Deck 16: Operations Management

ملء الشاشة (f)
exit full mode
سؤال
The core business process of an organisation centres around:

A) operations resources.
B) organisations systems.
C) employees involved in the production.
D) all of the given answers.
E) none of the given answers.
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
An operations manager is NOT required in:

A) inventory control.
B) marketing.
C) food and beverage management.
D) quality assurance management.
سؤال
Productivity is assessing organisational performance efficiency by measuring the ______________.

A) output
B) input
C) ratio of human resources relative to other resources
D) ratio of outputs relative to inputs
سؤال
Characteristics of a service organisation are that:

A) inputs are transformed into tangible outcomes - the consumer is not necessarily involved in the process of delivery.
B) materials are transformed to intangible products to serve the clients.
C) C: inputs are immediately transformed into tangible outcomes - the customer is necessarily involved in the process of delivery.
D D: inputs are immediately transformed into tangible outcomes - idle capacity to produce the services . can be used to strengthen the output.
سؤال
According to Slack & Lewis (2002), operations strategy connects and gives guidelines to objectives with ___________ to perform strategically.

A) what and when
B) what, how and when
C) who what and when
D) what, where and when
سؤال
Which is NOT an input into the operations management process?

A) raw materials, human resources
B) technology, capital
C) raw materials, human resources 2 choices the same?
D) capital, information technology
سؤال
The tension between market strategy and the ability of an organisation to deliver are often the driving force for operational ________________ .

A) organisation
B) change
C) improvement
D) breakdown
سؤال
The facility decision process to expand or contract the operation of an organisation does NOT include _____________ and ____________ in their four step model:

A) management of plant - organisation capacity
B) comparison of capacity - future demand
C) customer appreciation of product - generation of alternatives
D) consideration of risk - decision making of final plan
سؤال
A process layout is a production configuration where:

A) components are grouped according to type of function performed.
B) products or clients remain in one location and required tools/equipment are brought to that location.
C) all resources needed for a specific group of products or clients are arranged in a small location.
D) processing components are placed in groups by function.
سؤال
A cellular layout provides resources needed for:

A) all groups of clients in a large area.
B) a specific group of clients in any small area.
C) a specific group of clients in a small designated area.
D) any sized group of clients in any sized area.
سؤال
Managers separate most location problems into four categories:

A) single facility, multiple factories, competitive retail outlets and emergency services.
B) environmental factors, single facility, competitive retail outlets and emergency services.
C) Social factors, environmental factors, multiple factories and emergency services.
D) Social factors, environmental factors, multiple factories and competitive retail outlets.
سؤال
Computer-Integrated Manufacturing (CIM) is the computerised integration of all major functions associated with the production of a product, including product design and engineering, as well as:

A) machine instruction.
B) materials production.
C) stock taking.
D) processing.
سؤال
Computer-aided manufacturing (CAM) systems rely on other computerised systems. What functions do they NOT rely on?

A) Computers to prepare, review and evaluate product design
B) Computers to design and control production processes
C) Computers to control machines and production processes
D) Computers to coordinate distribution process
سؤال
Forecasting for an oil company would involve:

A) short term prediction only.
B) short term and long term prediction.
C) long term prediction only.
D) long term and progressive prediction.
سؤال
Capacity planning is centred around capacity measures NOT assessing the need for:

A) people.
B) major physical resources.
C) facilities.
D) none of the given answers.
سؤال
A national transport company would take into account all three time horizons, short, medium and long range in their capacity planning. Which one of the following time horizons consider the human resources in their plans?

A) long range, short range
B) long range, medium range
C) medium range, short range
D) all three time horizons
سؤال
A hospital's measure of capacity would NOT include:

A) medical and nursing staff.
B) operation theatres.
C) beds.
D) administration staff.
سؤال
Aggregate planning balances market demand with:

A) production output.
B) organisation capacity.
C) organisational vision.
D) none of the given answers.
سؤال
Which of the following is NOT a major approach to cope with an uncertain short- and intermediate term market where managers may have to anticipate fluctuating demand?

