Deck 15: Constraint Management: Simplifying Complex Systems

ملء الشاشة (f)
exit full mode
سؤال
A system's constraint could be a resource, a policy, an input to the system, or some external force.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Activation of a resource means that the resource will contribute to the goals of the system.
سؤال
Increasing the capacity of a nonconstraint is a frequent result of capital investment decisions that seek to automate processes
سؤال
The constraint management definition for inventory includes money invested in facilities and equipment.
سؤال
Constraint management eliminates the emphasis on global measures that aren't consistent with enterprise goals.
سؤال
Nonconstraints must be utilized at 100% to maximize system productivity.
سؤال
Disruptions to systems can generally be measured by their duration.
سؤال
The sizing of time buffers should be based on the length of disruptions.
سؤال
The production batch size for a constraint should be as small as possible.
سؤال
Constraint management provides long term solutions to business problems.
سؤال
A constraint

A) Is defined as anything that inhibits a system's progress towards its goals.
B) Could be a resource, a policy, or a disruption.
C) Can be optimized by maximizing the utilization of nonconstraints.
D) Are always resources used in the production process.
سؤال
The global performance measures that constraint management decisions depend on are:

A) Inventory, throughput, operating expense
B) Profit margin, return on investment, return on equity
C) Profit margin, return on assets, return on equity
D) Inventory turns, utilization, efficiency
سؤال
Which of the following statements is true about global performance measures?

A) Constraint management seeks to improve performance on three global performance measures.
B) The constraint management definition of inventory does not include facilities and equipment.
C) The constraint management definition of throughput focuses on production, not sales.
D) The constraint management definition of utilization is time used divided by time available.
سؤال
Which of the following is not a step in the constraint management focusing process?

A) Identify the constraint
B) Elevation
C) Exploitation
D) Interpretation
سؤال
A financial investment to increase the availability of the constraint is part of:

A) Exploitation
B) Elevation
C) Identification
D) Standardization
E) Subordination
سؤال
Which of the following is a focusing process step that will increase throughput?

A) Exploitation
B) Identification
C) Standardization
D) Planning
سؤال
Disruptions in productive systems

A) Can only be caused by defects
B) Can always be eliminated
C) Can be caused by random fluctuation.
D) Originating inside the system are the only ones of concern in constraint management
سؤال
Which of the following statements is true about protecting the system from disruptions?

A) Nonconstraints cannot experience disruptions without reducing system output.
B) The approach constraint management uses to protect constrained resources from disruption is to . decouple them from the rest of the system with buffers.
C) All disruptions will have an impact on system throughput.
D) Disruptions on nonconstraint resources will not affect system throughput
سؤال
A constraint buffer is a particular type of:

A) Time buffer
B) Shipping buffer
C) Inventory buffer
D) Assembly buffer
E) Transfer buffer
سؤال
Which of the following statements is true of a constraint buffer?

A) A constraint buffer is used to decouple the constrained resource from being directly dependent on the
Work centers that supply it.
B) The most critical decision regarding a constraint buffer is determining its duration.
C) The determination of the size of a constraint buffer is a random process.
D) A constraint buffer's size is determined by the production batch size of the resource feeding it.
سؤال
The buffer used to ensure that components that have been through constrained resources will be on time for assembly is referred to as a:

A) A time buffer
B) A shipping buffer
C) An inventory buffer
D) An assembly buffer
E) A transfer buffer
سؤال
Which of the following statements is true about constraint management and batch sizes?

A) Constraint management recognizes that there are two distinct types of inventory batches.
B) For a nonconstraint, increasing the production batch size increases its utilization, and is actually a form of exploitation.
C) For constraints, smaller production batch sizes are more desirable.
D) For constraints, transfer batch sizes should be minimized.
سؤال
Which of the following statements is true about lean systems and constraint management?

