) Degree of granularity
C) Data mart analysis
D) None of the above.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 43 في هذه المجموعة.
فتح الحزمة
k this deck
41
Define three levels of enterprise integration.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 43 في هذه المجموعة.
فتح الحزمة
k this deck
42
What are the benefits realized through a sound data warehouse architecture?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 43 في هذه المجموعة.
فتح الحزمة
k this deck
43
List the guidelines for a successful data warehouse project.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 43 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 43 في هذه المجموعة.