A) hiring part-time workers
B) paying overtime
C) stopping multi-skilling staff
D) taking back-orders
سؤال
Computerised production and inventory control systems support managers' planning capacity by giving them the opportunity to simulate proposed _____________ .

A) time frames
B) inventories
C) production reduction
D) production schedules
سؤال
The master production schedule is a useful tool for managers. What is NOT an advantage of using the MPS?

A) It helps to assess different schedules
B) It helps to determine required materials
C) It gives specific information on past needs
D) It helps to assess staffing needs
سؤال
The computer planning that ensures all materials needed are available, and immediate action is possible at the right time, is called:

A) materials-requirements planning
B) materials-deficiency planning
C) demand inventory requirement planning
D) none of the given answers
سؤال
A car manufacturer relying on different components from other manufacturing sources would use a ___________ - demand inventory to handle their material and component requirements:

A) production
B) independent
C) dependent
D) material
سؤال
The system using three inputs - a master production schedule, bill-of-materials information and inventory status information - to produce the end product is called:

A) aggregate-production planning.
B) bill-of-materials system.
C) master production system.
D) materials-requirements planning system.
سؤال
Which statement is correct? The bill-of-materials:

A) lists specific sections of each production unit.
B) lists all components needed to make an end product.
C) is not hierarchically arranged.
D) is not concerned about quantities needed.
سؤال
The difference between a bill-of-activities and a bill-of-materials is:

A) BOA determines activities and personnel needs; BOM lists all production components.
B) BOA only concentrates on production activities; BOM lists all production components.
C) BOA lists only personnel needs for production purposes; BOM lists components section by section.
D) none of the given answers.
سؤال
Operations managers in complex manufacturing rely heavily on the four outputs triggered by the materials-requirement planning system. Which is NOT one of these outputs?

A) materials orders
B) data to set production schedules
C) identification of faulty material
D) data on costs, quality and activity
سؤال
Manufacturing-resource planning II is NOT:

A) a computer based information system.
B) the expanded MRP system.
C) a system not for the service firms.
D) expensive and takes time to set up.
سؤال
The organisational purpose of any inventory is:

A) to deal with uncertainty of supply.
B) to provide better customer service.
C) to be able to more advantageously purchase required materials.
D) all of the given answers.
سؤال
A manager uses the inventory control method 'Economic Order Quality' (EOQ) to help him/her:

A) minimise the ordering and holding costs.
B) avoid stock-out costs.
C) know the reorder point.
D) all of the given answers.
E) none of the given answers.
سؤال
Modern operations management includes external linkages to the internal operations. They DO NOT include:

A) supplier base for raw materials.
B) supplier base for bought-out components.
C) customers.
D) shopkeepers.
سؤال
A shopkeeper will pay far more attention to importance of purchasing the goods for his business due to:

A) ever rising costs.
B) slow technological changes.
C) dislike to learn about technical information.
D) decrease in the quality of goods.
سؤال
Which is NOT a back office operation?

A) cataloguer
B) operation theatre nurse
C) waiting staff
D) mechanics
سؤال
Total quality management refers to a system that:

A) is integral to any organisation's strategy.
B) ensures maintenance of quality of product.
C) ensures maintenance of quality of service.
D) maintains customer loyalty.
سؤال
Which aims form part of Deming, Juran and Ishikawa's TQM philosophy?

