Deck 11: Creating Information Systems

ملء الشاشة (f)
exit full mode
سؤال
We have identified three general approaches to the acquisition of information processing functionalities and the introduction of IT-based information systems. Which of the following is not one of them?

A) Custom design and development
B) System selection and acquisition
C) End-user development
D) Open source development
E) None of the above
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
What are the three steps that occur during the implementation phase of the SDLC?

A) Programming, Testing, Installation
B) Investigation, Installation, Operations
C) Programming, Installation, Maintenance
D) Installation, Operations, Maintenance
E) Investigation, Testing, Installation
سؤال
In which of the following phases should you expect to be most involved as a general or functional manager?

A) Definition
B) Build
C) Implementation
D) A and B
E) A and C
سؤال
In which phase(s) do the system development life cycle (SDLC) and the system selection process differ most substantially?

A) Definition
B) Build
C) Implementation
D) A and B
E) A and C
سؤال
The three generic phases of a system life-cycle process are:

A) Definition, Design, and Testing
B) Definition, Build, and Implementation
C) Planning, Testing, and Implementation
D) Build, Testing, and Deployment
E) None of the above
سؤال
Why is the Systems development Life Cycle methodology typically referred to as "the waterfall model"?

A) Because it was first popularized in a town with many waterfalls
B) To stress the fact that phases are sequential and iteration (or going back) should be avoided as much as possible.
C) Because the SDLC, like prototyping, is not iterative.
D) To convey the notion that getting good user requirements is important and there should be multiple opportunities to elicit user requirements.
E) B and D
سؤال
Your book describes the systems selection process in-depth. Which of the following is not a step in the system selection process

A) Compile an RFP
B) Develop a vendor short list.
C) Solicit proposals.
D) Visit vendor sites.
E) Have vendors provide demonstrations.
سؤال
Which of the following are not approaches to acquisition of information processing functionalities?

A) Custom Design
B) Custom Development
C) System Selection and Acquisition
D) End-user Development
E) Open Source Development
سؤال
Which of the following is not one of the advantages related to making your own systems?

A) Unique Tailoring
B) Flexibility
C) Control
D) Faster Roll-Out
E) All of these are advantages
سؤال
Which of the following is not one of the advantages related to purchasing an off-the-shelf system?

A) Unique Tailoring
B) Faster Roll-Out
C) Knowledge Infusion
D) Economical Attractiveness
E) High Quality
سؤال
The Systems Development Life Cycle has three main phases. These are:

A) Definition, System Design, and Implementation
B) Feasibility Analysis, Programming, and Implementation
C) Definition, Build, and Implementation
D) Investigation, Feasibility Analysis, and System Analysis
E) Installation, Operations, and Maintenance
سؤال
The IS department workers that experts in both technology and the business processes are called what?

A) Programmers
B) Analysts
C) Functional Managers
D) Help Desk Personnel
E) Technicians.
سؤال
Which stage of the SDLS typically results in a "go" or "no-go" decision?

A) Feasibility Analysis
B) Systems Analysis
C) System Design
D) Programming
E) Testing
سؤال
A bank upgrades a computer system at one of its branches. If this works correctly, then the upgraded system will be installed at the other branches. Which migration approach is this most likely related to?

A) Parallel
B) Direct
C) Phased
D) Pilot
E) Traditional
سؤال
A bank upgrades the computer systems of its branches, one branch at a time. This is most likely which of the following migration strategies?