A) The lean system and constraint management frameworks conflict, and despite similarities, cannot be used simultaneously.
B) Kanban systems provide buffers in the same places as those used by constraint management.
C) In constraint management, if all internal constraints were eliminated, there will be no shipping buffer.
D) The kanban system and constraint management rely on inventory buffers.
سؤال
Identifying ways to use a constrained resource better is a process called

A) Identification
B) Subordination
C) Exploitation
D) Elevation
سؤال
The consideration of the impact a decision would have on exploitation is known as

A) Identification
B) Subordination
C) Exploitation
D) Elevation
سؤال
The phenomenon of increasing impact from statistical fluctuation in production systems is recognized as

A) The bullwhip effect
B) Statistical fluctuation among dependent events
C) Subordination of disruptions
D) Buffer management
سؤال
The impact on production lead time of an 8-hour constraint buffer:

A) Would be an additional 8 hours of production lead time inserted into the schedule.
B) Would depend on how full the constraint buffer was.
C) Would depend on whether or not the buffer decoupled the constraint from all disruptions.
D) Would be to remove 8 hours from the backward scheduling process.
سؤال
Disruptions that occur after the constraint

A) Cannot be stopped from making orders late.
B) Do not reduce system throughput or due date performance.
C) Can be eliminated through exploitation
D) Are the reason a shipping buffer is used.
سؤال
When exploiting a constraint through the determination of the best product mix, the most profitable product

A) Has the lowest production cost
B) Has the highest contribution margin
C) Has the highest dollar return per constraint minute
D) Has the highest selling price
سؤال
In a constraint management context, ________ contributes to the goals of the system while ________doesn't contribute to the system's goals.
سؤال
Constraint management decisions depend on the following three global measures _________,___________, and __________.
سؤال
Traditional inventory definitions do not include ________ and _______,
سؤال
The constraint management focus on _______ ______ provides a more consistent link between day-to-day decisions and the broad performance of the firm.
سؤال
The exploitation of a policy constraint requires that the policy be ______ or _____ so that it no longer poses a constraint.
سؤال
Exploiting and/or elevating a constraint increases ________.
سؤال
_______ _______ is present within business processes and the amount of time it takes to complete a process.
سؤال
The approach constraint management uses to protect constrained resources from disruptions is to _____them from the rest of the system with ____.
سؤال
For a _______, larger production batch sizes are more desirable, while for ________, smaller production batch sizes are more desirable.
سؤال
Constraint management has attracted numerous advocates because of its almost immediate impact on_____ _____ and _____.
سؤال
Match these items.

-Shipping buffer

A) Ensures that components that have been through constrained resources are not delayed
B) Decouples the constrained resources from being directly dependent on the work center
C) Increasing the capacity of the constrained resource
D) Inventory
E) Policy
F) Doesn't contribute to system's goals
G) Modifying resource constraints
H) Contributes to the goals of the system
I) Maximizing throughput through the management of system constraints
J) Protecting orders after the final processing step
سؤال
Match these items.

-Assembly buffer

A) Ensures that components that have been through constrained resources are not delayed
B) Decouples the constrained resources from being directly dependent on the work center
C) Increasing the capacity of the constrained resource
D) Inventory
E) Policy
F) Doesn't contribute to system's goals
G) Modifying resource constraints
H) Contributes to the goals of the system
I) Maximizing throughput through the management of system constraints
J) Protecting orders after the final processing step
سؤال
Match these items.

-Utilization

A) Ensures that components that have been through constrained resources are not delayed
B) Decouples the constrained resources from being directly dependent on the work center
C) Increasing the capacity of the constrained resource
D) Inventory
E) Policy
F) Doesn't contribute to system's goals
G) Modifying resource constraints
H) Contributes to the goals of the system
I) Maximizing throughput through the management of system constraints
J) Protecting orders after the final processing step
سؤال
Match these items.

-Exploitation

A) Ensures that components that have been through constrained resources are not delayed
B) Decouples the constrained resources from being directly dependent on the work center
C) Increasing the capacity of the constrained resource
D) Inventory
E) Policy
F) Doesn't contribute to system's goals
G) Modifying resource constraints
H) Contributes to the goals of the system
I) Maximizing throughput through the management of system constraints
J) Protecting orders after the final processing step
سؤال
Match these items.

-Constraint Management

A) Ensures that components that have been through constrained resources are not delayed
B) Decouples the constrained resources from being directly dependent on the work center
C) Increasing the capacity of the constrained resource
D) Inventory
E) Policy
F) Doesn't contribute to system's goals
G) Modifying resource constraints
H) Contributes to the goals of the system
I) Maximizing throughput through the management of system constraints
J) Protecting orders after the final processing step
سؤال
Match these items.