A) Have useful products & services - foster employees' work satisfaction
B) Stay in business - aid community stability
C) Meet customer needs - foster employees' growth
D) All of the given answers
سؤال
'Manage by fact' means:

A) data collection is done from all levels.
B) data is used to identify priority problems.
C) trace causes for problems.
D) all of the given answers
سؤال
Performance is an important quality dimension for a hospital. A client would expect:

A) prompt service and fast discharge.
B) prompt service and quality pain management.
C) free service and friendly staff.
D) clean bed and tasty meals.
سؤال
Benchmarking is a process used to:

A) identify weaknesses in the production and industry.
B) blame employees for slackness.
C) identify best practice.
D) move forward and become known.
سؤال
The first step in the six sigma approach is called _______________ .

A) measure
B) understand
C) explain
D) define
سؤال
World class companies share:

A) operating locations world wide.
B) excellent organisation core operations.
C) customer services on every continent.
D) same reliable process followed at each level of the organisation.
سؤال
Purchasing is a process of acquiring for remuneration of goods and services.
سؤال
Operations management affects the very core of any organisation, namely to plan, control direct and set strategies.
سؤال
The service for a customer ordering a standard car with an optional sunroof can be classified as a high consumer service.
سؤال
The four stages on operations management's strategic role by Wheelwright and Hayes suggest that the operations management function has different roles at each individual stage determining the strategy of the organisation.
سؤال
When an operations manager in a planning session talks about facilities, s/he refers to major physical inputs that substantially determine productivity and involve significant capital investment.
سؤال
Advancement in technology has made management operations far more tedious because too many people need to be consulted before moving on with the task.
سؤال
A master production schedule is the next step from the planning process into the production process.
سؤال
What would you identify as the core operational role in an organisation?
سؤال
What equation would you use to measure total productivity? How does that differ from an equation for partial-factor productivity?
سؤال
How do manufacturing and service organisations differ in their needs and expectations?
سؤال
What elements are used in operations management to transform inputs into goods and services?
سؤال
What approaches would you use to compare and contrast different operational strategies?
سؤال
When designing and utilising facilities what four steps are related to expansion and contracting decisions?
سؤال
How are each of the four main facility layouts used?
سؤال
How does technology help with planning and controlling operations activities?
سؤال
How does the Just-in-Time inventory system relate to control and link to the external environment?
سؤال
What issues are most important in discussions of the future trends in operations management?
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/57
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 16: Operations Management
1
The core business process of an organisation centres around:

A) operations resources.
B) organisations systems.
C) employees involved in the production.
D) all of the given answers.
E) none of the given answers.
operations resources.
2
An operations manager is NOT required in:

A) inventory control.
B) marketing.
C) food and beverage management.
D) quality assurance management.
marketing.
3
Productivity is assessing organisational performance efficiency by measuring the ______________.

A) output
B) input
C) ratio of human resources relative to other resources
D) ratio of outputs relative to inputs
ratio of outputs relative to inputs
4
Characteristics of a service organisation are that:

A) inputs are transformed into tangible outcomes - the consumer is not necessarily involved in the process of delivery.
B) materials are transformed to intangible products to serve the clients.
C) C: inputs are immediately transformed into tangible outcomes - the customer is necessarily involved in the process of delivery.
D D: inputs are immediately transformed into tangible outcomes - idle capacity to produce the services . can be used to strengthen the output.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
5
According to Slack & Lewis (2002), operations strategy connects and gives guidelines to objectives with ___________ to perform strategically.

A) what and when
B) what, how and when
C) who what and when
D) what, where and when
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
6
Which is NOT an input into the operations management process?

A) raw materials, human resources
B) technology, capital
C) raw materials, human resources 2 choices the same?
D) capital, information technology
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
7
The tension between market strategy and the ability of an organisation to deliver are often the driving force for operational ________________ .