A) Parallel
B) Direct
C) Phased
D) Pilot
E) Traditional
سؤال
The Build phase of the SDLC is used to ensure that the software is properly integrated with the other components of the information system.
سؤال
The SDLC and prototyping methodologies are one and the same.
سؤال
Both the SDLC and prototyping methodologies are use d to create custom systems.
سؤال
Off-the-shelf systems enable infusion of knowledge in the organization
سؤال
End-user development: The process by which an organization's non-IT specialists create software applications.
سؤال
Custom software development is a systems development approach predicated on the notion that it impossible to clearly estimate and plan in detail such complex endeavors as information systems design and development projects.
سؤال
A system analyst is a highly skilled IT professional who takes the system requirements document (i.e., what the applications should do) and designs the structure of the system (i.e., how the application will perform its tasks).
سؤال
What are two advantages to custom developing and designing a software application?
سؤال
Name two advantage to purchasing off-the-shelf software
سؤال
Name, in order, the principal phases of the SDLC
سؤال
Name and describe the four approaches to software installation
سؤال
Occasionally, _________ will be used within the SDLC as a way to elicit user requirements and seek input in the design of the user interface.
سؤال
When purchasing off-the-shelf applications, a selection process similar to the SLDC is used-the only difference being one additional phase in the process. What is the name of this phase and where does it occur in the process?
سؤال
List and describe two benefits of End-User development
سؤال
We have discussed the notion of "make and buy" as a new trend that challenges the traditional "make vs. buy" paradigm. Briefly explain what we have meant by "make and buy" and provide an example.
سؤال
List and describe two risks of End-user development. Make sure to include at least two examples of each.
سؤال
Feasibility analysis is required to justify IT investments. Along with user requirements this is where user-managers have the greatest input. Briefly describe the purposes of the technical feasibility analysis, the economic feasibility analysis, and the behavioral feasibility analysis.
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/32
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 11: Creating Information Systems
1
We have identified three general approaches to the acquisition of information processing functionalities and the introduction of IT-based information systems. Which of the following is not one of them?

A) Custom design and development
B) System selection and acquisition
C) End-user development
D) Open source development
E) None of the above
Open source development
2
What are the three steps that occur during the implementation phase of the SDLC?

A) Programming, Testing, Installation
B) Investigation, Installation, Operations
C) Programming, Installation, Maintenance
D) Installation, Operations, Maintenance
E) Investigation, Testing, Installation
Installation, Operations, Maintenance
3
In which of the following phases should you expect to be most involved as a general or functional manager?

A) Definition
B) Build
C) Implementation
D) A and B
E) A and C
A and C
4
In which phase(s) do the system development life cycle (SDLC) and the system selection process differ most substantially?

A) Definition
B) Build
C) Implementation
D) A and B
E) A and C
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 32 في هذه المجموعة.
فتح الحزمة
k this deck
5
The three generic phases of a system life-cycle process are:

A) Definition, Design, and Testing
B) Definition, Build, and Implementation
C) Planning, Testing, and Implementation
D) Build, Testing, and Deployment
E) None of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 32 في هذه المجموعة.
فتح الحزمة
k this deck
6
Why is the Systems development Life Cycle methodology typically referred to as "the waterfall model"?

A) Because it was first popularized in a town with many waterfalls
B) To stress the fact that phases are sequential and iteration (or going back) should be avoided as much as possible.
C) Because the SDLC, like prototyping, is not iterative.
D) To convey the notion that getting good user requirements is important and there should be multiple opportunities to elicit user requirements.
E) B and D
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 32 في هذه المجموعة.
فتح الحزمة
k this deck
7
Your book describes the systems selection process in-depth. Which of the following is not a step in the system selection process

A) Compile an RFP
B) Develop a vendor short list.
C) Solicit proposals.
D) Visit vendor sites.
E) Have vendors provide demonstrations.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 32 في هذه المجموعة.
فتح الحزمة
k this deck
8
Which of the following are not approaches to acquisition of information processing functionalities?

A) Custom Design
B) Custom Development
C) System Selection and Acquisition
D) End-user Development
E) Open Source Development
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 32 في هذه المجموعة.
فتح الحزمة
k this deck
9
Which of the following is not one of the advantages related to making your own systems?

A) Unique Tailoring
B) Flexibility
C) Control
D) Faster Roll-Out
E) All of these are advantages
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 32 في هذه المجموعة.
فتح الحزمة
k this deck
10
Which of the following is not one of the advantages related to purchasing an off-the-shelf system?

A) Unique Tailoring
B) Faster Roll-Out
C) Knowledge Infusion
D) Economical Attractiveness
E) High Quality
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 32 في هذه المجموعة.
فتح الحزمة
k this deck
11
The Systems Development Life Cycle has three main phases. These are:

A) Definition, System Design, and Implementation
B) Feasibility Analysis, Programming, and Implementation
C) Definition, Build, and Implementation
D) Investigation, Feasibility Analysis, and System Analysis
E) Installation, Operations, and Maintenance
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 32 في هذه المجموعة.
فتح الحزمة
k this deck
12
The IS department workers that experts in both technology and the business processes are called what?

