Deck 9: Estimating Project Costs

ملء الشاشة (f)
exit full mode
سؤال
Which of the following types of estimates would a contractor most likely use to bid a project?

A) Square foot
B) Unit price
C) Systems
D) Conceptual
E) Aggregate
استخدم زر المسافة أو
up arrow
down arrow
لقلب البطاقة.
سؤال
Which of the following best defines learning curve?

A) Repetition is inversely related to productivity.
B) Productivity increases as repetitions increase.
C) Worker productivity is a constant.
D) Productivity decreases as the size of a project increases.
E) None of the above
سؤال
When adjusting an estimate for time and location, the adjustment for location must be made first.
سؤال
The amount of profit a bidder includes is a factor of ????

A) Extent of perceived risk
B) Level of expected competition
C) Project duration
D) The particular client
E) All of the above
سؤال
As an estimate progresses from conceptual to detailed, it takes longer to prepare and becomes less accurate.
سؤال
The value of the quality to the owner ????as the design quality of a project increases.

A) Increases at a decreasing rate
B) Increases at an increasing rate
C) Increases at a constant rate
D) Decreases
E) Does not change
سؤال
An index measures change with respect to an established baseline.
سؤال
Overhead burden is greatest on which of the following cost categories?

A) In-house material
B) In-house labor
C) In-house equipment
D) Subcontractor
E) Overhead is applied equally to all cost categories
سؤال
The Masterformat specification format, as compared to the Uniformat, better reflects the manner in which a project is built.
سؤال
The level of contingency applied to a project should ????as the project moves towards completion.

A) Increase
B) Decrease
C) Remain constant
فتح الحزمة
قم بالتسجيل لفتح البطاقات في هذه المجموعة!
Unlock Deck
Unlock Deck
1/10
auto play flashcards
العب
simple tutorial
ملء الشاشة (f)
exit full mode
Deck 9: Estimating Project Costs
1
Which of the following types of estimates would a contractor most likely use to bid a project?

A) Square foot
B) Unit price
C) Systems
D) Conceptual
E) Aggregate
Unit price
2
Which of the following best defines learning curve?

A) Repetition is inversely related to productivity.
B) Productivity increases as repetitions increase.
C) Worker productivity is a constant.
D) Productivity decreases as the size of a project increases.
E) None of the above
Productivity increases as repetitions increase.
3
When adjusting an estimate for time and location, the adjustment for location must be made first.
False
4
The amount of profit a bidder includes is a factor of ????

A) Extent of perceived risk
B) Level of expected competition
C) Project duration
D) The particular client
E) All of the above
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
5
As an estimate progresses from conceptual to detailed, it takes longer to prepare and becomes less accurate.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
6
The value of the quality to the owner ????as the design quality of a project increases.

A) Increases at a decreasing rate
B) Increases at an increasing rate
C) Increases at a constant rate
D) Decreases
E) Does not change
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
7
An index measures change with respect to an established baseline.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
8
Overhead burden is greatest on which of the following cost categories?

A) In-house material
B) In-house labor
C) In-house equipment
D) Subcontractor
E) Overhead is applied equally to all cost categories
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
9
The Masterformat specification format, as compared to the Uniformat, better reflects the manner in which a project is built.
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
10
The level of contingency applied to a project should ????as the project moves towards completion.

A) Increase
B) Decrease
C) Remain constant
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.
فتح الحزمة
k this deck
locked card icon
فتح الحزمة
افتح القفل للوصول البطاقات البالغ عددها 10 في هذه المجموعة.