A) organisation
B) change
C) improvement
D) breakdown
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
8
The facility decision process to expand or contract the operation of an organisation does NOT include _____________ and ____________ in their four step model:

A) management of plant - organisation capacity
B) comparison of capacity - future demand
C) customer appreciation of product - generation of alternatives
D) consideration of risk - decision making of final plan
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
9
A process layout is a production configuration where:

A) components are grouped according to type of function performed.
B) products or clients remain in one location and required tools/equipment are brought to that location.
C) all resources needed for a specific group of products or clients are arranged in a small location.
D) processing components are placed in groups by function.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
10
A cellular layout provides resources needed for:

A) all groups of clients in a large area.
B) a specific group of clients in any small area.
C) a specific group of clients in a small designated area.
D) any sized group of clients in any sized area.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
11
Managers separate most location problems into four categories:

A) single facility, multiple factories, competitive retail outlets and emergency services.
B) environmental factors, single facility, competitive retail outlets and emergency services.
C) Social factors, environmental factors, multiple factories and emergency services.
D) Social factors, environmental factors, multiple factories and competitive retail outlets.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
12
Computer-Integrated Manufacturing (CIM) is the computerised integration of all major functions associated with the production of a product, including product design and engineering, as well as:

A) machine instruction.
B) materials production.
C) stock taking.
D) processing.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
13
Computer-aided manufacturing (CAM) systems rely on other computerised systems. What functions do they NOT rely on?

A) Computers to prepare, review and evaluate product design
B) Computers to design and control production processes
C) Computers to control machines and production processes
D) Computers to coordinate distribution process
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
14
Forecasting for an oil company would involve:

A) short term prediction only.
B) short term and long term prediction.
C) long term prediction only.
D) long term and progressive prediction.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
15
Capacity planning is centred around capacity measures NOT assessing the need for:

A) people.
B) major physical resources.
C) facilities.
D) none of the given answers.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
16
A national transport company would take into account all three time horizons, short, medium and long range in their capacity planning. Which one of the following time horizons consider the human resources in their plans?

A) long range, short range
B) long range, medium range
C) medium range, short range
D) all three time horizons
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
17
A hospital's measure of capacity would NOT include:

A) medical and nursing staff.
B) operation theatres.
C) beds.
D) administration staff.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
18
Aggregate planning balances market demand with:

A) production output.
B) organisation capacity.
C) organisational vision.
D) none of the given answers.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
19
Which of the following is NOT a major approach to cope with an uncertain short- and intermediate term market where managers may have to anticipate fluctuating demand?

A) hiring part-time workers
B) paying overtime
C) stopping multi-skilling staff
D) taking back-orders
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
20
Computerised production and inventory control systems support managers' planning capacity by giving them the opportunity to simulate proposed _____________ .

A) time frames
B) inventories
C) production reduction
D) production schedules
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
21
The master production schedule is a useful tool for managers. What is NOT an advantage of using the MPS?

A) It helps to assess different schedules
B) It helps to determine required materials
C) It gives specific information on past needs
D) It helps to assess staffing needs
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
22
The computer planning that ensures all materials needed are available, and immediate action is possible at the right time, is called:

A) materials-requirements planning
B) materials-deficiency planning
C) demand inventory requirement planning
D) none of the given answers
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
23
A car manufacturer relying on different components from other manufacturing sources would use a ___________ - demand inventory to handle their material and component requirements:

A) production
B) independent
C) dependent
D) material
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
24
The system using three inputs - a master production schedule, bill-of-materials information and inventory status information - to produce the end product is called:

A) aggregate-production planning.
B) bill-of-materials system.
C) master production system.
D) materials-requirements planning system.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
25
Which statement is correct? The bill-of-materials:

A) lists specific sections of each production unit.
B) lists all components needed to make an end product.
C) is not hierarchically arranged.
D) is not concerned about quantities needed.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
26
The difference between a bill-of-activities and a bill-of-materials is:

A) BOA determines activities and personnel needs; BOM lists all production components.
B) BOA only concentrates on production activities; BOM lists all production components.
C) BOA lists only personnel needs for production purposes; BOM lists components section by section.
D) none of the given answers.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
27
Operations managers in complex manufacturing rely heavily on the four outputs triggered by the materials-requirement planning system. Which is NOT one of these outputs?