A) Programmers
B) Analysts
C) Functional Managers
D) Help Desk Personnel
E) Technicians.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 32 في هذه المجموعة.
فتح الحزمة
k this deck
13
Which stage of the SDLS typically results in a "go" or "no-go" decision?

A) Feasibility Analysis
B) Systems Analysis
C) System Design
D) Programming
E) Testing
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 32 في هذه المجموعة.
فتح الحزمة
k this deck
14
A bank upgrades a computer system at one of its branches. If this works correctly, then the upgraded system will be installed at the other branches. Which migration approach is this most likely related to?

A) Parallel
B) Direct
C) Phased
D) Pilot
E) Traditional
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 32 في هذه المجموعة.
فتح الحزمة
k this deck
15
A bank upgrades the computer systems of its branches, one branch at a time. This is most likely which of the following migration strategies?

A) Parallel
B) Direct
C) Phased
D) Pilot
E) Traditional
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 32 في هذه المجموعة.
فتح الحزمة
k this deck
16
The Build phase of the SDLC is used to ensure that the software is properly integrated with the other components of the information system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 32 في هذه المجموعة.
فتح الحزمة
k this deck
17
The SDLC and prototyping methodologies are one and the same.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 32 في هذه المجموعة.
فتح الحزمة
k this deck
18
Both the SDLC and prototyping methodologies are use d to create custom systems.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 32 في هذه المجموعة.
فتح الحزمة
k this deck
19
Off-the-shelf systems enable infusion of knowledge in the organization
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 32 في هذه المجموعة.
فتح الحزمة
k this deck
20
End-user development: The process by which an organization's non-IT specialists create software applications.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 32 في هذه المجموعة.
فتح الحزمة
k this deck
21
Custom software development is a systems development approach predicated on the notion that it impossible to clearly estimate and plan in detail such complex endeavors as information systems design and development projects.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 32 في هذه المجموعة.
فتح الحزمة
k this deck
22
A system analyst is a highly skilled IT professional who takes the system requirements document (i.e., what the applications should do) and designs the structure of the system (i.e., how the application will perform its tasks).
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 32 في هذه المجموعة.
فتح الحزمة
k this deck
23
What are two advantages to custom developing and designing a software application?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 32 في هذه المجموعة.
فتح الحزمة
k this deck
24
Name two advantage to purchasing off-the-shelf software
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 32 في هذه المجموعة.
فتح الحزمة
k this deck
25
Name, in order, the principal phases of the SDLC
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 32 في هذه المجموعة.
فتح الحزمة
k this deck
26
Name and describe the four approaches to software installation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 32 في هذه المجموعة.
فتح الحزمة
k this deck
27
Occasionally, _________ will be used within the SDLC as a way to elicit user requirements and seek input in the design of the user interface.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 32 في هذه المجموعة.
فتح الحزمة
k this deck
28
When purchasing off-the-shelf applications, a selection process similar to the SLDC is used-the only difference being one additional phase in the process. What is the name of this phase and where does it occur in the process?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 32 في هذه المجموعة.
فتح الحزمة
k this deck
29
List and describe two benefits of End-User development
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 32 في هذه المجموعة.
فتح الحزمة
k this deck
30
We have discussed the notion of "make and buy" as a new trend that challenges the traditional "make vs. buy" paradigm. Briefly explain what we have meant by "make and buy" and provide an example.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 32 في هذه المجموعة.
فتح الحزمة
k this deck
31
List and describe two risks of End-user development. Make sure to include at least two examples of each.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 32 في هذه المجموعة.
فتح الحزمة
k this deck
32
Feasibility analysis is required to justify IT investments. Along with user requirements this is where user-managers have the greatest input. Briefly describe the purposes of the technical feasibility analysis, the economic feasibility analysis, and the behavioral feasibility analysis.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 32 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 32 في هذه المجموعة.