-Elevation

A) Ensures that components that have been through constrained resources are not delayed
B) Decouples the constrained resources from being directly dependent on the work center
C) Increasing the capacity of the constrained resource
D) Inventory
E) Policy
F) Doesn't contribute to system's goals
G) Modifying resource constraints
H) Contributes to the goals of the system
I) Maximizing throughput through the management of system constraints
J) Protecting orders after the final processing step
سؤال
Match these items.

-Time buffer

A) Ensures that components that have been through constrained resources are not delayed
B) Decouples the constrained resources from being directly dependent on the work center
C) Increasing the capacity of the constrained resource
D) Inventory
E) Policy
F) Doesn't contribute to system's goals
G) Modifying resource constraints
H) Contributes to the goals of the system
I) Maximizing throughput through the management of system constraints
J) Protecting orders after the final processing step
سؤال
Match these items.

-System's constraint

A) Ensures that components that have been through constrained resources are not delayed
B) Decouples the constrained resources from being directly dependent on the work center
C) Increasing the capacity of the constrained resource
D) Inventory
E) Policy
F) Doesn't contribute to system's goals
G) Modifying resource constraints
H) Contributes to the goals of the system
I) Maximizing throughput through the management of system constraints
J) Protecting orders after the final processing step
سؤال
Match these items.

-Global measure

A) Ensures that components that have been through constrained resources are not delayed
B) Decouples the constrained resources from being directly dependent on the work center
C) Increasing the capacity of the constrained resource
D) Inventory
E) Policy
F) Doesn't contribute to system's goals
G) Modifying resource constraints
H) Contributes to the goals of the system
I) Maximizing throughput through the management of system constraints
J) Protecting orders after the final processing step
سؤال
Match these items.

-Activation

A) Ensures that components that have been through constrained resources are not delayed
B) Decouples the constrained resources from being directly dependent on the work center
C) Increasing the capacity of the constrained resource
D) Inventory
E) Policy
F) Doesn't contribute to system's goals
G) Modifying resource constraints
H) Contributes to the goals of the system
I) Maximizing throughput through the management of system constraints
J) Protecting orders after the final processing step
سؤال
Currently the major bottlenecks at a manufacturing plant that makes electric fixtures are the paint line and the 300-ton press that stamp out sheet metal parts. Hundreds of different kinds of parts must pass through the processes, and many jobs get stalled in queues before one or both of these processes. What kind of solutions would you recommend the management use in order to solve the above problem if Constraint Management were employed?
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/50
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 15: Constraint Management: Simplifying Complex Systems
1
A system's constraint could be a resource, a policy, an input to the system, or some external force.
True
2
Activation of a resource means that the resource will contribute to the goals of the system.
False
3
Increasing the capacity of a nonconstraint is a frequent result of capital investment decisions that seek to automate processes
True
4
The constraint management definition for inventory includes money invested in facilities and equipment.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
5
Constraint management eliminates the emphasis on global measures that aren't consistent with enterprise goals.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
6
Nonconstraints must be utilized at 100% to maximize system productivity.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
7
Disruptions to systems can generally be measured by their duration.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
8
The sizing of time buffers should be based on the length of disruptions.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
9
The production batch size for a constraint should be as small as possible.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
10
Constraint management provides long term solutions to business problems.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
11
A constraint

A) Is defined as anything that inhibits a system's progress towards its goals.
B) Could be a resource, a policy, or a disruption.
C) Can be optimized by maximizing the utilization of nonconstraints.
D) Are always resources used in the production process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
12
The global performance measures that constraint management decisions depend on are:

A) Inventory, throughput, operating expense
B) Profit margin, return on investment, return on equity
C) Profit margin, return on assets, return on equity
D) Inventory turns, utilization, efficiency
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
13
Which of the following statements is true about global performance measures?

A) Constraint management seeks to improve performance on three global performance measures.
B) The constraint management definition of inventory does not include facilities and equipment.
C) The constraint management definition of throughput focuses on production, not sales.
D) The constraint management definition of utilization is time used divided by time available.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
14
Which of the following is not a step in the constraint management focusing process?

A) Identify the constraint
B) Elevation
C) Exploitation
D) Interpretation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
15
A financial investment to increase the availability of the constraint is part of:

A) Exploitation
B) Elevation
C) Identification
D) Standardization
E) Subordination
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
16
Which of the following is a focusing process step that will increase throughput?

A) Exploitation
B) Identification
C) Standardization
D) Planning
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
17
Disruptions in productive systems

A) Can only be caused by defects
B) Can always be eliminated
C) Can be caused by random fluctuation.
D) Originating inside the system are the only ones of concern in constraint management
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
18
Which of the following statements is true about protecting the system from disruptions?