A) materials orders
B) data to set production schedules
C) identification of faulty material
D) data on costs, quality and activity
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
28
Manufacturing-resource planning II is NOT:

A) a computer based information system.
B) the expanded MRP system.
C) a system not for the service firms.
D) expensive and takes time to set up.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
29
The organisational purpose of any inventory is:

A) to deal with uncertainty of supply.
B) to provide better customer service.
C) to be able to more advantageously purchase required materials.
D) all of the given answers.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
30
A manager uses the inventory control method 'Economic Order Quality' (EOQ) to help him/her:

A) minimise the ordering and holding costs.
B) avoid stock-out costs.
C) know the reorder point.
D) all of the given answers.
E) none of the given answers.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
31
Modern operations management includes external linkages to the internal operations. They DO NOT include:

A) supplier base for raw materials.
B) supplier base for bought-out components.
C) customers.
D) shopkeepers.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
32
A shopkeeper will pay far more attention to importance of purchasing the goods for his business due to:

A) ever rising costs.
B) slow technological changes.
C) dislike to learn about technical information.
D) decrease in the quality of goods.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
33
Which is NOT a back office operation?

A) cataloguer
B) operation theatre nurse
C) waiting staff
D) mechanics
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
34
Total quality management refers to a system that:

A) is integral to any organisation's strategy.
B) ensures maintenance of quality of product.
C) ensures maintenance of quality of service.
D) maintains customer loyalty.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
35
Which aims form part of Deming, Juran and Ishikawa's TQM philosophy?

A) Have useful products & services - foster employees' work satisfaction
B) Stay in business - aid community stability
C) Meet customer needs - foster employees' growth
D) All of the given answers
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
36
'Manage by fact' means:

A) data collection is done from all levels.
B) data is used to identify priority problems.
C) trace causes for problems.
D) all of the given answers
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
37
Performance is an important quality dimension for a hospital. A client would expect:

A) prompt service and fast discharge.
B) prompt service and quality pain management.
C) free service and friendly staff.
D) clean bed and tasty meals.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
38
Benchmarking is a process used to:

A) identify weaknesses in the production and industry.
B) blame employees for slackness.
C) identify best practice.
D) move forward and become known.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
39
The first step in the six sigma approach is called _______________ .

A) measure
B) understand
C) explain
D) define
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
40
World class companies share:

A) operating locations world wide.
B) excellent organisation core operations.
C) customer services on every continent.
D) same reliable process followed at each level of the organisation.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
41
Purchasing is a process of acquiring for remuneration of goods and services.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
42
Operations management affects the very core of any organisation, namely to plan, control direct and set strategies.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
43
The service for a customer ordering a standard car with an optional sunroof can be classified as a high consumer service.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
44
The four stages on operations management's strategic role by Wheelwright and Hayes suggest that the operations management function has different roles at each individual stage determining the strategy of the organisation.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
45
When an operations manager in a planning session talks about facilities, s/he refers to major physical inputs that substantially determine productivity and involve significant capital investment.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
46
Advancement in technology has made management operations far more tedious because too many people need to be consulted before moving on with the task.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
47
A master production schedule is the next step from the planning process into the production process.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
48
What would you identify as the core operational role in an organisation?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
49
What equation would you use to measure total productivity? How does that differ from an equation for partial-factor productivity?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
50
How do manufacturing and service organisations differ in their needs and expectations?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
51
What elements are used in operations management to transform inputs into goods and services?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
52
What approaches would you use to compare and contrast different operational strategies?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
53
When designing and utilising facilities what four steps are related to expansion and contracting decisions?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
54
How are each of the four main facility layouts used?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
55
How does technology help with planning and controlling operations activities?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
56
How does the Just-in-Time inventory system relate to control and link to the external environment?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
57
What issues are most important in discussions of the future trends in operations management?
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 57 في هذه المجموعة.