Deck 7: Bidding and Procurement

ملء الشاشة (f)
exit full mode
سؤال
What is the term used to describe the process of investigating the capability of contractors prior to being selected to bid on an upcoming project?

A) Bonding
B) Prequalification
C) Request for proposal (RFP)
D) Licensing
E) Certification
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
In a "pure" construction management delivery method, the selected subcontractor will sign a contract with the ????

A) Owner
B) Construction manager
C) General contractor
D) Designer
E) None of the above
سؤال
An addendum is a change issued to a bidder after contract award. The accepted addendum may lead to a change in price, time, and/or work required to be accomplished.
سؤال
A ????bond requires that the contractor will accomplish acceptably the work contracted.

A) Bid
B) Performance
C) Payment
D) Lien
E) None of the above
سؤال
One of the current trends in risk management is towards centralized control of all project insurance.
سؤال
Identify in which listed part of a typical bid package the following requested information would be found.

-Would include a change in technical requirements issued prior to bid opening

A) Agreement
B) Instructions to bidders
C) Alternates
D) Drawings, specifications, and addenda
E) General and special conditions
سؤال
Identify in which listed part of a typical bid package the following requested information would be found.

-Would address issues such as parking on the job site, traffic control needs, and prevailing wage provisions

A) Agreement
B) Instructions to bidders
C) Alternates
D) Drawings, specifications, and addenda
E) General and special conditions
سؤال
Identify in which listed part of a typical bid package the following requested information would be found.

-Would indicate the date and location for submission of bids

A) Agreement
B) Instructions to bidders
C) Alternates
D) Drawings, specifications, and addenda
E) General and special conditions
سؤال
Identify in which listed part of a typical bid package the following requested information would be found.

-Owner request for pricing of a substitute material

A) Agreement
B) Instructions to bidders
C) Alternates
D) Drawings, specifications, and addenda
E) General and special conditions
سؤال
Identify in which listed part of a typical bid package the following requested information would be found.

-A liquidated damage clause

A) Agreement
B) Instructions to bidders
C) Alternates
D) Drawings, specifications, and addenda
E) General and special conditions
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/10
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 7: Bidding and Procurement
1
What is the term used to describe the process of investigating the capability of contractors prior to being selected to bid on an upcoming project?

A) Bonding
B) Prequalification
C) Request for proposal (RFP)
D) Licensing
E) Certification
Prequalification
2
In a "pure" construction management delivery method, the selected subcontractor will sign a contract with the ????

A) Owner
B) Construction manager
C) General contractor
D) Designer
E) None of the above
Owner
3
An addendum is a change issued to a bidder after contract award. The accepted addendum may lead to a change in price, time, and/or work required to be accomplished.
False
4
A ????bond requires that the contractor will accomplish acceptably the work contracted.

A) Bid
B) Performance
C) Payment
D) Lien
E) None of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
5
One of the current trends in risk management is towards centralized control of all project insurance.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
6
Identify in which listed part of a typical bid package the following requested information would be found.

-Would include a change in technical requirements issued prior to bid opening

A) Agreement
B) Instructions to bidders
C) Alternates
D) Drawings, specifications, and addenda
E) General and special conditions
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
7
Identify in which listed part of a typical bid package the following requested information would be found.

-Would address issues such as parking on the job site, traffic control needs, and prevailing wage provisions

A) Agreement
B) Instructions to bidders
C) Alternates
D) Drawings, specifications, and addenda
E) General and special conditions
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
8
Identify in which listed part of a typical bid package the following requested information would be found.

-Would indicate the date and location for submission of bids

A) Agreement
B) Instructions to bidders
C) Alternates
D) Drawings, specifications, and addenda
E) General and special conditions
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
9
Identify in which listed part of a typical bid package the following requested information would be found.

-Owner request for pricing of a substitute material

A) Agreement
B) Instructions to bidders
C) Alternates
D) Drawings, specifications, and addenda
E) General and special conditions
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
10
Identify in which listed part of a typical bid package the following requested information would be found.

-A liquidated damage clause

A) Agreement
B) Instructions to bidders
C) Alternates
D) Drawings, specifications, and addenda
E) General and special conditions