A) Nonconstraints cannot experience disruptions without reducing system output.
B) The approach constraint management uses to protect constrained resources from disruption is to . decouple them from the rest of the system with buffers.
C) All disruptions will have an impact on system throughput.
D) Disruptions on nonconstraint resources will not affect system throughput
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
19
A constraint buffer is a particular type of:

A) Time buffer
B) Shipping buffer
C) Inventory buffer
D) Assembly buffer
E) Transfer buffer
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
20
Which of the following statements is true of a constraint buffer?

A) A constraint buffer is used to decouple the constrained resource from being directly dependent on the
Work centers that supply it.
B) The most critical decision regarding a constraint buffer is determining its duration.
C) The determination of the size of a constraint buffer is a random process.
D) A constraint buffer's size is determined by the production batch size of the resource feeding it.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
21
The buffer used to ensure that components that have been through constrained resources will be on time for assembly is referred to as a:

A) A time buffer
B) A shipping buffer
C) An inventory buffer
D) An assembly buffer
E) A transfer buffer
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
22
Which of the following statements is true about constraint management and batch sizes?

A) Constraint management recognizes that there are two distinct types of inventory batches.
B) For a nonconstraint, increasing the production batch size increases its utilization, and is actually a form of exploitation.
C) For constraints, smaller production batch sizes are more desirable.
D) For constraints, transfer batch sizes should be minimized.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
23
Which of the following statements is true about lean systems and constraint management?

A) The lean system and constraint management frameworks conflict, and despite similarities, cannot be used simultaneously.
B) Kanban systems provide buffers in the same places as those used by constraint management.
C) In constraint management, if all internal constraints were eliminated, there will be no shipping buffer.
D) The kanban system and constraint management rely on inventory buffers.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
24
Identifying ways to use a constrained resource better is a process called

A) Identification
B) Subordination
C) Exploitation
D) Elevation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
25
The consideration of the impact a decision would have on exploitation is known as

A) Identification
B) Subordination
C) Exploitation
D) Elevation
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
26
The phenomenon of increasing impact from statistical fluctuation in production systems is recognized as

A) The bullwhip effect
B) Statistical fluctuation among dependent events
C) Subordination of disruptions
D) Buffer management
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
27
The impact on production lead time of an 8-hour constraint buffer:

A) Would be an additional 8 hours of production lead time inserted into the schedule.
B) Would depend on how full the constraint buffer was.
C) Would depend on whether or not the buffer decoupled the constraint from all disruptions.
D) Would be to remove 8 hours from the backward scheduling process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
28
Disruptions that occur after the constraint

A) Cannot be stopped from making orders late.
B) Do not reduce system throughput or due date performance.
C) Can be eliminated through exploitation
D) Are the reason a shipping buffer is used.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
29
When exploiting a constraint through the determination of the best product mix, the most profitable product

A) Has the lowest production cost
B) Has the highest contribution margin
C) Has the highest dollar return per constraint minute
D) Has the highest selling price
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
30
In a constraint management context, ________ contributes to the goals of the system while ________doesn't contribute to the system's goals.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
31
Constraint management decisions depend on the following three global measures _________,___________, and __________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
32
Traditional inventory definitions do not include ________ and _______,
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
33
The constraint management focus on _______ ______ provides a more consistent link between day-to-day decisions and the broad performance of the firm.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
34
The exploitation of a policy constraint requires that the policy be ______ or _____ so that it no longer poses a constraint.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
35
Exploiting and/or elevating a constraint increases ________.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
36
_______ _______ is present within business processes and the amount of time it takes to complete a process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
37
The approach constraint management uses to protect constrained resources from disruptions is to _____them from the rest of the system with ____.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
38
For a _______, larger production batch sizes are more desirable, while for ________, smaller production batch sizes are more desirable.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
39
Constraint management has attracted numerous advocates because of its almost immediate impact on_____ _____ and _____.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
40
Match these items.

-Shipping buffer

A) Ensures that components that have been through constrained resources are not delayed
B) Decouples the constrained resources from being directly dependent on the work center
C) Increasing the capacity of the constrained resource
D) Inventory
E) Policy
F) Doesn't contribute to system's goals
G) Modifying resource constraints
H) Contributes to the goals of the system
I) Maximizing throughput through the management of system constraints
J) Protecting orders after the final processing step
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
41
Match these items.

-Assembly buffer

A) Ensures that components that have been through constrained resources are not delayed
B) Decouples the constrained resources from being directly dependent on the work center
C) Increasing the capacity of the constrained resource
D) Inventory
E) Policy
F) Doesn't contribute to system's goals
G) Modifying resource constraints
H) Contributes to the goals of the system
I) Maximizing throughput through the management of system constraints
J) Protecting orders after the final processing step
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
42
Match these items.

-Utilization

A) Ensures that components that have been through constrained resources are not delayed
B) Decouples the constrained resources from being directly dependent on the work center
C) Increasing the capacity of the constrained resource
D) Inventory
E) Policy
F) Doesn't contribute to system's goals
G) Modifying resource constraints
H) Contributes to the goals of the system
I) Maximizing throughput through the management of system constraints
J) Protecting orders after the final processing step
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
43
Match these items.

-Exploitation

A) Ensures that components that have been through constrained resources are not delayed
B) Decouples the constrained resources from being directly dependent on the work center
C) Increasing the capacity of the constrained resource
D) Inventory
E) Policy
F) Doesn't contribute to system's goals
G) Modifying resource constraints
H) Contributes to the goals of the system
I) Maximizing throughput through the management of system constraints
J) Protecting orders after the final processing step
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
44
Match these items.

-Constraint Management

A) Ensures that components that have been through constrained resources are not delayed
B) Decouples the constrained resources from being directly dependent on the work center
C) Increasing the capacity of the constrained resource
D) Inventory
E) Policy
F) Doesn't contribute to system's goals
G) Modifying resource constraints
H) Contributes to the goals of the system
I) Maximizing throughput through the management of system constraints
J) Protecting orders after the final processing step
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
45
Match these items.

-Elevation

A) Ensures that components that have been through constrained resources are not delayed
B) Decouples the constrained resources from being directly dependent on the work center
C) Increasing the capacity of the constrained resource
D) Inventory
E) Policy
F) Doesn't contribute to system's goals
G) Modifying resource constraints
H) Contributes to the goals of the system
I) Maximizing throughput through the management of system constraints
J) Protecting orders after the final processing step
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
46
Match these items.

-Time buffer

A) Ensures that components that have been through constrained resources are not delayed
B) Decouples the constrained resources from being directly dependent on the work center
C) Increasing the capacity of the constrained resource
D) Inventory
E) Policy
F) Doesn't contribute to system's goals
G) Modifying resource constraints
H) Contributes to the goals of the system
I) Maximizing throughput through the management of system constraints
J) Protecting orders after the final processing step
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
47
Match these items.

-System's constraint

A) Ensures that components that have been through constrained resources are not delayed
B) Decouples the constrained resources from being directly dependent on the work center
C) Increasing the capacity of the constrained resource
D) Inventory
E) Policy
F) Doesn't contribute to system's goals
G) Modifying resource constraints
H) Contributes to the goals of the system
I) Maximizing throughput through the management of system constraints
J) Protecting orders after the final processing step
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
48
Match these items.

-Global measure

A) Ensures that components that have been through constrained resources are not delayed
B) Decouples the constrained resources from being directly dependent on the work center
C) Increasing the capacity of the constrained resource
D) Inventory
E) Policy
F) Doesn't contribute to system's goals
G) Modifying resource constraints
H) Contributes to the goals of the system
I) Maximizing throughput through the management of system constraints
J) Protecting orders after the final processing step
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
49
Match these items.

-Activation

A) Ensures that components that have been through constrained resources are not delayed
B) Decouples the constrained resources from being directly dependent on the work center
C) Increasing the capacity of the constrained resource
D) Inventory
E) Policy
F) Doesn't contribute to system's goals
G) Modifying resource constraints
H) Contributes to the goals of the system
I) Maximizing throughput through the management of system constraints
J) Protecting orders after the final processing step
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
50
Currently the major bottlenecks at a manufacturing plant that makes electric fixtures are the paint line and the 300-ton press that stamp out sheet metal parts. Hundreds of different kinds of parts must pass through the processes, and many jobs get stalled in queues before one or both of these processes. What kind of solutions would you recommend the management use in order to solve the above problem if Constraint Management were employed?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 50 في هذه المجموعة.